Loading...
HomeMy WebLinkAbout7.D.2. Small Improvement Plans for Stans Park ADA Trail _0 __..___0___. 7,P'd. ! --- CITY OF SHAKOPEE Memorandum CONSENT To: Mayor and City Council, Mark McNeill, City Administrator From: Andrea Weber, Parks and Recreation Landscape Design Subject: Small Improvement Plans for Stans Park ADA trail Meeting Date: Aug 15, 2006 INTRODUCTION \ This item is to seek approval to complete a small improvement project in Stans Park that will provide ADA access to existing tennis court facilities at the park, as well as including some aesthetic landscaping enhancements working with an Eagle Scout candidate. BACKGROUND This project was identified in the City's Transition Plan for Accessibility Modifications to facilities with barriers to access for persons with disabilities. The City Council approved completing all Priority,1 ADA access modifications in 2005. Priority 2 items are to be completed in 2006. The Stans Park tennis access trail was identified in the plan as a priority 2 item. In addition, an Eagle Scout Candidate, Luke Spellburg, approached me last fall with a desire to do a planting related project to achieve the rank of Eagle Scout. Luke has prepared a planting plan, and will raise funds to purchase the plantings as well as organize volunteers to do the plant installation. I will continue to support Luke with this project through installation. Additional enhancements include either two benches and a bike rack (3 bike hoops) or a shade canopy structure. Addition of these items is contingent on (a) available funding, (b) further research on the durability of the shade structure, and (c) Public Works work load and ability to install these amenities on a timeline that works for them. Drawings of the trail segments in Stans (A) along with trail quotes (B) and site furniture estimates are included below. BUDGET IMPACT The quote for the trail connection in Stans Park is an ADA modification. The funding is proposed to be taken from the Park Reserve Small Improvements Budget. Each year there is $20,000 budgeted for small improvements. Additional benches, bike racks and Shade structure would be included if the funding allows, and if Public Works has the ability to do the installation. The plantings and related materials will be purchased with donations that the Eagle Scout Candidate raises. A motion to accept this donation would be brought to Council after plans are finalized. I requested quotes for the trail work from three local bituminous contractors (Bituminous Roadways, Minnesota Roadways Co., and Plehahl Blacktopping). I received two quotes. One was from Bituminous Roadways, for $25,800.00 and from Minnesota Roadways for $ 16,216.00. Total costs are as follows: PRICE ESTIMATE NOTE ITEM Trail Construction $16,216.00 Low quote (includes staking) Sun Shade $2,996.00 +shipping 2 benches & 3 bike loops $1,883.00 I ncl. tax + shipping, TOTAL $21,095.00 +shipping Since the costs exceed the available funding, we would like to meet with the Tennis Association to determine whether the sun shade structure or the benches and bike loops would be more desirable. RELATIONSHIP TO VISION A. Active and Healthy Community B. Vibrant, Resilient, and Strong REQUESTED ACTION City Council is asked to move to approve funding in the amount of $16,216 from the Park Reserve Fund for ADA trail connections by Minnesota Roadways. In addition, City Council is asked to authorize additional funding up $3,784 for either the Sun Shade structure or benches and bike loops, contingent on satisfactory results of our additional investigation on the shade structures, discussion with the Tennis Association, and availability for Public Works to do the installation. (J) D -I-J -I-J 1... c: :J OJ 0 E u OJ (J) U 'c c c CO Q) OJ..c L- I- C ::J W -1-1 -- I ciS c: .:::l. L- - ::J ~ .- = u.. CO co co Q) 1... L- a.. I- .....~ U) (J) "OUl Q) Cl C (J) (f) c: OJ o -- CO U o.t) ......, U o -- (/) <( L- X a.. Q) NOTES, 1. THIS DRAWING IS NOT A SURVEY. IT IS PROVIDED fOR THE CONTRACTORS CONVENIENCE. ALL DIMENSIDNS MUST BE fIELD VERIfIED. 2. THE CITY SHALL APPROVE STAKING Of THE TRAIL PRIDR TO EXCA V A TION, 3. CALL GOPHER STATE ONE CALL 48 HRS PRIOR TO DIGGING 651-454-0002. 4. ALL TREES TO BE PRESERVED. 5. TRAIL MAY NEED TO BE CURVED TO JOG AROUND TREE BETWEEN COURTS. KEEP DISTURBANCE TO ROOTS AS MINIMAL AS POSSIBLE AND KEEP TRAIL 3' MINIMUM fROM TREE TRUNK. 6. TRAILS CONNECTING TO EXISTING CONCRETE SHALL MATCH GRADE 7. SAW CUT EXITING TRAIL END PRIDR TO PA VING CONNECTING SEGMENT. 8. TRAILS TO MATCH EXISTING GRADES. 9. SEE SHAKOPEE STANDARD TRAIL DETAIL Sunports International, Inc. Page lof2 . Airports . Amusement I Waterparks . Auto . Cabanas · Commercial Parking . Day Care . Playgrounds . Pools . Seating . Sports . Walkways Description Bleacher cover between tennis courts Features 4 Posted unit provides cool shade and protection << Back ,,~"'lYM <C::'fF 'ill '.'\i!Illi"! 'i)s,'-i USA SHADE & Fabric Structures. Inc Discover our other brands at: .~ ItI ie...."...",:] -- ~ Shade Structures I FabriTec Structures http://www.sunports.com/examples/indexm.asp?id=400 8/10/2006 Sunports International, Inc. Page 1 of2 . Airports . Amusement / Waterparks . Auto . Cabanas . Commercial Parking . Day Care . Playgrounds . Pools . Seating . Sports . Walkways Description 8 waves connected Features 20ft x20ft waves connected << Back USA SHADE & Fabric Structures. Inc Discover our other brands at: ~ p.tfS! Shade Structures I FabriTec Structures http://www.sunports.com/examples/indexm.asp?id=993 8/1 0/2006 Sunports International, Inc. Page 1 of2 . Airports . Amusement / Waterparks . Auto . Cabanas . Commercial Parking . Day Care . Playgrounds . Pools . Seating . Sports . Walkways Description 2 wave units joined Features 6 posted wave units with two seperate tops << Back ~~?Itl"7 A;Ij;'~t 'i~ USA SHADE & Fabric Structures Inc Discover our other brands at: ,i!I ',II L,J ~ Shade Structures I FabriTec Structures http://www.sunports.com/examples/indexm.asp?id=302 8/1 0/2006