HomeMy WebLinkAbout4.C.3. Approval of County 17-32 Cooperative Agreement Consent Business 4. C. 3.
SHAKOP EE
TO: Mayor and City Council
FROM: Bruce Loney, Public Works Director
DATE: 04/07/2015
SUBJECT: Approval of County 17-32 Cooperative Agreement (D)
Action Sought
Authorize the appropriate city officials to execute the Scott County Construction
Cooperative Agreement for the CH 17-32 Project.
Background
The County has completed plans for the CH 17-32 project which is for the
reconstruction of CH 17 to a four lane highway approximately 800 feet south of CH
78 to approximately CR 42.
The attached agreement contains the City's cost share for CH 17 improvements.
The cost participation is for bituminous trail, curb and gutter, engineering and storm
sewer and local road costs. The County is using Federal funds to reduce the city's
share. Funding of this project will be from Surface Drainage funds and Capital
Improvement fund.
If Jennifer Lane is extended as mentioned in previous council meetings, a separate
agreement will be done for the cost participation.
Recommendation
Staff recommends the execution of this agreement.
Budget Impact
This project affects the Surface Drainage fund and Capital Improvement fund in
which sufficient funds were budgeted.
Relationship to Vision
This supports Goals D & E: Maintain, improve and create strong partnerships with
other public and private sector entities; and Deliver effective and efficient public
services by a staff of well-trained, caring and professional employees.
Requested Action
Authorize the appropriate city officials to execute the Scott County Construction
Cooperative Agreement for the CH 17-32 Project.
Attachments: Construction Cooperative Agreement CP 17-32
County Project No. CP 17-32/SP 70-617-024
City of Shakopee
County of Scott
CONSTRUCTION COOPERATIVE AGREEMENT
THIS AGREEMENT, by and between the County of Scott, a body politic and corporate under the laws
of the State of Minnesota, hereinafter referred to as the "County" and the City of Shakopee, a body politic and
corporate under the laws of the State of Minnesota, hereinafter referred to as the "City".
RECITALS:
A. The County and the City seek to reconstruct segments of County Highway (CH) 17, from approximately
800 feet south of CH 78 to approximately CR 42, as shown on the County Engineer's plans for County
Project No. CP 17-32/SP 70-617-24, which improvement contemplates and includes operational,
capacity and safety improvements for safety of the traveling public, (hereinafter referred to as the
Project)
B. The above described Project lies within the corporate limits of the City of Shakopee.
C. The County Engineer has prepared an engineer's estimate of quantities and unit prices of material and
labor for the above described Project and an estimate of the total cost for contract work in the sum of
Four Million,4 Hundred and Forty Thousand, One Hundred and Thirty Two Dollars ($4,440,132.00). A
copy of said estimate(marked Exhibit"C") is attached hereto and made a part hereof.
D. It is contemplated that all of the above improvement work shall be carried out by the parties under the
provisions of Minn .Stat. Sec. 162.17, subd. 1.
NOW, THEREFORE, IT IS HEREBY AGREED:
1. The County or its agents shall advertise for bids for the work and construction of the aforesaid Project
No. CP 17-32/SP 070-617-24 receive and open bids pursuant to said advertisement and enter into a
contract with the successful bidder at the unit prices specified in the bid of such bidder, according to law
1
County Project No.CP 17-32/SP 70-617-024
City of Shakopee
County of Scott
in such case provided for counties. The contract shall be in form and includes the plans and
specifications prepared by the County or its agents, which said plans and specifications are by this
reference made a part hereof.
2. The County shall have overall authority to administer the contract and inspect the construction of the
contract work for the Project. The County shall have ultimate authority in initiating and determining
change orders, supplemental agreements and final quantities. The City Engineer shall cooperate with
the County Engineer and his staff at their request to the extent necessary, but shall have no other
responsibility for the supervision of the work.
3. The City shall reimburse the County for its share in the construction cost of the contract work for said
Project and the total final contract construction cost shall be apportioned as set forth in the Division of
Estimated Cost Summary in said Exhibit "C". The City shall, based on the contract price, deposit with
the Scott County Treasurer ninety five percent (95%) of the estimated City's share of the construction
and engineering costs, engineering costs are based on the following: 10% Design, 8% Construction
Engineering/Administration and 3% Administration payment on the remainder of the City Share of the
Project.
This Payment should be made within thirty(30) days after award of contract. It is further agreed that the
Engineer's Estimate referred to in this Agreement is an estimate of the construction cost for the contract
work on said Project and that the unit prices set forth in the contract with the successful bidder and the
final quantities as measured by the County Engineer shall govern in computing the total final contract
construction cost for apportioning the cost of said Project according to the provisions of this paragraph.
