The Council is asked to receive the results of the City Hall Feasibility Study and
provide direction for any further action or next steps, if desired.
Background
In July of last year the City Council authorized the hiring of architectural firm BKV
Group to conduct a City Hall feasibility study. The study was to look at the City's
space needs now and into the future and estimate the costs of remodeling or adding
on to the existing City Hall building versus constructing a new City Hall building
attached to the Police Station.
An executive summary of the study report is attached. Representatives of BKV
Group will be in attendance at the Council meeting to present the results and answer
any questions Council might have.
Relationship to Vision
This item relates to Goal B: Positively manage the challenges and opportunities
presented by growth, development and change.
Requested Action
The Council is asked to receive the results of the City Hall Feasibility Study and
provide direction for any further action or next steps, if desired.
Attachments: City Hall Feasibility Study Summary Report
Planning Objectives:
• Single public access point
• Improved security and sight lines to the main entry.
• Accessible restrooms on the first floor.
• Council Chamber is designed to be a flexible and functional space without obstructions
• Appropriate space utilization
• Development related City services are all located at City Hall creating a single location providing
a"one-stop shop"customer service experience and increased staff efficiency.
• Review spatial requirements to accommodate the long-term needs of the City
• Staffing/Operational Efficiency
City Hall Plan Options
Option A
• Remodel existing City Hall building without adding on to the existing building
Option B
• Remodel existing City Hall building with addition to second level
• Consolidate to a single public entrance on Holmes Street
Option C
• Build a new City Hall building adjacent to the Police Station
Option D
• Build a new City Hall building at the existing City Hall site
. __
404,040
z
T.
ry
WI
._,
x
City of a'ko p e e, MN B K V
G R O U P
City Hall Plan Optionsliliyy,
04102/2015 Project#: 1087.07 St I AKOPE E I
+ TAR 1 City Hall - Option A
s o
3 I
1 Pros:
1 • Improves security;eliminates issue of public
1 being able to access the basement level
1 undetected from the street entry.
1 • Provides main floor public restrooms.
•
i • Lower level incorporates locker rooms,IT
iINANCE '
•
•
,uwsF-s o N training room and larger break room.
1(PROGRAM'.3051 SF)
I
1 Cons:
I Ev i
� • IT workspace is located in lower level;space
1
I STAIR•A lacks access to daylight
M
J • Finance is split into two areas with a portion
'
on level one and level two.
• Engineering Department is not located
within City Hall building creating staff
Plan-Level 2 ®s inefficiencies and possible negative customer
service perspective
• Public entry is at public parking lot,no public
access will be available from Holmes Street.
• Location lacks integration with Public
NEW>VNOLMI f STAffENTRE Works and Police Department creating staff
STAR re inefficiencies.
NENNANMGPS \ • Remodel requires phased construction.
ST RC'
T • Limited parking available and lack of
au dedicated City Hall parking.
NOR I PIANYIIG.
IBUILDING IN3PEGTpNS
I I (PROGRAM 3980 SP) O D3RMM3010 SP)
COUNCIL Estimated Cost:
I
- CHAMBERS
(PROGRAM 3300 SF1
I Construction Cost
Estimated Construction Cost $3,000,000
FINANCE Estimated Asbestos Abatement $80,000
(PROGRAM'.700 SF) - _-- -- -
SERVICE COUNTER CONTROL RN Site Work $100,000
I MEETING R;
PUBLIC aRr • ar 4.••: •- i•• ••:,•-• '..k,III(
STAIR./ LOBBY
L /00 Total Estimated Construction Cost $3,780,000
Soft Cost
Moving Cost $50,000
Temporary Leased Space(10 months) $200,000
Plan-Level I ®s A/E Fees.FF&E.Reviews.Printing.Etc. $800.000
Total Estimated Project Cost $4,830,000
BOILER RM. 4 Si IR C'
E
OFFICES
PNNACV RD
E
ARCHIVE
MECHAMCAL
STORAGE
• qM. • • • • Ii iRM19lG
UNE%LAVATEO MEN'S T PM.
• LOCKER L
NtaI�MS ,:
RESeaaou' ...._......_._...
•
s 1 STOLG
MIENS` 3ESTR00
OCNE0. f) BREAK PM.
EOUIP. 1
EL"', ELEV. I
OBEY FAOIEIRES
ELFLTpNS c•Lra L ELEC.
.� STORAGE SPACE
ORAL£
' STAR (MOGRPH:w15P) r STAR'9'
Plan-Basement ®s
1
City of Shakopee, MN 1 B K V
G R O U P
City Hall Plan Options
09IO2/20I5 Project#: 1087.07 1 St 2
1 City Hall - Option B
STAR D'
�
i I
S F -t_. Pros:
•sruR+:
Improves security; eliminates issue of
LOBBY warm RAI public being able to access the basement
SERVICE COUNTER Li level undetected from the street entry.
• Provides main floor public restrooms.
ADMINISTRATION FINANCE
1 1 • Lower level incorporates locker rooms,IT
MO∎PROGRAM'. B SFI (FROGRA%M SF) '1 training room and larger break room.
RODE AREA
--.. ,,j • All departments are allocated space to
meet their future program needs.
• Meeting rooms are provided on the first
�/\' �� r and second floor
VII IMSEyFE%^..I IT
TOL. TOILET sat (PROGRAM RR SF)
Cons:
_.STAIR..._..
