Loading...
HomeMy WebLinkAbout2. Public Works CIP City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction CSAH 21 - CSAH 18 to CSAH 42 $1,700,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 580,000 830,000 Improvements Engineering/Admin. 120,000 170,000 Total 700 000 1 000 000 - - - B. Fundin Source: General Fund Capital Improvement Fund 350,000 500,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid 350,000 500,000 Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base -" Storm Drainage Fund-Trunk Tax Levy Total 700,000 1,000,000 - - - f DescriDtion: Extension of CSAH 21 from CSAH 18 to CSAH 42. + Justification: Scott County traffic will warrant the construction of CSAH 21. Other Comments: City costs will be for a bituminous trail, a traffic signal, storm sewer, and curb & gutter. Construction of a rural section would significantly reduce the City's costs. Scott County has received Federal Grants for 2009 and 2011 construction. Costs shown above are the City's portion of the project. Total estimated project cost is $26,000,000. Operatina Costs: PROJECT LOCATION ~ .. City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2009 Street Reconstruction Program $1,500,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 1,250,000 Improvements Engineering/Admin. 250,000 Total 1,500 000 - - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 300,000 (SPUC) State Aid 170,000 Assessments 270,000 Sanitary Sewer Fund-Base 230,000 Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 80,000 Storm Drainage Fund-Trunk I\) Tax Levy 450,000 Total 1,500,000 - - - - I DescriDtion: Street, sanitary sewer & watermain reconstruction. Pierce Street, from 6th ~ Avenue to 10th Avenue; Clay Street, from Pierce Street to south of 10th Avenue; and Spencer Street, from 10th Avenue to Shakopee Avenue. Justification: To continue with the rehabilitation of the City's infrastructure in the older sections of the community. Other Comments: Sidewalk connection along Spencer Street, from Shakopee Avenue to 10th Avenue is included in project. Operating Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2009 Bituminous Overlay $300,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 240,000 Improvements Engineerin /Admin. 60,000 Total 300 000 - - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid 110,000 Assessments 90,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk w Tax Lev 100,000 Total 300,000 - - - - Descriotion: I Bituminous overlay of Shenandoah Drive and 4th Avenue, from Shenandoah ~ Drive to the Certain Teed property. Justification: Continuation of the City's Pavement Preservation Program to maintain existing infrastructure. Other Comments: Bituminous overlays are more cost effective than reconstructing pavements. Ooeratina Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2009 Pavement Preservation $440,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 360,000 Improvements En ineerin /Admin. 80,000 Total 440,000 - - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (speCify) State Aid 180,000 Assessments 132,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk ./:>. Tax Levy 128,000 Total 440,000 - - - - Descriotion: .I Bituminous reclamation of Boiling Springs Road, from Stagecoach Road to 900' + north of Preserve Trail; and a lJituminous overtay of Stagecoach Road, from Preserve Trail to 600' south of 13th Avenue; and 13th Avenue to the City Limits. Justification: Continuation of the City's Pavement Preservation Program to maintain existing infrastructure. Other Comments: Bituminous overlays and bituminous reclamation projects are more cost effective than reconstructing pavements. Ooeratina Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Fuller Street Trail Extension $450,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 360,000 Improvements En ineerin /Admin. 90,000 Total 450,000 - - - - B. Fundin Source: General Fund Capital Improvement Fund 318,000 Park Reserve Fund Grants (specify) Donations (specify) 118,000 (State &County) State Aid Assessments 14,000 (Escrow) Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk ' Storm Drainage Fund-Basl3 Storm Drainage Fund-Trunk 01 Tax Le Total 450,000 - - - - I Descriotion: Extension of the existing bituminous trail located on Fuller Street south of ~ Highway 169 north to Vierting Drive. This project includes improvements to the bridge over Highway 169. Justification: Other Comments: Staff will apply for a safe routes to school grant. The City could qualify for up to $175,000. The $14,000 assessment is an escrow the City is holding from the Orchard Park Development. Operatina Costs: PROJ ECT LOCATION CIP Projects 2003 - 2008+ City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction CSAH 18 Trail $100,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 80,000 Improvements Engineering/Admin. 20,000 Total 100 000 - - - - B. Fundin Source: General Fund Capital Improvement Fund 100,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk 0> Tax Lev Total 100,000 - - - - f Descriotion: Raise the elevation of the trail along CSAH 18 north of the Glacier Estates ~ Development. Justification: The existing trail floods during times of high water. Other Comments: Operatinq Costs: PROJECT LOCATION CIP Projects 2003 - 2008+ City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Opus Development $1,400,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 1,100,000 Improvements En ineering/Admin. 