See Exhibit"C".
4. The cost of the items in which the City shall participate shall be based on the unit prices in the contract
and the final construction quantities as determined by the Project Engineer in charge.
5. The City shall, upon completion of the Project and based on the final contract amount, make payment to
the Scott County Treasurer for the City's remaining share of construction costs of the project, upon
submittal to the City, the County's final itemized statement of the Project costs, on or before December
2
County Project No. CP 17-32/SP 70-617-024
City of Shakopee
County of Scott
31, 2016 or until all obligations set forth in this agreement have been satisfactorily fulfilled whichever
occurs later,whichever occurs first.
6. In the event that a dispute arises, the County and the City agree that all disputes between them arising
out of or relating to this Agreement shall be submitted, upon agreement of both parties, to mediation,
with the cost being shared equally. Since each party recognizes each other as a political subdivision of
the State of Minnesota, each party shall maintain general liability and automobile liability coverage
protecting itself, its officers, agents, employees and duly authorized volunteers against any usual and
customary public liability claims to the limits prescribed under Minn. Stat. Sec. 466.04 and Workers'
Compensation and shall be in accordance with the Minnesota statutory requirements. Said policies shall
be kept in effect during the entire term of this Agreement.
7. All records kept by the City and the County with respect to the Projects shall be subject to examination
by the representatives of each party. All data collected, created, received, maintained or disseminated
for any purpose by the activities of the County or City pursuant to this Agreement shall be governed by
Minnesota Statutes Chapter 13, as amended, and the Minnesota Rules implementing such Act now in
force or hereafter adopted.
8. The City shall provide and/or perpetuate an adequate electrical power supply to the integral street lights
and upon completion of said new and revised integral street lights installations shall provide and/or
continue to provide necessary electrical power for its operations at the sole cost and expense of the City.
9. The City agrees that any city license required to perform electrical work within the city shall be issued to
the Contractor or the County at no cost to the Contractor or the County. Electrical inspection fees shall
be not more than those established by the State Board of Electricity in the most recently recorded
Electrical Inspection Fee Schedule.
10. The City agrees, at its cost, to convey and grant to the County all right of way needed for the Project on
all City owned property, including a property described as Park, lying South and East of Lots 1, 2, 3, 4
& 7,Block 2, Timber Trail's, Scott County, Minnesota. Upon a request by the City,the County agrees
to engage a tree-transplanting contractor, at its cost, to transplant those existing conifer trees on the
3
County Project No. CP 17-32/SP 70-617-024
City of Shakopee
County of Scott
above-described property, which are within the limits of the proposed new right of way by easement for
highway purposes. The transplanting of any conifer tree(s) is subject to an evaluation by a truck-spade
contractor of each tree's species, size, condition and location both at its existing site and its transplant
site and a determination by the tree-transplanting contractor that such tree may be transplanted by a
truck-mounted truck spade. The City will designate the proposed transplant sites elsewhere on the
above-described property subject to site approval by the truck-spade contractor. In the event of
transplanting any of the conifer tree(s), the County agrees to arrange, at its cost, for the tree-
transplanting contractor to water such tree(s) for the balance of the growing season, as needed as
determined by the tree-transplanting contractor. The City agrees to remove a city sign on the property
prior to the Project and reinstall the city sign after the Project with the understanding that all costs for
sign removal and reinstallation shall be paid by the County.
11. The City shall maintain the trail improvement at its cost for the life of the improvement. Maintenance of
the trail shall include but not be limited to debris removal, sweeping, seal coat, crack filling, mowing,
fence repair, and other routine maintenance. The County shall not participate in snow and ice removal
on the trail.
12. Upon completion of the work, the City shall maintain the integral streetlights including the luminaire
and all its components at the sole cost and expense of the City, except for the County maintaining
electrical energy to the luminaire head at the sole cost and expense of the County.
13. Initial pavement striping and markings shall be included as part of the Project. The County shall be
responsible for all subsequent pavement striping and markings on its county roads as required after the
initial work and shall be responsible for one hundred percent (100%) of the subsequent related costs.
The City shall be responsible for all subsequent striping and markings on its city roads, including
pedestrian markings across its roadways, as required after the initial work and shall be responsible for
one hundred percent(100%) of the subsequent related costs.
14. The City shall, at its own expense, remove and replace all City owned signs that are within the
construction limits of the Project.
