Loading...
HomeMy WebLinkAbout5.D.3. CSAH 18 Bituminous Trail Extension s; f), 3, CITY OF SHAKOPEE CO~IS~f~T Memorandum '. 1.' j 'j J.' 's~ t'~ TO: Mayor & City Council Mark McNeill, City Administrator FROM: Jeff Weyandt, Assistant City Engineer SUBJECT: CSAH 18 Bituminous Trail DATE: June 17,2008 INTRODUCTION: Attached is an extension agreement from WSB & Associates, Inc. to provide engineering services for the extension of a bituminous trail along CSAH 18. BACKGROUND: WSB & Associates, Inc. is the consultant designing the CSAH 21 Project. Scott County will be constructing a trail on the west side ofCSAH 18, from CSAH 21 to Crossings Boulevard, as part of the CSAH 21 Project. The extension agreement authorizes WSB & Associates to design the trail extension, from Crossings Boulevard south to the existing trail on the west side of CSAH 18, and bid the project with the CSAH 21 Project. The project will be funded by the Capital Improvements Fund. ALTERNATIVES: 1. Authorize the appropriate City officials to execute an extension agreement with WSB & Associates, Inc. to provide engineering services for the CSAH 18 Trail Extension. 2. Do not authorize the appropriate City officials to execute an extension agreement to provide engineering services for the CSAH 18 Trail Extension. 3. Table for additional information. RECOMMENDATION: Authorize the appropriate City officials to execute an extension agreement with WSB & Associates, Inc. to provide engineering services for the CSAH 18 Trail Extension. ACTION REQUESTED: Authorize the appropriate City officials to execute an extension agreement with WSB & Associates, Inc. to provide engineering services for the CSAH 18 Trail Extension. 91#~ Jeff Weyandt, P.E. Assistant City Engineer JW/pmp ENGR/2008-PROJECTS/2008-COUNClLICSAH18-TRAIL-EXT.AGREEMENT A WSB - Infrastructure 0 Engineering II Planning II Construction 701 Xenia Avenue South & Associates, Inc. Suite 300 Minneapolis, MN 55416 May 30, 2008 Tel: 763-541-4800 Fax: 763-541-1700 Mr. Bruce Loney, PE Public Works Director/City Engineer City of Shakopee 129 Holmes Street S. Shakopee,~ 55379-1376 Re: Extension Agreement for Professional Services Provide Engineering Services CSAH 18 Trail Extension Shakopee, MN Dear Mr. Loney: According to our Agreement for Professional Services within the City of Shakopee and Section I-C-2 (Major Projects), this extension agreement is written to provide you with an estimate of cost for engineering surveying services for the above-referenced project. We propose to complete the preliminary and fmal construction document preparation described in the attached Scope of Services for field surveying and the preparation of preliminary layout and final design on a cost-not-to-exceed fee. It is proposed that all work under this portion of the project be considered complete after the construction plans are approved by the City. We propose to complete the CSAH 18 trail extension design and plan preparation for a cost not to exceed $6,900. The City of Shakopee agrees to reimburse WSB & Associates, Inc. for these services in accordance with Section N of the Agreement for Professional Services. If this agreement meets with your approval, please sign below and return one copy to our office. If you have any questions concerning the Scope of Services or fee as discussed herein, please feel free to contact me at 763-287-7189. We look forward to working with you and greatly appreciate the opportunity to assist you and your staff in the completion of this project. Sincerely, City Administrator City Clerk Donald W. Sterna, PE Vice President Mayor Enclosures Date ~. ~ sm Minneapolis II St Cloud Eq u a lOp po rtu nity Em p I oye P,\LEITER PROPOSAW1>1,.k.pceIFuller SlrcetILTR PROP EXT AGMT bl.ue)"a528a8.d.c SCOPE OF SERVICES Fuller Street (Old CR 77) Trail Extension Preliminary Engineering Services Task 1 - Proiect Mana!!ement This task includes planning and coordination of all work tasks, establishment and monitoring of budgets, meetings, and correspondence with the City Shakopee, Scott County, and if necessary, the Watershed District on a periodic basis. The project manager will provide technical direction on all aspects of the project review and work products. The project manager will serve a primary role in the design considerations. Donald Sterna is proposed to manage the project for WSB & Associates, Inc. (WSB). Task 2 - Field Survevin!! This task includes surveying the existing westerly side of CSAH 18 from Crossing Boulevard southerly to the existing trail system approximately 1,400 feet. WSB will utilize the Scott County coordinating system for basis of survey control on this project. Task 3 - Base Mappin!! This task will include processing the field survey and develop a base map and topographic drawing of the site to be used for the development of the trail layout and plans for the City. WSB will incorporate the base mapping into Scott County's CSAH 21 Improvement Project. Task 4 - Trail Desi!!n and Plan Preparation . Preliminary Lavout WSB will work with the City engineering staff to locate the proposed trail connection along CSAH 18 and develop cross sections and an estimated cost for City review and approval. . Construction Plans The plans and specifications will be developed meeting Federal and State Aid standards. WSB will coordinate the work closely with Scott County since the trail will be constructed with the CSAH 21 improvements. The current schedule for construction work on CSAH 18 is for the fall of2011. The design plans will be incorporated into the CSAH 21 plans which will be reviewed by Scott County and :Mn/DOT. The final construction plans will include the following: Quantity tabulations - Typical sections Alignment plans and tabulations - Removals COilstruction plans and profiles Turf establishment / erosion control plans Cross sections . Specifications No additional specification services will be required since the proposed trail will be included in the CSAH 21 improvement project. a Permits The CSAH 18 trail extension will be part of the CSAH 21 project's permitting, and no additional work is anticipated. . Soil Borin!! No soil borings are anticipated. If soil borings are required, this work will be considered additional services. Scope of Services P:\LETTER PROPOSALS\SIUlkopeelFlltler Slreet\LTR PROP EX/' AGMT bloUI!f-OS280B.doc . Estimated Cost WSB CSAH 18 Trail Extension &~l1Ic. CITY of SHAKOPEE, MINNESOTA Date 5/28/2008 Estimated Hours DETAIL DESIGN Project Design Survey Project Engineer / Engineer / CADD Crew Total Manager Supervisor Tech Tech V 3-Person Clerical Hours Cost Task No. Descriptioll 1 PROJECT MANAGEMENT -- ...~-_.~~-_. -'---6 -- 1---- 1----- 1--. A. Management 2 I 9 $ 1,108.00 B. Meeting 2 --- 2 $ -~ 2 FIELD SURVEYS 2 6 8 $ 1,194.00 3 BASE MAPPING 2 1 3 $ 278.00 TRAIL DESIGN and PLAN PREPARATION -- 4 f----- A. Preliminary layout I 1 4 6 $ 639.00 B. Design and Plan Preparation I 6 12 19 $ 2.012.00 C. Cross Section Plans - -~-- 8 2 -- f----- 10 $ 1.010.00 D. Quantity Tabulation 2 2 4 $ 434.00 Total Hours 10 13 30 1 6 1 61 $ 6,943.00 Ollrly Costs Labor Costs CSAH 18 Trail Extension.xls Rev. 4-08.99 5/30f2008