300,000 Total 1,400,000 - - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 1 ,400,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk ....... Tax Le Total - - - - Descriotion: Extension of a road and utilities to allow for further subdivision of property located in the Industrial Park. Justification: Owner petitioned the City for improvements and has requested that the project be put on hold until 2009. Other Comments: Ooeratina Costs: PROJECT LOCATION CIP Projects 2003 - 2008+ City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Intersection Total Project Cost: Bruce Loney Street Construction Improvements at Old Carriage Road $350,000 and Old Carria e Ct. North A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 280,000 Improvements Engineerin /Admin. 70,000 Total 350,000 - - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 350,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk 00 Tax Levy Total 350,000 - - - - Description: Installation of a traffic control signal or construction of a round-a-bout at Old Carriage Road and Old Carriage Court North. Justification: A traffic study must be completed to determine if improvements are warranted. Other Comments: Operating Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Hansen Avenue from Crossings Blvd. $625,000 To CSAH 18 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 500,000 Improvements En ineerin /Admin. 125,000 Total 625 000 - - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 625,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk co Tax Levy Total 625,000 - - - - Description: Extension of Hansen Avenue to CSAH 18 from Crossings Blvd. to serve Shakopee Crossings East development and improved access to CSAH 18. Project includes acceleration and deceleration lanes on CSAH 18. Justification: Developer would petition the City for a 429 Special Assessment project to construct Hansen Avenue to improve traffic circulation for commercial area development. Other Comments: Scott County would need to allow access to CSAH 18 in order for project to proceed. Ooerating Costs: City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2010 Pavement Preservation $570,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 500,000 Improvements En ineering/Admin. 70,000 Total - 570,000 - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid 150,000 Assessments 150,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 50,000 -" Storm Drainage Fund-Trunk o Tax Le 220,000 Total - 570,000 - - - f Descriotion: Bituminous Overlay. 4th Avenue from Gorman Street to Scott Street and ~ Spencer Street from 4th Avenue to Shakopee Avenue. Justification: Continuation of the City's Pavement Preservation Program to improve paved roadways. Other Comments: Bituminous overlays are much more cost effective than reconstructing pavements. Streets will be evaluated each year and may be moved up or moved back in the CIP. Operatina Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2010 Bituminous Overlay $400,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 320,000 Improvements Engineering/Admin. 80,000 Total - 400 000 - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 120,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base -" Storm Drainage Fund-Trunk -L Tax Levy 280,000 Total - 400,000 - - - I Descriotion: Bituminous overlay of 2nd Avenue and 3rd Avenue, from Atwood Street to ~ Sommerville Street; 1 st Avenue, from Holmes Street to Sommerville Street; Atwood Street, Fuller Street, Lewis Street and Sommerville Street, from 1 st Avenue to 4th Avenue; and Holmes Street, from 1st Avenue to 3rd Avenue. Justification: Continuation of the City's Pavement Preservation Program to maintain existing infrastructure. Other Comments: Bituminous overlays are much more cost effective than reconstructing pavements. Streets will be evaluated each year and may be moved up or moved back in the CIP. Operatina Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2010 Street Reconstruction $1,800,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 1,450,000 Improvements Engineering/Admin. 350,000 Total - 1 800 000 - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 330,000 (SPUC) State Aid Assessments 330,000 Sanitary Sewer Fund-Base 225,000 Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 100,000 -" Storm Drainage Fund-Trunk I\) Tax Levy 815,000 Total - 1,800,000 - - - Descriotion: ~ f Sanitary sewer, storm sewer, watermain and street reconstruction of 7th and 8th + Avenue, from Market Street to east of Dakota Street and Minnesota Street and Dakota Street, from 7th Avenue to Shakopee Avenue. . .~ Justification: j . Continue with the rehabilitation of the City's infrastructure in the older sections of the City. Other Comments: Streets will be evaluated each year and may be moved up or moved back in the CIP. Ooeratina Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Railroad Signalization $400,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 320,000 Improvements Engineerin /Admin. 80,000 Total - 400 000 - - - B. Fundin Source: General Fund Capital Improvement Fund 100,000 Park Reserve Fund Grants (specify) Donations (specify) 300,000 (MN/DOT) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base -" Storm Drainage Fund-Trunk w Tax Levy Total - 400,000 - - - Descriotion: j At grade railroad crossings at Scott Street and Apgar Street will need crossing + signal due to traffic volumes at these intersections. Justification: Traffic volumes of vehicles crossing, increased number of trains and possible increased speed of trains warrant the signal installation. Other Comments: Funding from the State of Minnesota is programmed for these intersections. City cost is for 10% of signal cost and roadway realigned to place signals. Ooeratina Costs: PROJECT LOCATION City of Shako pee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction C.R.101Improvements, from CSAH $540,000 17 to Fillmore Street A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 415,000 Improvements Engineering/Admin. 