TO: Mayor and City Council
FROM: Jamie Polley, Parks & Recreation Director
DATE: 03/03/2015
SUBJECT: Ice Arena Improvement Options (A,B, D).
Action Sought
The City Council is asked to provide the architectural consultant with direction on
how to proceed with the architectural and feasibility studies for the Community
Center 2.0 project.
Background
On December 2, 2014 the City Council authorized the hiring of 292 Design Group,
Inc. as the architectural consultant for the Community Center Study. 292 Design
Group, Inc. is tasked with:
1. Developing a plan for all of the components within the study based on the
programming recommendations from our feasibility study/market analysis.
2.Determining the cost to change the cooling system of our current Ice Arena per
state requirements and add a second sheet of ice to our current facility as well as
determine if a future 3rd sheet could be built on the same site.
3. Determining the cost to construct a new 2 sheet facility on property that does not
require purchasing.
Discussion
292 Design Group, Inc. began with the tasks regarding the Ice Arena because the
location of the Ice Arena has an effect on the design, location and potential cost of
the other components. In order to proceed with the study, the consultant needs
direction from the City Council on which Ice Arena option to pursue. In addition,
the feasibility study consultant needs the architectural plans to complete the final
phase of their study which includes putting together operational proformas for the
Community Center and its components.
Option A; Adding on to the current Ice Arena:
This option replaces the cooling system of the current sheet of ice and adds a second
sheet of ice onto the existing sheet. It has been determined by the consultant that a
3rd sheet of ice cannot fit in close proximity to the current sheet of ice on the
community center campus. The pros of this option include the ability to continue to
utilize the current sheet of ice and there is a lower initial capital cost ($12.8
million). The challenges with this option include the potential loss of a hockey
season, traffic flow/congestion, the inability for patrons to get from the lower level
of the current sheet to the lower level of the new sheet, small lobby/office area due
to space constraints, skaters travel across the path of the ice resurfacing machine
posing a safety concern and the inability for a future 3rd sheet of ice. If only the
cooling system is replaced in the current sheet of ice the estimated cost is $1.75
Million as indicated in the 2015-2019 Park Asset Fund Plan.
Option B; Building a new 2 sheet facility:
This option plans for a new 2 sheet facility, built on land that does not need to be
purchased by the City. The two ice sheets would be side by side with the potential
for a 3rd sheet of ice to be added on in the future. In addition, this option would
repurpose the current sheet of ice for another use (indoor aquatic center, sport
courts, etc.). The pros with this option include a well planned facility that could be
managed effectively, one of the sheets of ice could be the main sheet while the
second sheet could have less seating and serve more as the practice sheet, ease of
traffic, the potential to partner with another entity on the location, the ability to
utilize the current sheet of ice during construction and the ability to repurpose the
current sheet of ice and save capital expenses on that amenity vs adding on to the
Community Center. The challenges of this option include a higher initial capital
investment ($16.7 Million) and it would not be located on the Community Center
campus.
Both options include shelling out the HS team rooms and dryland training area and
adding additional parking to each site. The cost to finish, furnish and equip the HS
team rooms and dryland training area would be the responsibility of the School
District and the Shakopee Youth Hockey Association.
Relationship to Vision
A. Keep Shakopee a safe and healthy community where residents can pursue active
and quality lifestyles.
B. Positively manage the challenges and opportunities presented by growth
development and change.
D. Maintain, improve and create strong partnerships with other public and private
sector entities.
Requested Action
The City Council, is asked to:
1. Direct the architectural consultants, 292 Design Group, Inc., to pursue option A
or B to complete the architectural study.
2. If Option B is chosen direct staff to pursue potential partners and locations.