4
County Project No. CP 17-32/SP 70-617-024
City of Shakopee
County of Scott
15. Neither the County, its officers, agents or employees, either in their individual or official capacity, shall
be responsible or liable in any manner to the City for any claim, demand, action or cause of action of
any kind or character arising out of, allegedly arising out of or by reason of the performance, negligent
performance or nonperformance of the described maintenance, restoration, repair or replacement work
by the City, or arising out of the negligence of any contractor under any contract let by the City for the
performance of said work; and the City agrees to defend, save and keep said County, its officers, agents
and employees harmless from all claims, demands, actions or causes of action arising out of negligent
performance by the City, its officers,agents or employees.
16. It is further agreed that neither the City, its officers, agents or employees, either in their individual or
official capacity, shall be responsible or liable in any manner to the County for any claim, demand,
action or cause of action of any kind or character arising out of, allegedly arising out of or by reason of
the performance, negligent performance or nonperformance of the described maintenance, restoration,
repair or replacement work by the County, or arising out of the negligence of any contractor under any
contract let by the County for the performance of said work; and the County agrees to defend, save and
keep said City, its officers, agents and employees harmless from all claims, demands, actions or causes
of action arising out of negligent performance by the County, its officers, agents or employees.
17. It is further agreed that each party to this Agreement shall not be responsible or liable to the other or to
any other person or entity for any claims, damages, actions, or causes of actions of any kind or character
arising out of, allegedly arising out of or by reason of the performance, negligent performance or
nonperformance of any work or part hereof by the other as provided herein; and each party further
agrees to defend at its sole cost and expense any action or proceeding commenced for the purpose of
asserting any claim of whatsoever character arising in connection with or by virtue of performance of its
own work as provided herein.
18. It is further agreed that any and all employees of the City and all other persons engaged by the City in
the performance of any work or services required or provided herein to be performed by the City shall
not be considered employees, agents or independent contractors of the County, and that any and all
claims that may or might arise under the Worker's Compensation Act or the Unemployment
5
County Project No.CP 17-32/SP 70-617-024
City of Shakopee
County of Scott
Compensation Act of the State of Minnesota on behalf of said City employees while so engaged and any
and all claims made by any third parties as a consequence of any act or omission on the part of said City
employees while so engaged shall be the sole responsibility of the City and shall not be the obligation or
responsibility of the County.
19. Any and all employees of the County and all other persons engaged by the County in the performance of
any work or services required or provided for herein to be performed by the County shall not be
considered employees, agents or independent contractors of the City, and that any and all claims that
may or might arise under the Worker's Compensation Act or the Unemployment Compensation Act of
the State of Minnesota on behalf of said County employees while so engaged and any and all claims
made by any third parties as a consequence of any act or omission on the part of said County employees
while so engaged shall be the sole responsibility of the County and shall not be the obligation or
responsibility of the City. The provisions of Minn. Stat. Sec. 181.59 and of any applicable local
ordinance relating to Civil Rights and discrimination and the affirmative action policy statement of Scott
County shall be considered a part of this Agreement as though fully set forth herein. See Exhibit"A".
20. Pursuant to Minn. Stat. Sec. 16C.05, subd. 5, the books, records, documents, and accounting procedures
and practices of the County and City pursuant to this Agreement shall be subject to examination by the
County, City and the State Auditor. Complete and accurate records of the work performed pursuant to
this Agreement shall be kept by the County and City for a minimum of six (6) years following
termination of this Agreement for such auditing purposes. The retention period shall be automatically
extended during the course of any administrative or judicial action involving the County or the City
regarding matters to which the records are relevant. The retention period shall be automatically extended
until the administrative or judicial action is finally completed or until the authorized agent of the County
or City notifies each party in writing that the records no longer need to be kept.
21. The laws of the State of Minnesota shall govern all questions and interpretations concerning the validity
and construction of this Agreement and the legal relations between the parties and performance under it.
The appropriate venue and jurisdiction for any litigation hereunder will be those courts located with the
6
County Project No.CP 17-32/SP 70-617-024
City of Shakopee
County of Scott
County of Scott, State of Minnesota. Litigation, however, in the federal courts involving the parties
shall be in the appropriate federal court within the State of Minnesota.
22. In the event any provision of this Agreement shall be held invalid and unenforceable, the remaining
provisions shall be valid and binding upon the parties unless such invalidity or non enforceability would
cause the Agreement to fail its purpose. One or more waivers by either party of any provision, term,
condition or covenant shall not be construed by the other party as a waiver of a subsequent breach of the
same by the other party.