125,000 Total - 540 000 - - - B. Fundin Source: General Fund Capital Improvement Fund 200,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base 240,000 Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 100,000 -" Storm Drainage Fund-Trunk ./:>. Tax Lev Total - 540,000 - - - Descriotion: I Street, sanitary sewer, storm sewer and watermain improvements to C.R. 101, ~ from CSAH 17 to Fillmore Street. Justification: ., Other Comments: This would be a County project with the City contributing funds for sanitary sewer, storm sewer and concrete curb and gutter. Costs above are only for the City's portion of the project. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Shenandoah Business Park $500,000 1m rovements A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 400,000 Improvements Engineerin /Admin. 100,000 Total - 500,000 - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) . State Aid Assessments 500,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base -" Storm Drainage Fund-Trunk CJ1 Tax Le Total - 500,000 - - - f Descriotion: + Infrastructure for Industrial Property east of Shenandoah Drive and North of Fourth Avenue. Justification: ,:~ Sanitary sewer, watermain, storm sewer and streets are needed to serve this development. Other Comments: Property owner may request a 429 Special Assessment Public Improvement Project. Developer may want to request assistance from City due to the subsurface conditions and to allow sanitary sewer and storm sewer lift stations to develop the site. Operating Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction T.H. 101 Trail Extension $50,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 40,000 Improvements Engineering/Admin. 10,000 Total - 50,000 - - - B. Fundin Source: General Fund Capital Improvement Fund 50,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base -" Storm Drainage Fund-Trunk 0> Tax Levy Total - 50,000 - - - 'I Descriotion: Construction of a bituminous trail on the south side of C.R. 101, from Sarazin + Street to the bridge over the Mill Pond. Justification: Pedestrian traffic in the area may warrant construction of this trail. Other Comments: Operatina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2011 Bituminous Overlay $260,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 210,000 Improvements Engineering/Admin. 50,000 Total - - 260 000 - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 78,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base -" Storm Drainage Fund-Trunk -...j Tax Le 182,000 Total - - 260,000 . - - f Descriotion: Bituminous Overlay of Ruby Lane, Ruby Circle, Granite Drive, Granite Court and ~ Sapphire Lane, from Vierling Drive to Murphy Avenue and Heritage Drive, from Vierling Drive to Onyx Drive. Justification: Continuation of the City's Pavement Preservation Program to maintain existing infrastructure. Other Comments: Streets will be evaluated each year and may be moved up or moved back in the CIP. Ooerating Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction TH300 Reconstruction $2,200,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 1,750,000 Improvements Engineering/Admin. 450,000 Total - - 2 200 000 - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 250,000 (SPUC) State Aid 1,320,000 (State Turnback Funds) Assessments 380,000 Sanitary Sewer Fund-Base 250,000 Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base -" Storm Drainage Fund-Trunk (X) Tax Levy Total - - 2,200,000 - - I Descriotion: Reconstruction of old T.H. 300. 6th Avenue, from 10th Avenue to Adams Street ~ and.1Oth Avenue, from 6th Avenue to C.R. 69. Justification: To continue with the rehabilitation of the City's infrastructure in the older sections of the community. Other Comments: City does qualify for State Turnback funds for improving Old T.H. 300, which has been turnbacked to the City. Ooeratina Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: 2011 Bit. Overlay Total Project Cost: Bruce Loney Street Construction Vierling Drive from C.R. 79 to CSAH $525,000 16 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 425,000 Improvements En ineering/Admin. 100,000 Total - - 525,000 - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid 250,000 Assessments 130,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base -" Storm Drainage Fund-Trunk <.0 Tax Le 145,000 Total - - 525,000 - - f Descriotion: Bituminous Overlay. Vierling Drive, from C.R. 79 to Limestone Drive. + Justification: Continuation of the City's Pavement Preservation Program to maintain existing infrastructure. Other Comments: Bituminous overlays are more cost effective than reconstructing pavements. Vierling Drive will be evaluated each year and may be moved up or moved back in the CIP. Operatina Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2011 Reconstruction Project $2,100,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 1,900,000 Improvements Engineering/Admin. 200,000 Total - - 2100000 - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 270,000 (SPUC) State Aid Assessments 450,000 Sanitary Sewer Fund-Base 230,000 Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 100,000 I\) Storm Drainage Fund-Trunk 0 Tax Levy 1,050,000 Total - - 2,100,000 - - Descriotion: f Street, sanitary sewer and watermain reconstruction. + Justificatlon: To continue with the rehabilitation of the City's infrastructure in the older sections of the City. Other Comments: SPUC has not determined the extent of the watermain improvements. Streets will be evaluated each year and may be moved up or moved back in the CIP. