Loading...
HomeMy WebLinkAbout4.E.1. Approval to Purchase a Shade Strusture for the Shakopee Skate Park Consent Business 4. E. 1. SHAKOI'EE TO: Mayor and City Council Mark McNeill, City Administrator FROM: Jamie Polley, Parks, Recreation&Natural Resources Director DATE: 10/21/2014 SUBJECT: Approval to Purchase a Shade Structure for the Shakopee Skate Park (A) Action Sought The City Council is asked to approve the funding of a shade structure with concrete pad for the Shakopee Skate Park. Background The Shakopee Skate Park is located at the Shakopee Community Center and is free for the community to use with a City issued wristband. The park is located along Fuller St and is surrounded by shrubs and small trees. At this time the trees are not tall enough to offer the park users any shade. Discussion Included in the 2014 Parks Services general fund budget is $5,500 for a shade structure over the bleacher area of the Skate Park. Staff has obtained two quotes for a cantilever shade structure. Of the two quotes obtained only one company also installs the structures. It is also recommended that a concrete slab be installed with the shade structure. Based on the time of year and the limited availability of City Staff to install the structure and install the slab, staff is recommending that the City purchase the shade structure from Midwest Playscapes, Inc. in the amount of$5,988.00 and also have Midwest Playscapes, Inc. complete the installation of the structure and the slab. The Midwest Playscapes, Inc. structure is a larger size at 24'X12'X10', but approximately $1,000 more costly than the Waterloo structure (221X10'X8'). Staff recommends purchasing the larger structure. Budget Impact The Park Services general fund budget Operating Supplies line item currently contains a balance of$12,500.00. The $5,500 budgeted for the shade structure is included within this balance. Additional items that were budgeted for include furniture for Huber Park if needed (chairs and tables for rentals) and furniture for the Youth Building. At this time there is not an urgent need for furniture at Huber Park or the Youth Building. The cost to install the concrete slab could be covered utilizing a portion of the remaining $7,000. Relationship to Vision A. Keep Shakopee a safe and healthy community where residents can pursue active and quality lifestyles. Requested Action If the City Council concurs, approve the purchase and installation of the Skate Park shade structure and concrete slab from Midwest Playscapes, Inc. utilizing the Park Services Operating Supplies funding in the amount of$11,997.00 Attachments: MWP Structure w/Install Waterloo Structure Telephone: 952 - 36 1 - 3504 0 t1+1FWESTPLMScA E ,INC. Fax: 952 - 361 - 3549 Toll Free: 800 - 747 - 1 452 500 Pine Street, Suite 104, Chaska, MN 55318 www . midwestplayscapes . com E-mail: playscapes@earthlink.net Quote �-,- .. I x k .; 5) Project: City of Shakopee Phone: 952-233-9507 Contact: Brad Eller Fax: Ship To: Park Supervisor Bill To: Same Shakopee MN Email: Shipping Contact Name: Date: 10/7/2014 Qty Design/Item # Description Price each Total 1 SP Full Canti 24x12x10 ft Shade System $ 5,988.00 $ 5,988.00 90 MPH wind load with snow load Included in bundle 2 post I Shadesure mesh cloth Install option with pad and footers 26x14 Subtotal $ 5,988.00 Freight $ 1,150.00 Tax Exempt# *Please provide certificate Install $ 4,859.00 Local Sales Tax NA Total $ 11,997.00 NOTE: The Freight above is estimated and subject to change due to the rising Fuel costs. NOTE: UNLESS OTHERWISE NOTED,prices shown are material only.They DO NOT include:assembly,installation,border,safety surfacing, drain tile,geotextile fabric,removal of existing equipment,site preparation,excavation or site restoration,unloading of equipment,disposal of packaging material,storage of equipment,additional insurance and bonding would be extra,unless otherwise stated above.If playground equipment or materials are stored off site,customer is responsible for transporting equipment to job site. Prices.firm for 30 days,subject to review thereafter. Our terms are net 30. A.finance charge of 1.5%will be imposed on the outstanding balance unpaid for more than 30 days after the shipment of materials.Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion.Retainage not accepted.Once customer has signed quotation,your order cannot be changed or canceled.Please allow 3to4 weeks for delivery after receipt of order. Standard manufacturing design,specification,and construction apply unless noted otherwise. Customer is responsible for the identification of all underground utilities.Area must be accessible to Bobcat and other equipment necessary for installation or additional fees will be charged.Freight quote is based on customer unloading equipment and checking in all equipment for any missing parts.If product is refused by customer upon delivery for any reason(unless damaged), without prior authori.ation from Midwest Playscapes,Inc., the customer agrees to pay 20%restocking fee plus freight charges. If we can be of Other Assistance,please feel free to contact us. Signed: Accepted Matt Finnegan Date: Printed Name: ' TEL Quotation Qa ry& let a_!/890 Waterloo Tent& Tarp Company, Inc. 3105 Airport Blvd. Phone: 800-537-1193 Waterloo, Iowa 50703 Fax: 319-234-4670 Shakopee Skate Park Quotation#: 11692 Brad Eller Date: 9/17/2014 Shakopee MN Customer ID: Terms Phone 952-233-9507 Fax email address beller @shakopeemn.gov Quantity Item List Price **Disc% Discount Net Total 1 10-0 x 22-0 Cantilever Frame and Top $4695.00 5 $234.75 $4460.25 standard 8-0 entry height Sunshade Mesh Fabric Dual ground sleeve mounting *-FOB Waterloo, Iowa unless otherwise directed. List Total $4,695.00 Tax $0.00 This quote does not include installation, shipping, or any applicable taxes. Freight $386.83 Rush Order Discount $234.75 Quotation valid until: . Net Total $4,847.08 Quotation Prepared By: Cheri Koth