23. The County's Authorized Agent for the purpose of the administration of this Agreement is Maria A.
Heller, Supervisor Admin Services, or her successor. Her current address and phone number is Scott
County Highway Department, 600 Country Trail East,Jordan,MN 55352,(952)496-8369.
24. The City's Authorized Agent for the purpose of the administration of this Agreement is Bruce Loney,
Public Works Director, or his successor. His current address and phone number is 500 Gorman St,
Shakopee, MN 55379, (952) 233-9361. Any change in name, address, or telephone shall be noticed to
the other party.
7
IN TESTIMONY WHEREOF,the parties hereto have caused this Agreement to be executed
by their respective duly authorized officers as of the day and year first above written.
CITY OF SHAKOPEE
(SEAL)
By And
Brad Tabke, Mayor Kris Wilson,Acting City Administrator
Date Date
COUNTY OF SCOTT
ATTEST:
By By
Gary Shelton, County Administrator Jon Ulrich, Chair of Its County Board
Date Date
Upon proper execution, this Agreement RECOMMEND FOR APPROVAL:
will be legally valid and binding.
By By
Ron Hocevar, County Attorney Anthony J.Winiecki,Acting County Engineer
Date Date
APPROVED AS TO EXECUTION:
By
Ron Hocevar, County Attorney
Date
http://teamscoop/div/CommunitySvcs/contracts/PDProjectContracts/CP 17-32_Construction Coop_Shakopee JS.docx
EXHIBIT A
POLICY STATEMENT
It is the policy of Scott County Government to provide Equal Opportunity to all employees and
applicants for employment in accordance with all applicable Equal Employment Opportunity
laws, directives, and regulations of Federal, State, and local governing bodies or agencies
thereof, including Minnesota Statutes, Chapter 363.
Scott County will not engage in any employment practices which discriminate against or
harass any employee or applicant for employment because of race, color, creed, religion,
national origin, sex, disability, age,martial status, sexual orientation, or status with regard to
public assistance. Such employment practices include, but are not limited to, the following:
hiring, upgrading, demotion, transfer, recruitment or recruitment advertising, selection, layoff,
disciplinary action, termination, rates of pay or other forms of compensation, and selection for
training, including apprenticeship.
Further, Scott County fully supports incorporation of nondiscrimination rules and regulations
into contracts and will commit the necessary time and resources to achieve the goals of Equal
Employment Opportunity.
Any employee of the County who does not comply with the Equal Employment Opportunity
Policies and Procedures set forth in this Statement and Plan will be subject to disciplinary
action. Any subcontractor of the County not complying with all applicable Equal Employment
Opportunity laws, directives, and regulations of Federal, State, and local governing bodies or
agencies thereof, including Minnesota Statutes, Chapter 363, will be subject to appropriate
contractual sanctions.
Scott County has designated the Employee Relations Director as the manager of the Equal
Opportunity Program. These responsibilities will include monitoring all Equal Employment
Opportunity activities and reporting the effectiveness of this program, as required by Federal,
State, and local agencies. The Scott County Administrator will receive and review reports on
the progress of the program. If any employee or applicant for employment believes he or she
has been discriminated against, please contact the Scott County Employee Relations Director,
Scott County Employee Relations, Government Center Room 201, 200 Fourth Avenue West,
Shakopee, Minnesota 55379-1220,or call (952)496-8103.
/-a-/3 ,�- /. S /3
6:11.(Ve/fIton Date Thomas J.Wolf Date
Scott County Administrator Chair, Board of Commissioners
EXHIBIT B Location Map
1 .t t fi t j r,LS,t L I, " t e = r''i.1 rke+�
1 At i.' , 1' s ti , - f , , .4 ,Tit : ,
f :,, .Re Ali ,. ..... �v ` ,,: f[! , k ' yM1\ .zi
u� .. Gw1ii ' +
�
t
ti yK _.
.e ' CH17 :
s. 'tease I k` .t t•
t rr v
i
.� r � !9 11 s . % g '. . - * e .
ti h •,
.s. r .. d _
f 41 'rcyTAr ' ...