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Trail Extension along CSAH 18 $65,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 50,000 Improvements Engineering/Admin. 15,000 Total - - 65 000 - - B. Fundin Source: General Fund Capital Improvement Fund 43,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 22,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base l\) Storm Drainage Fund-Trunk -" Tax Levy Total - - 65,000 - - I Descriotion: Construction of a bituminous trail along CSAH 18 from Glacier Estates to ~ Crossings Boulevard. Justification: Pedestrian traffic in the area may warrant construction of this trail segment. Other Comments: The City has $22,081.00 in an escrow account for the construction of this trail. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Traffic control signal or round-a- $650,000 bout for C.R. 79 and Vierlin Dr. A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 500,000 Improvements Engineering/Admin. 150,000 Total - - 650,000 - - B. Fundin Source: General Fund Capital Improvement Fund 150,000 Park Reserve Fund Grants (specify) Donations (specify) 500,000 (County) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base I\) Storm Drainage Fund-Trunk I'\) Tax Levy Total - - 650,000 - - Descriotion: <I 1 New traffic control signal or round-a-about at County Road 79 and Vierling ~ ! + intersection. '1' Justification: I Sufficient traffic movements may warrant the signal system. A warrant study will need to be done to justify the signal. Other Comments: Relocation of High School to the south will change traffic patterns and may justify a signal or round-a-bout at this time. Scott County has jurisdiction over the . intersection. Ooeratina Costs: PROJECT LOCATION $2,400/year for operating and maintenance costs if a signal is installed. City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 12th Avenue Trail $200,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 160,000 Improvements Engineering/Admin. 40,000 Total - - 200 000 - B. Fundin Source: General Fund Capital Improvement Fund 200,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base I\) Storm Drainage Fund-Trunk w Tax Lev Total - - 200,000 - - Descriotion: Construct a bituminous trail from CSAH 83 to Quarry Lake Park. Justification: Other Comments: Ooerating Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Shenandoah Drive Extension $1,450,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW 200,000 Construction 1,000,000 Improvements Engineering/Admin. 250,000 Total - - 1 450 000 - - B. Fundin Source: General Fund Capital Improvement Fund 250,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid 300,000 Assessments 900,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base I\) Storm Drainage Fund-Trunk ./:>. Tax Lev Total - - 1,450,000 - - ,''''' I Descriotion: Shenandoah Drive extension from Eastway Avenue to CSAH 16. + Justification: This roadway would serve as a local collector and provide access to nearby property. This project is very much developer driven. Other Comments: Construction of this roadway may be accelerated if racino is built. Ooeratina Costs: . - PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2012 Bituminous Overlay $160,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 130,000 Improvements Engineerin /Admin. 30,000 Total - - - 160 000 - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 48,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base I\) Storm Drainage Fund-Trunk (J1 Tax Levy 112,000 Total - - - 160,000 - I Descriotion: Bituminous overlay of Minnesota Street, from Vierling Drive to 11th Avenue, ~ Minnesota Court, Clover Court and Vierting Court. Justification: Continuation of the City's Pavement Preservation Program to maintain existing infrastructure. Other Comments: Bituminous overlays are more cost effective than reconstructing pavements. Streets will be evaluated on a yearly basis and may be moved up or moved back in the CIP. Operatinq Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2012 Pavement Preservation $360,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 270,000 Improvements Engineerin /Admin. 90,000 Total - - - 360 000 - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 110,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base I\) Storm Drainage Fund-Trunk en Tax Lev 250,000 Total - - - 360,000 - I Descriotion: Bituminous overlay of 11th Avenue, from Polk Street to Adams Street; Monroe + Street, Madison Street and Jefierson Street, from 10th Avenue to 11th Avenue; and Polk Street, Harrison Street and Jackson Street, from 11th Avenue to 12th Avenue. Justification: Continuation of the city's pavement preservation program to maintain existing infrastructure. Other Comments: Streets will be evaluated on a yearly basis and may be moved up or moved back in the CIP. Ooeratina Costs: PROJECT LOCA TION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 3rd Avenue Street Reconstruction $1,350,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 1,100,000 Improvements Engineering/Admin. 250,000 Total - - - 1 350 000 - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 260,000 (SPUC) State Aid Assessments 240,000 Sanitary Sewer Fund-Base 240,000 Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 50,000 I\) Storm Drainage Fund-Trunk ...... Tax Le 560,000 Total - - - 1,350,000 - I Descriotion: Street, sanitary sewer, storm sewer and watermain reconstruction on 3rd + Avenue, from CSAH 17 to Spencer Street and on Minnesota street, from 3rd Avenue to C.R. 101. Justification: Continuation of City's Pavement Preservation Program to improve paved roadways. Other Comments: Streets will be evaluated on a yearly basis and may be moved up or moved back in the CIP. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Independence Dr. 1/8 Mile South of $310,000 Valle View Rd. A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 250,000 Improvements Engineering/Admin. 60,000 Total - - - 310 000 - B. Fundin Source: General Fund Capital Improvement Fund 93,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 217,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base I\J Storm Drainage Fund-Trunk ex> Tax Levy Total - - - 310,000 - I Descriotion: Collector street construction on Independence Drive for a 1/8 mile south of + Valley View Road. Includes sanitary sewer and watennain extensions. Justification: Collector street needs to be installed to provide access to developer's properties south of Valley View Road. Other Comments: Project is very much dependent on development. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Traffic Control Signal at Vierling $250,000 Drive and C.R. 69 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 200,000 Improvements En ineering/Admin. 50,000 Total - - - 250,000 - B. Fundin Source: General Fund Capital Improvement Fund 125,000 Park Reserve Fund Grants (specify) Donations (specify) 125,000 (County) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base I\) Storm Drainage Fund-Trunk <.0 Tax le Total - - - 250,000 - f Descriotion: New traffic control signal at Vierling Drive and County Road 69 intersection. ~ Justification: Sufficient traffic movements may warrant a traffic signal. A warrant study will need to be done to justify the signal. Redevelopment of commercial district is needed to generate traffic for signal system. Other Comments: Will need to coordinate funding and signal justification with the County. Ooeratina Costs: PROJECT LOCATION $2000/year for power City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Vierling Drive - C.R. 69 to Taylor St. $670,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW 100,000 Construction 450,000 Improvements Engineering/Admin. 120,000 Total - - - 670 000 - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid 170,000 Assessments 500,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base w Storm Drainage Fund-Trunk 0 Tax Levy Total - - - 670,000 - f Descriotion: ~ The construction of streeL utility, sidewalk and trail system from County Road 69 to Taylor Street. Justification: Vierling Drive completion is needed to provide access to commercial property south of Shakopee Town Square and North of the Shakopee By-Pass while completing this east-west collector system. Other Comments: This project is dependent on a commercial development proposal adjacent to this street. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Bituminous Reclamation of 4th Ave. $320,000 from CertainTeed to CSAH 83 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 250,000 Improvements En ineerin /Admin. 70,000 Total - - - - 320,000 B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid 230,000 Assessments 90,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base (.0.) Storm Drainage Fund-Trunk -" Tax Le Total - - - - 320,000 Descriotion: I Bituminous reclamation of 4th Avenue, from the CertainTeed property to CSAH + 83, and construction of a right turn lane at CSAH 83. Justification: Traffic levels from development do not warrant construction of a three lane roadway. Other Comments: Ooeratina Costs: PROJECT LOCA 110N City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction CSAH 17 Expansion $25,000,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 23,000,000 Improvements En ineerin /Admin. 2,000,000 Total - - - - 25 000 000 B. Fundin Source: General Fund Capital Improvement Fund 800,000 Park Reserve Fund Grants (specify) Donations (specify) 23,400,000 (County) State Aid 800,000 Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base w Storm Drainage Fund-Trunk I\) Tax Le Total - - - - 25,000,000 "I Descriotion: Expansion of CSAH 17, from St. Francis Avenue to CSAH 42. ..~~ ~. Justification: Projected traffic volumes warrant the expansion of CSAH 17. Other Comments: City costs will be for a bituminous trail, storm sewer and concrete curb & gutter. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2013 Street Reconstruction Program $2,400,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 2,000,000 Improvements En ineerin /Admin. 400,000 Total - - - - 2 400 000 B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 380,000 (SPUC) State Aid Assessments 900,000 Sanitary Sewer Fund-Base 290,000 Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 100,000 w Storm Drainage Fund-Trunk w Tax Le 730,000 Total - - - - 2,400,000 Descriotion: 1 Street, Sanitary Sewer, Storm Sewer, and watermain reconstruction: ~ Bluff Avenue from Main Street to MalSchaU Road , Main Street and Prairie Street from Bluff Avenue to 1st Avenue Dakota Street from Bluff Avenue to 2nd Ave Naumkeag Street from 1 st Avenue to Bluff Avenue Minnesota Street from Bluff Avenue to 1st Avenue Scott Street and Atwood Street from Levee Drive to 1 st Avenue Levee Drive from Scott Street to Holmes Street Justification: To continue with the rehabilitation of the City's infrastructure in the older sections of the community. Other Comments: Reconstruction of streets should be done in conjunction with redevelopment of the area. SPUC has not determined the extent of the watermain improvements. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction CSAH 15 - T.H. 169 to 17th Ave. $1,300,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 1,000,000 Improvements En ineerin /Admin. 