I • An addition is required on the second
floor to meet programmed space needs.
The roof will need to be removed in this
area of the building to accommodate
Plan- Level 2 ®r structural modifications for the addition.
• Building will need to be vacated for
construction. Alternate workspace would
r PUBLIC ENTRY need to be identified for the City Hall
NENNN�M staff during construction.
S AR.G N.' • Location lacks integration with Public
ESNBULE
NENYARD..�� NEVI .... Works and Police Department creating
Y UP
STAIR.-CN
MEETING �_�-� - staff inefficiencies.
IR • Limited parking available and lack of
IIII dedicated City Hall parking on site.
REST.RM SERVICE COUNTER COUNCIL
"""-- CHAMBERS
STAFF IPROGRAN.]XOSF)
TOILET, RES.RM • I
I DEPT,OF
OEN£LOPYF
INFRASTRUCTURE Estimate Cost:
(PROGRAM'5143 SF) CONTRA RN „ RK OOLN
Construction Cost
. . Estimated Construction Cost $4,900,000
Elfl STAFF Estimated Asbestos Abatement $80,000
TOILET
L NG RM SECURE i Site Work $1 20,000
' LOBBY STNR 9 I STAIR '• Construction&Design Contingency $700.000
Total Estimated Construction Cost $5,800,000
`-STAFF
Soft Cost
Moving Cost $50,000
Plan -Level I ®S Temporary Leased Space(I 0 months) $200,000
A/E Fees.FF&E.Reviews.Printing.Etc. 5900.000
Total Estimated Project Cost $6,950,000
NEW -
E BOILERRM. e gm,1 A f
hil
E.....
STORAGE STORAGE
•MECHANICAL • • • nTRU✓RSIi
Ru. LENS M.
UNEKCAVATE 5 LOCKER
STROOE
RESTPGOM�
• LVOUENS ^uENS STORAGE
LOCKER IESRiCO� •
BREAK ROOM
ETU
0
EL BY FMJ TLc.,
—{
STORAGE LOBBY ELEC.
STORAGE
T STORAGE SPACE ' I
j IPROGRAM:KASE) f
-
STAIR'A' STARS
Plan -Basement ®s
a
City of Shakopee, MN i
1 BRKV
City Hall Plan Options
04/02/2015 Project 4: 1087.07 3
St IAKOI EE
City Hall - Option C
RELOCATED ACCESS ROAD
Pros:
`'".' • Locates all city functions on a single site/
y. campus(City Hall,Police,Public Works)
X.t�' y « « « 3 creating a'one-stop shop"for all city
4 t / services.
Proposed % • Integrating all services at one location
- 11114'�•r benefits customer service and staff
Ex mng Leel.l-Lvels)
,.. P X4 t PoX�s�aTTOn y'� h.1. efficiency.
• New construction will allow for building
t a' to be designed for optimum function and•
efficiency.
d\ s` • Proposed site allows for future expansion
o e�
opportunities.
�_ t � E �
:?•
�'% • Current City Hall building can remain fully
— __,`. :
.-.3 functional until new facility is complete,
. - eliminating the need for temporary staff
space.
Conceptual Site Plan Cons:
• Lack of city presence in downtown core.
• Undetermined use for vacated City Hall
building in downtown.
Estimated Cost:
Construction Cost:
Estimated Construction Cost $5,600,000
Site Work $300,000
Construction&Design Contingency $500.000
Total Estimated Construction Cost $6,400,000
Soft Cost:
NE Fees.FF&E.Reviews.Printing.Etc. $900.000
Total Estimated Project Cost $7,300,000
City of Shakopee, MN I B K
G R O U P
City Hall Plan Options
i Plata
04102/2015 Project#: 1087.07 I Si I 4
City Hall - Option D
- Q Pros:
Continues City Hall presence in
.0 downtown core.
• Utilizes City Hall site
l • All departments are allocated space to
N N S. N
'� meet their future growth program needs.
! � • Locates Engineering back with Planning
, 4 and Building Inspections,improving on the
/� _ "one-stop shop"concept
.........A - t • New construction will allow for building
11 t to be designed for optimum function and
-.-- :nq 4 efficiency.
1 '' Cons:
•x; .-,cam Building will need to be vacated for
demolition and construction.Alternate• : ‘ workspace would be need to be
p Proposed , .a" '
' cry se ;;'� identified for the City Hall staff during
(11,400 sf per Level. ti .'. : construction.
+ / r ..Q 2-Levels) sa,``
,t t, %.:- ..., Due to the site size,lack of City Hall
✓ . — parking wilt remain an Issue.
`•` rr:a • Existing site does not provide for future
expansion.
" ,; Estimated Cost:
,_ r€ -- °{� Construction Cost:
`. Estimated Construction Cost $6,000,000
ti Building Demolition $150,000
Site Work $250,000
Conceptual Site Plan conatrurtion&Design Contingency $600.000
Total Estimated Construction Cost $7,000,000
Soft Cost
Moving Cost $50,000
Temporary Leased Space(10 months) $230,000
NE Fees.FF&E.Reviews.Printing.Etc. $950.000
Total Estimated Project Cost $8,230,000
City of Shakopee, MN B KV
G R O U P
City Hall Plan Options
04/02/2015 Project#: 1087.07 .5
Si IAKOPEE