1 M
w wF I d
t x
M' Expand to 4-lanes 17-32 PROJECT LIMITS
, , Phase it ,, W
CH 42
isc.i. , Expand to 4-Lanes
•
CH 17/CH 42
Interchange +
•
(2011) A- _,
EXHIBIT C Division of Cost Summary
.•
•
PARTICIPATING NOR-PARTICIPATING
TOTAL SCOTT SHAKOPEE
SP 137081,024
COUNT' PUBLIC
CSAII 17 MN 17 1.00 171.11.1. 2..217201921122 UTILITIES
seec. uNrr 12270 Earl, NC.. .01911604. ROAM. 2000.
tao. rt. war PRICE 081628 mourn Eery csro 12039 8530 2809 ESTO 23091 2309 0030 GSM OHO erre
Quurr. AMOUNT 017A147. AMOUNT WANT. MOUNT C.A012. .02112 (NM, AMOUNT 00.111. MOUNT
....., .275.0.20.6. 11.111.1 ..0 00 1 55.00 55.000.00
5071.501 10020.9-1014 LOW SIM 170.500 93 II. 170 50500 0 78 132,260.00 0.06 13.610110 0.93 111500 504 6.62000 0.07 11595 CO
21171 501 21.9 OFFICE1096. .CH 185..00 1.00 10600.00 0.73 12..00 0.06 1 32000 0.00 496 00 O. 66000 OW 1065.00
2.6. C.ARING CH- AC. 50.00 114 6.820.03 0. 5.790.02 078 1 47100
2101.502 C12451142 TREE 220 00 130 .520.00 130 20.800.50 1 22000 5 1.100.
2.7.. .1.1.5104. ' f: 'fl'017"1-'3'3 0.20 00 O. 5590.00 O. 1.43000
H.507 ...NG 14.270 00 130 14300.00 1 110 00 550 00
2.2.502 2.51229192.70.22110261. '-'.'-' 1 10 2. 2.729. 2.527 2.71870
2.1001 .979.251.10.1 A 2„... ,..0.2 450000 1 5...
2101.1 BUILOINO REMOVAL 0 LW.. 4.00 4070 00 1
''.".-' .11-.1'1'4"..VA'' 1.1.11.51114 8050. 0 MOO 100 5 1150-00 ..
2103.501 014170120 25/00234 5 161102 SUN 6,000.97 5.000 100 6.060.97
2101291 29.0000N 21.0.A 31.1149 SIM 3.850 00 1050 00 1.00 3360.00
22... .2.200.0 96.9.2 LIMP SW 0.200. 0.300.00 100 2,2.20
2103..1 FO.00002 11.00., 2.... 62.. 260000 149 7...00
-2...1 209.6909 RENO.19 7922 610.1 7.1.00 2.160. 1.00 7.130,20
2101501 FOUND..REMOVAL 2 31.11229. 61.00 215000 700 ,...
2..501,11.91.642.9.29 L...1"" 6.50 500 1.9.30 363 3005.50
2104.5. REMO..50 MAIN I.21- 55.00 10 560 03 10 650.
2..501-1.1201.32,.0.1.1.2 151. 6.00 28 .. 38 30180
2..1 REMO.CURB AND 01717E9 213 FT 3. . 2.710. 824 5710.20
'1.-5°E .E--..7...1.-.111E11'..H .91 610 2790 7.105.00 2 S. 0.105.00
2..503 ADAC.0.1114006...NT 30017 2. 1. 3.3.. 7258 '.3'-'-. -
2104.. 1.10.PPE 4... EH.. '1'1. 59127 5 65000 .
;',:in 61'.322°4'L'"T„.22.622. EACH 605 00 7 4 445.00 7. 4..00 .
c 009.20.9 0605.46.0.950570 7 31. 3.00 2.060 57.. 250 2„. 00 1.03 20 M.
2104.. 2.2.2.111.3 EACH 27.50 220.00 5590 6 /65.00
21..5. 2.1.2212..7C.C.22.... EACH 103 00 4 540 00 4 540.00 - -
'104.. 2202.5 L1GHTHG MI EACH .599 7 2,592.00 7 50.00
2104523 3.2.5 3. .CH 27 50 20 50000 10 17500
2..529 SAL..9.197E C EACH 2730 70 90750, 12. ..00 g lt,
21.523 .970.05 S..%0 E.H 55 00 16001 3 15500 -
.04.001 REY.1712319.1704201.16 sraucru.s 1.11.9. 7,060 00 2 0.050 1 0.0.00
2100.501 C01313014 52CAVATION
1:1' g1JU 0'1'g 6 00 01557 402.068.50 377. 377597. 15. 652160 .71- 2.611.