300,000 Total - - - - 1 300 000 B. Fundin Source: General Fund Capital Improvement Fund 100,000 Park Reserve Fund Grants (specify) Donations (specify) 550,000 (County) State Aid Assessments 650,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base w Storm Drainage Fund-Trunk ./:>. Tax Le Total - - - - 1,300,000 Descriotion: I County road expanded to four lanes to meet growing traffic due to commercial + development along CSAH 15. Justification: County road needs to be upgraded to provide for increased traffic due to future commercial development. Other Comments: Dependent upon rate of commercial development in the area and County approval. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Extension of Total Project Cost: Bruce Loney Street Construction Valley View & Control Signal at CSAH $1,000,000 17 & Valle View A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 800,000 Improvements En ineerin /Admin. 200,000 Total - - - - 1 000 000 B. Fundin Source: General Fund Capital Improvement Fund 260,000 Park Reserve Fund Grants (specify) Donations (specify) 100,000 (County) State Aid Assessments 640,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base w Storm Drainage Fund-Trunk CJ1 Tax Lev Total - - - - 1,000,000 II Descriotion: . ... Extension of Valley View Road to Sarazin Street and construction of a new traffic + control signa' at the Valley View Road and CSAH 17 intersection. Justification: . Growth in the area and traffic will warrant construction of this roadway. Sufficient traffic movements may warrant the signal system. A warrant study will need to be done to justify the signal. Other Comments: Will need to coordinate the project with the County. Ooerating Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Concrete Alleys $420,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 320,000 Improvements En ineerin /Admin. 100,000 Total - - - - 420,000 B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 100,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 320,000 w Storm Drainage Fund-Trunk 0> Tax Le Total - - - - 420,000 Descriotion: I Reconstruct existing alleys with concrete pavement. A Justification: V To rehabilitate existing alleys and improve drainage. Other Comments: Project location has not been determined. Ooerating Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Downtown Paver Replacement $350,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 300,000 Improvements En ineerin /Admin. 50,000 Total - - - - 350 000 B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 175,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base w Storm Drainage Fund-Trunk '"'-.I Tax Le 175,000 Total - - - - 350,000 Descriotion: f Replace heaved or settled pavers in the downtown. + Justification: Heaved and settled pavers are a tripping hazard. Other Comments: Council should consider eliminating some or all of the pavers. Ooerating Costs: ., - << $5,000/year PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Sanitary Sewer Annual Cured-in-Place Pipe Project $440,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 400,000 400,000 150,000 Improvements Engineering/Admin. 40,000 40,000 20,000 Total 440,000 440,000 170,000 - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base 440,000 440,000 170,000 Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base w Storm Drainage Fund-Trunk 00 Tax Levy Total 440,000 440,000 170,000 - - Descriotion: Annual cured-in-place pipe project. Justification: Necessary to extend the life of existing sanitary sewer. Other Comments: Project area to be determined based on yearly televising. Ooerating Costs: City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Sanitary Sewer Area JT-D $170,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 150,000 Improvements Engineering/Admin. 20,000 Total 170000 - - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk 170,000 Storm Drainage Fund-Base w Storm Drainage Fund-Trunk co Tax Levy Total 170,000 - - - - Descriotion: Extension of trunk sewer to serve area in MUSA. Other Comments: Trunk sewer will be extended through developments. This project is development dependent. Operatina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Sanitary Sewer Area SE-C (Phase III) $180,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 150,000 Improvements Engineering/Admin. 30,000 Total - - 180 000 - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk 180,000 Storm Drainage Fund-Base ,J:>. Storm Drainage Fund-Trunk 0 Tax lev Total - - 180,000 - - 1 Descriotion: Extension of trunk sewer to serve future development. ~ Justification: Sewer extension is part of the City's sanitary sewer plan and is needed in order for area to develop. Other Comments: Trunk sewer will be extended as the area develops. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Extend Sewer and Total Project Cost: Bruce Loney Sanitary Sewer Water to Serve Hilldale Road $450,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW 60,000 Construction 300,000 Improvements Engineering/Admin. 90,000 Total - - 450,000 - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 310,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base ./:>. Storm Drainage Fund-Trunk -" Tax Levy 140,000 Total - - 450,000 - - , ~ ~ ~~ f Descriotion: , " 'f~ Extension of sewer and water to serve the property adjacent to Hilldale Drive. , ~ c' ~ + The project includes reconstructing Hilldale Drive wiih concrete curb and gutter. .' ,,~N. Justification: ': ' Homeowners may request sewer service due to failing septic systems. Other Comments: Project needs to be petitioned for by residents affected. Property to the west must develop prior to the extension of sewer to Hilldale Road. Ooeratina Costs: !:jj PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Sanitary Sewer 1st Avenue Sewer Ext. (Apgar) $140,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 110,000 Improvements En ineering/Admin. 30,000 Total - - 140 000 - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 140,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base ./:>. Storm Drainage Fund-Trunk I\J Tax Levy Total - - 140,000 - - Descriotion: + ~:nn:~on of san nary sewer to serve an area wnhout municipal sewer along 1 sl Justification: To replace existing on site systems which may be at the end of their life with municipal sanitary sewer service. Other Comments: This project needs to be initiated by existing property owners, redevelopment, or public health hazard concerns. Ooeratina Costs: . PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Sanitary Sewer Trunk Sewer Extension South of $300,000.00 Valle View Rd. & W. of C.R. 83 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 240,000 Improvements Engineering/Admin. 60,000 Total - - - 300 000 - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 100,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk 200,000 Storm Drainage Fund-Base ./:>. Storm Drainage Fund-Trunk w Tax Le Total - - - - Other Comments: Timing depends on MUSA allocation and property owners willing to develop. Trunk sewer may be installed in conjunction with private developments. Ooerating Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Extend Sewer and Total Project Cost: Bruce Loney Sanitary Sewer Water to Serve Hillside Estates $900,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 750,000 Improvements Engineering/Admin. 150,000 Total - - - - 900 000 B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 690,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base .t::>. Storm Drainage Fund-Trunk ./:>. Tax Levy 210,000 Total - - - - 900,000 Description: f Extension of sewer and water to serve Hillside Estates. The project includes + reconstructing Hillside Drive with concrete curt> and gutter. Justification: Homewowners may request sewer service due to failing septic systems. Other Comments: Project needs to be petitioned for by the affected property owners. The costs assume extending utilities prior tb development of the property to the east. Extending utilities to this area, after the property to the east develops, will result in reduced costs of approximately $200,000. Operatina Costs: -- PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Sanitary Sewer CSAH 18 Sewer Extension $625,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 500,000 Improvements 125,000 Engineering/Admin. Total - - - - 625 000 B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 45,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk 580,000 Storm Drainage Fund-Base ./:>. Storm Drainage Fund-Trunk 01 Tax Levy Total - - - - 625,000 DescritJtion: .1 f Extend sanitary sewer to serve the Whispering Oaks development. + Justification: To eliminate the existing lift statidn and eliminate flow into the Savage sewer system. Other Comments: Maintenance trail construction may be included with project which could serve as a trail along CSAH 18. County may participate in other trail segments. Operatina Costs: - PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer PLSL Channel Improvements $745,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 230,000 210,000 80,000 75,000 50,000 Improvements En ineerin /Admin. 45,000 40,000 5,000 5,000 10,000 Total 275,000 250,000 85,000 80,000 60,000 B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 50,000 100,000 85,000 75,000 60,000 ./:>. Storm Drainage Fund-Trunk 225,000 150,000 m Tax Levy Total 275,000 250,000 85,000 75,000 60,000 Description: f Additional capacity and control structures in the Prior Lake/Spring Lake Channel ~ to handle increased run-off due to development. Justification: Existing agreement with Prior Lake/Spring Lake Watershed District (PLSLWD) requires the City to maintain the channel upon the City utilizing the channel for urban development. Increased runoff from development will require a larger channel. This project is for the purchase of right-af-way for future construction of the improved channel and for a segment of the channel construction and maintenance to establish a bio-engineered channel. Other Comments: Prior Lake/Spring Lake has indicated a willingness to participate in channel oversizing for its needs. A Joint Powers Agreement has been created. Upgrade of channel can be built in phases to accommodate growth and needs of PLSLWD, City's of Shakopee and Prior Lake and SMSC. Operatina Costs: PROJECT LOCATION $50,000 annually for 5 years, then $25,000 annually after channel is fully established. City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer Annual Erosion Control $300,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 125,000 125,000 Improvements Engineering/Admin. 25,000 25,000 Total 150,000 150,000 - .- - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 150,000 150,000 ./:>. Storm Drainage Fund-Trunk ....... Tax Le Total 150,000 150,000 - - - j Descriotion: Annual Erosion Control Project. ~ Justification: Areas may need to be fixed to meet NPDES requirements. Other Comments: The storm sewer outfalls along the river must be inspected prior to determining a project area. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer Drainage Control System $100,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW 45,000 Construction 40,000 Improvements En ineering/Admin. 