2105.521 ORANULAP BORROW NN 14.33 25..0 380,902.50 -25.0. 072.59.00 566 5.2.60
2118.501 .9E00TE SURFACING CLASS 2 T. 20 02 1.110 237.90
2123.610 .9E7..PER(W.PICINP ORO. HOUR 143 00 210 ..855.00 1., 25.16600 54 3... Id zus.00
- -
2211.503 60.506TE 5565 43.41 102.3 0 101 .. 24.5C 21211 531.01030 20555 503507.50 207 507150 049 20.0.30
2215.501 FULL DEPTH PECLAMATH11 99. 2. 3.811 11.632.00
2221.501,SHOULD.2095 AGGREGATE 03.3 2 6. 275C 314 8.835. 31.00 157 4.59250 1113 3.100.00
- -.
2201.501 102113.14237.SURFACER. .. 550 0.2.21 275.. 05001 ''..”1.° 10 71.50 0 1100
.0501 HI.2.05 wE.N000.63 1.1.120610.. ToN .00 1.104 87.01000 190 15.3.00 0.5) 42 030.00 3. .108.
2050 501 911.94 12 6 W..COLI..70901.1. T. 22 22 . 45020 70 .
3380.. 1-011E 92 19.6.04.1.00O2219.1.7.1051 9. 71. 0. 4005.07 MO 408..00 -
.90502 .195.12 5 NON W5.240 COURSE/004.9E 43.C1 TON 81.25 1.. 71.7..50 180 12,566.76 5. 36200. 378 23.53
.60502 1.60 10.0 499N W.909C001252 3104217.OA/ T. 66 00 4.805 027.07950 5093 02507000
.060.62 ....0097. 5.H 013 00 - 1 WOO
23111515 Ir...APR. 5.11 122.30 101200 5 1.012.00
2601 615 20 GS PPE APRON E.H 107.00 374. 2 074 00
.6515 13.01.ALHOM EACH 56300 1.17100 2 26..
.01.515 13 RC 0.622014 E.11 854.. 2018.00 2 tpoaco 2 1 30000
2501.515 23.01955.2074 E.H 702.00 70200 76500
2507.2 3.4.1.2E FOP 113.APP. EA.- 55500 100000 2 1..00
.01.502 -412.H CH.F.1.PE AP.14 EACH .0.50 090.00 2 09000
.01 602 TRASH CH.FOR 13210E A.014 E.. 401.50 1.6..00 2 2 00100
2501.602 -112.H GU.FOR 24,10573.3 5.91 ..00 605.00 0 643300
.021521 359 PPE CHAN LH. 8. 37 3 11050 070. 2„2.
05..1 0 0.2 05 2.5.1314 154 FT 7.16 13,108 N.. 13,100 .72220
2502573 INSTALL P.C.C....HEADWALL EA. 220.00 ".... ...-__. am
2509.511 15.CAP.69903 2.. 3100 5.56 25 41420 .2 2.02.
2503511 104.PIPE SEWER LIN. 08.50 143 2.... „2' 5.382.30
2.5. 20.0.52.2. LH. 50. N 7060.60 39 1 270.241
2...1 139 RC PIPES..DES.0906 0.5111 .FT 00.00 007 'I.'. -1°. 0..8.00 . 15...00
2..1 214 1.PIPES..0.1134 3.3C2.111 LH. 3610 . 14.07200 . 094 1597200
2.222 20..2........... 2.. 40.15 . 13,13220 320 1110520
90.654, 27.0.5...N.5..0.5996 9 LH. 59.75 34 16.661. 347 110.125
2603.341 SC RC PIPE SEVER DES.30060.3111 204 FT 6. 358 1565597 -'- 3.50 155.50
2649. CCHNECT TO..1.STORM 52.12 E'ACE1 '15. 5.005.00 7 5005 99 -
2500002 CONX5C3 MO.267.09.4A.STRUCTURE 5ACH 1.925 00 . 1 ps.o3_._
2.002 CONNECT 1-0.13.0 0501-551.02M 5.H 1.860 00 .5050 ,
2504009 120242A147 .. 5.0 00 4.00
2606602 243263.02.09 .CH 7100.00 .1.1:0-01°-- 1700.00
2.002 .5252 GATE V.E.A.NO 802 EACH .0 00 210003
.04.. AO..WATE9 A177010029 EACH am a 1.66003 1560.00
.6. .4 2.66.2.026..... EACH 11250.00 .76009 25730,00
2504. .GA.V.VE 4.70 802 0.11 1..09 2.200.. 3.0.00
2504...WATEPIAAIN OUCH.PCN CL 62 1.114 Et 05. . 1.618.00 23 1.516.00
2504.80S 0 246222.24 CUCT.PON CL. LH FT 71.30 23 6.30 . 1.044.30
26... 10 WATERMAN DUCT.1201.52 1.24 Ft ea. 1 Deo 151.00 1 640 151.80000
.4.4172 rr arEo.c.No■PF LIM R 163.00 174 207/000 174 20 710.00
2..009-93 STE.CASHe 11102 LAX FT 10837 1. 25.30 175 . _25750.