15,000 Total 100 000 - - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) ~ Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base ./:>. Storm Drainage Fund-Trunk 100,000 OJ Tax Le Total 100,000 - - - - Descriotion: Construction of a drainage control system south of C.R. 78. The system will utilize a combination of an outlet control structure and a pipe outlet. Justification: Developing properties in the area will produce more storm water run-off requiring outlets to be constructed from existing wetlands. Ultimately, the outlets will reduce water running downstream to future developing properties It is recommended as part of the City's Comprehensive Storm Water Management Plan. Other Comments: Controlled outlets will better manage the storm water discharge rates and more fully utilize the upstream storage available in existing wetlands. Operating Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer Shenandoah Business Park $185,000 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 150,000 Improvements Engineerin /Admin. 35,000 Total - 185,000 - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base ./:>. Storm Drainage Fund-Trunk 185,000 c.o Tax Le Total - 185,000 - - - f Descriotion: Construction of a storm sewer outlet from the Shenandoah Business Park ~ (Industrial sites) to the Minnesota River through Murphy's Landing. Justification: , A storm sewer outlet may be needed to prevent further erosion from occurring now and to handle the increased volume from industrial development. Other Comments: Project is dependent on industrial development proceeding in this area. Coordination with Three Rivers Park District will be required. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer Harrison Street Pond $100,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW 5,000 Construction 80,000 Improvements Engineering/Admin. 15,000 Total - 100 000 - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 100,000 CJ1 Storm Drainage Fund-Trunk 0 Tax Le Total - 100,000 - - - Other Comments: A controlled outlet will better manage the storm water discharge rates and more fully utilize the upstream area available for ponding. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer Valley Park 6th Addition Outlet $300,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 250,000 Improvements Engineering/Admin. 50,000 Total - - - 300,000 - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 300,000 (J1 Storm Drainage Fund-Trunk -" Tax Lev Total - - - 300,000 - Descriotion: f Construction of an outlet for Outlot A of Valley Park 6th Addition ~ Justification: Developing properties in the area will produce more storm water run-off requiring an outlet to be constructed from the existing pond located in Outlot A to North Star Auto Auction pond. Other Comments: Feasibility study may change implementation schedule of this project. Ooeratina Costs: ..., PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer Northern Shakopee Outlet $125,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 100,000 Improvements Engineering/Admin. 25,000 Total - - - - 125,000 B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 125,000 01 Storm Drainage Fund-Trunk I\) Tax Le Total - - - - 125,000 Descriotion: I Storm Sewer and Ponding Improvements to meet future development needs in + the area west of County Road 83 and south of County Road 101. Justification: Upon full development of this area, an improved drainage system may be needed to prevent flood damage to existing properties. Other Comments: Hydraulic study done indicates to lower the current 100-year high water level, additional culverts are needed under railroad spur lines in the CertainTeed property. Need CertainTeed drainage agreement. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer O'Dowd - Thole Control Structure $250,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 200,000 Improvements En ineerin /Admin. 50,000 Total - - - - 250,000 B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base U1 Storm Drainage Fund-Trunk 250,000 w Tax Lev Total - - - - 250,000 f Descriotion: , A permanent control structure to regulate flows from Lake O'Dowd and Thole ~ Lake for better storm water management Justification: I Potential future development of area and increase flows to lakes may require permanent structure to establish runout elevation and rate of flow. Other Comments: Area would need to be annexed and this may happen beyond 2010. Condition with DNR and Scott County WMO is required. Ooeratina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer O'Dowd - Thole Overflow Channel $200,000.00 A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW Construction 150,000 Improvements Engineering/Admin. 50,000 Total - - - - 200,000 B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk 200,000 01 Tax Levy ./:>. Total - - - - 200,000 f Descriotion: ~ Improvements to D'DowdIThoIe overflow channel to handle Mure development areas. Justification: i Increase flows from development require improvements. Other Comments: Improvements can be coordinated with development along channel. Operatina Costs: PROJECT LOCATION City of shakopee Capital Improvement Program 2009-2013 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer Construction of Pollution Prevention $2,000,000 Devices A. Ex enditure Items: 2009 2010 2011 2012 2013 Land & ROW I Construction 1,700,000 Improvements Engineering/Admin. 300,000 Total - - - - 2 000 000 B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 2,000,000 01 Storm Drainage Fund-Trunk CJ1 Tax Le Total - - - - 2,000,000 Descriotion: j Construction of pollution prevention devices in the downtown to treat storm ~ water, prior to discharging into the Minnesota River. Justification: This may be mandated in the future. Other Comments: Ooeratina Costs: PROJECT LOCATION