2504.606 0.71.110.74472404 90.0 8.00 3.042 207..50 3.040 20.4.00
, ..
2508.900 CON.941.2 92624.2 S.C..1726924 a EA. 264523 22 45.000 22 ..77029
2509. CONSTRUCT 011.24.6 ST.C.E 1.3.456020 EA. 2.4.. 77 88.340.50 V as.sam
.6.. C9559-21.0.24.582.C..0E6.605020 EACH 7...00 87..00 2 0.00
2'.'-.159e0 ZrECT:=347:87A50:120.2 rAC‘Cri 1M: i: 7.135490
,2611.501 RANINN PPP.2,5510 .. 110.00 64 5.0...- . 7.102.00 . 2,880.50
2.2...., 2.,.......22 60 Et 300 INS 2.242 00 2.735 0546.00
.26. 0.9.297.06620,20 SOFT 0..10 718 3...10
.21.511 r errumwous tx,r, .Er 71'20' 09;: 10782100 _00.6 197021.00
2571.501 CCHCPECEC21256.10174.9 0E5..24 LH. 12.10 14.700 men. 14702
2531,507 3 CONCRETE ORM.01279.142 90 VD 003 177 7.788.00 177 '7f.:::
2531 616 2122124.2.DOA. .CT 44.00 100 4.400 00
3.85 1,554 2958750 7.1
5307. 1064 20.7.
5.007.00
2540 002 MAL.2 EA. ss.oe 1 6500 1 ssoe .
2.0.605 1445 BOA SUPPORT E. 143.00 1.00100 7 1001 00
2.5515 202117 001.04266014 0500012 34009.12 EA. 707.50 7 5.562.50 7
2540.. .059890157...5 SPLICE 5.14 650.00 7 363000 --7 3,600 09
2545.657 Kmolico.E E .-1 ".'. ' 13.475.00 1.7500 ,
2546.002 1.11.1.7.1.5412 5.91 ... 7 3.800.00 7 0.050 02
E,c,, ,...22.0.20 175 4,612.60 175
7.70050 ;I:r0
2..615 0010.1-61.42.202 .16ENBLE 2..00 2 4..36 2 3..
2657.501 22111522.5 058.26000022 7.23 u cod 010 nE 4.4. '1° 104.00
2.0. 9..0.049.02 9542 SUM 44.090.0/5 1.00 4500090 0.70 11...00 0.08 1.19 093 1 020.00 O. 1.00 0.07 0.000.002
1....700.4.9.11172 007.72324.10.90022. 1. am.
PARTICIPATING NON•PARTICIPATING
TOTAL
SP 07081,024 SCOTT
COUNTY SHAKOPEE
PUBLIC
CHAN 17 LW, WOOD DUCK TRAIL HON.5.111 COUNT UTILITIES
..o. .fr MTV EHT9 NONTRAV wrom NE, 00... ROADWAY
NO. ITEM ON. INC; Qum; AYE.. .TO MTN 1551717 15.0 EHrO E.0 MO N5r0 ES. 58.1 0.0 15.0
mum AMOUNT ONINT. MOON,' %ANT. AVM. OUANT. MOUNT .1.117. AMOUNT WM, MOHR
2 2
2564.331 SIGH PAAELS TYPE C SOFT 44 DO 29.5 1.580 295 1.8.00 •
25..531 SION PANELS TV,OH 60. .00 . 8,80 186 11...00
25..537 1.TALL SION TYPE C EACH 185 03 12 1.5.00 . 1... ,
2534. INSALL SIGN FA. 1... 10 1.5.07 10 1.455.
2564.602 INST.LIARKER EACH 8250 MOO 165.00
! 2573.502 ;ET FENCE.PAGE. LIN FT 1. 17..5 A.M. 17.456 .251.00 4250 7.078.65
2673530 WORN DEAN INLET PROTECTION EACH 1..30 NO 11385 00 89 11358.30 126.
2573.533 SEINNE.CO.ROL LOO WREST.. t„,, • 3,, ,,,,, 5.11158 1.852 GI I'.
3373.380 GOA..E.CONTROLS EACH .5. 12 2,112.00 10 1,76000 3.32.00
2574.308 FERILLIER IIIIIE 1 POUND 0.55 3. 3.094. ;282 Aes as
2575.302 S.0 N.120E23.10 POWD 306 1.127 747/75 0i2 155 472.75
2575505 SDNANO TV.SILT TOLERANT SONO ,. ..v,
2575.511 NUL.NATERLN.111.1 TON 14630 227 31/155 227 3.711.
T7V51! '41'0=04NEETSCATEG0.3 EEG ACRE 152. 11.1
SO. ,..... ,L.,
60,275.80 19. 1..3.20
12.717 21857.
3575571 RAPID ST.LNATOON L.11400 7 •N CALLON 560. 175.0 87800E0 .000 .700.00 .000 13.200.00
2651.501 RE110..LEPREFORNEOPAVE.N1.0.0.10TANE I.. I. 2..1 ..,„, ,.., 4,1.
2582. PAVEL1EN7..A.(LT AR...EPDXY . EACH 177.. 55;00 4' 5..
2503.501 PAVEMENT GENSAGE..PO.EPO, EACH 12750 02600 MOO
2582.502 4.DOUBLE SOLO LEE YELLOW.P.,T LIN FT 0 45 2.7. 1,875.8a 3724 1.5.00
2582.502 a'SOLO LINE WHITE.EPO. .FT' I. 1.362 1.1■21.00 1..2 'R.. .
25.932 N.SOLO LHEINKrEFPDXY LIN FT 8.87 204 ,.,,,,, ,,,, 1.795. .
36.501 4.BROKEN IEEE WHITEEP, LIN. . 0.40 1.502 ...
1.60 •
•
r5:2'.:122'8:01'.1771"N t711:== ' LIN FT 120 83
., LIN FT 2.75 60 13880 83
165.00 60 165,00
2682502 4GDOLID LINEYELLOW.O. ' 80'4 • i:•'5, "2: 3,5... •
25.503 CROSSWALK NA0.4,0,PREFORM 4,75100 1(10 06 2.00
• •
TOTAL .3115,067.26 3;428,484.. ..1194.96 SGSSSIA‘N stn.. SGSNalso
I rAYS"A 7o'A'A's'A Srsa'arsawA"a I LA'u::ruu I :',..A71:'s '11 37.2.
37,5125
I I I I I
ORAND TOTAL..PAVING OF LINN;GOLOT IMINEWAYS 34,44.7,27120
TOTAL FEDERAL ELIGIBLE $3,781,181.85 + $240,318.40 = $4,071,47825
GUN 17 ST,SMER I50. 317,7308
LOWENSTEIN ROWE(50.4) ..610 73
•
PRELIMINARY ENGINEERING(10. 717.557. 512,150 68.187 •
OINSTHULTION INETNEERI.1891 514.068.01 ...5. ...4.
R.I./INTRA..IA, 55.27622 W.. ..,72 $11.771.08
I 701,15 .. 321;807. 3.185. 917.390. .2.150.53
...GEE FEDERAL NON.AATICIPATI. WOO
S.x.EE NON.PARTILIPAIINO 7.1.00
SHAKOPEE PAPTICIPATINO•/ASSUNES 809 FEDERAL.2117.0,NO4ENSTEIN COURT RIOADNAV II.1 I $106.8.79
PRELIIIIIINIE ENGINEERING(101,OF K.BITUYINO.-TRAIL,5.OUT...0 ITEUS,50,STORY SEWER SYSTEN,A CITY 00A00,6,•SEE BEL. .....
CONGIRLICTIDN.40714.0.1%,OF PARTICIPATI.A.NEN.RARTICIPATIN. SASS..
ADMINISTRATION I3R OF PARTICIPATING 5 NON-PAFIGICIPATINOI SISAISISA
CITY Or SHAKOPEE CAST SUBTOTAL 821102730
ENGINEERING AND ADMINISTRATION COSTS FOR 111E CITY OF SHAKOPEE
. ....pub IR.ALONG GSAG 17,... .014.0 3 88.5101.
OUTSiDE CUM a GUTTER„CONCRETE.0 DES.N B.124,60GAG
OuTS.ECuRla A GUTTER ITEM.6.CONCRETE DRIVEWAY PAVEMENT,96.1 as I I,.
STORM SEWER SYSTEM ISO., 3 175.67306
VECRIOD COCK TRAIL ROADWAY1100.
NONENSTERI COURT RC.DINAYINOIN
TOTAL 51-10.0PEE COST FON PRELIAIINA.ENGINEERING 5 5....3.05
12%PRELIMINARY ENGINEERING $ 53,177.40
8%CONSTRUCTION ENGINEERING 5 42,541.92
3%ADMINISTRATION 5 15,95322
..................F.L........ 2 of 2 4,2,4