Subject: 1 ih Avenue Sports (Soccer) Complex Plans and Specifications and
Authorize Bidding, Project No. PR2005-2.
INTRODUCTION
This agenda item seeks approval of the plans and specifications for the 17th Avenue
Sports Complex building and authorization to proceed with bidding.
BACKGROUND AND DISCUSSION
The original design for the 1 ih Avenue Sports Complex support building came in over
budget, and City Council rejected the bids. The architect that did the initial design is no
longer with BKV, so we had been in some limbofor a period oftime while a new
architect was assigned. BKV assigned Victor Pechaty to lead the redesign, and several
potential design element changes were presented to the Parks and Recreation Advisory
Board at their December 2005 meeting. Based on their feedback, we provided direction
to Mr. Pechaty on the function of the building, and asked him to come up with a redesign
that would fall within the project budget.
The Advisory Board and City Council reviewed and approved the schematic design in
March 2006 and ordered plans and specifications. BKV Group, along with assistance
from Dale Gade in the Engineering Department and Andrea Weber on our staff has
completed the plans and specifications. Select plan sheets are attached.
As discussed in March, the materials are commercial quality and vandal resistant. The
exterior materials area primarily red brick identical to the brick on the new SPUC pump
house along 1 ih Avenue. The roof is a standing seam metal roof. Other materials
include painted block, painted metal facades, and laminate plywood accents. All fixtures
are commercial grade, and the concession stand design meets Minnesota Department
of Health guidelines.
Two items that were discussed by the Parks and Recreation Advisory Board but not
decided at the time of schematic review until there were further refinements in the design
and additional cost estimates were a shade structure and heating. The current design
includes the shade structure as a bid alternate but does not provide heating due to the
costs for the mechanical systems and insulation.
One issue that came up during the plans and specification stage was how to handle site
drainage. The site has a large expanse of turf that drains toward the building. During
heavy rainfall events, considerable overland drainage occurs. In order to handle the
drainage, a stormwater catch basin and storm water piping is needed, which was not
anticipated in the schematic design. Cost estimate for this component is $28,000.
The total CIP amount for this work is $523,000, which includes building construction and
finish work completed outside of the building contract. The following is a break-down of
estimated costs:
Bid Items Estimate
Base building construction, including stormwater improvements $482,530
$28,000 and 5% contin enc
Buildin Alternates
Alternate #1 - Sun Shade Structure* 8,190
Alternate #2 - Sk Li ht 8,300
Alternate #3 - Benches 3,040
Total Pro.eet Costs**
Bid Total Subtotal with Recommended Alternate from above 490,720
SACIWAC Char es 13,000
Picnic Tables and trash cans 10 $800 each 8,000
Finish Site Work, Landsca in , Irri ation 10,000
Total 521,720
*Alternate recommended by PRAB.
**Total project costs do not reflect concession equipment and additional site fencing.
These items could be funded from the project budget upon completion if funds allow. If
not, the Soccer Association would be asked to contribute toward these costs.
Substantial completion is planned for April 15, 2007, which would allow contractors to
complete any finishing work in the spring.
REQUESTED ACTION
City Council is asked to move to approve the plans and specifications and authorize
bidding for the 17th Avenue Sports Complex Building, Project No. PR2005-2.
SYMBOLS KEY I B K V
EXIST CURB ROCK GARDEN - G R 0 U P
SEE LANDSCAPE
EXIST SIDEWALK EXIST SOCCER FIELD Architecture
EXIST DRIVE TREES _ BT OWNER Interior Design
Nf~ CONCRETE SIDEWALK, SEE CIVIL SHRUBS _ BY OWNER Engineering
~~~~C~~~IIA; STEEL COLUMN - SEE STRUCT Boarman
4 THUS BY ALTERNATE #2 Kroos
LIGHT BOLLARDS, SEE ELEG. Vogel
BENOl - . BELOkI:"5LAB 4" PVC SLEEVE FOR FUTURE J Group
SEE OTL5 I, 2, 3/A11.4; TIE-IN TO EXISTING IRRIGATION. L.OCATI(~ Inc
3 TI-IUS BY ALTERNATE UI ~~I~ ~i-r:~J~~TN~ =~~~~~ r .
PICNIC TABLE - BT OWNER SHADE STRUCTURE (SHOWN DASHED) - 222 North Second Street
BICTCLE RACK 2 THUS BT ALTERNATE '4. ALSO SEE" TE'16. Mi lis MN 55401
I"" DIA. DRILLED CONe. CAISSON, "". DE nneapo ,
DRINKING FOUNTAIN r~~ ~~,;g:;'T-C~~,j~"'s"...~~DJ,i.TI Teiephon~: 612.339.3752
J EXISTING TRANSFORMER(S) - EXPANSION ANCHORS, SIZE AND SPACING BT FacslmJle. 612.339.6212
VERIF'r LOCATION(S) WITH SURVEY ~~J; OF~c~~:is~PT{lo A~~ www.bkvgroup.com
DETERMINED BY SER AFTER RECEIPT OF
J J ~~'~~ON~~~.5 ~T~l~N CONSULTANTS
r r ARE APPROXIMATE.
~~ ~~".
~ON-GRADE PROJECT TITLE
If r ~r/ ~~~~~o.'" lnH AVENUE
m R I I I I r I ~ SPORTS COMPLEX
r. r 'r Il>'~j) .....f~. r P' P (\:~:~. .I! BUILDING
) /-~ ~ ~ ~ ~ p j
U /1'\ &r'\(\ 1&''\(\ &r'\(\ 1&\<1 ~I SHAKOPEEMN
) 0 ( 0 J J 0 I 0 ( 0 ~ ) 0 U ~v<J r~ (U ~ v<J ~~ Ai 'HEElTOlE '
~. <<' ", 'P'~ P 1\ ?'11/ ~ I c; '", & r'\(\ 1& ''\(\ I ~ SITE PLAN
/ "'- - V' "'-r-- 't- - 'r-- 'i- ...At] ~ (U ~ v<J ~ Ai .J!t:I
i I - _ ~
/1"'.... "'f---b,-Ibt-~.b. .- 1---- ----r--f------f----- --1---
:/ J - \ F r '- JI I ~ CER1IFICATION
\.... ~ l! lheo'ebycertifylhotftiip\an,speciicollon
orreportw<n pRIpoted by me orvndermy
! dtect$Vp8f\Ij$IOn OfIdfhQI lam a dJt{
---Il I ~ I ~ lbz 0 0 , UcensedJ'rafem:>noJ Ndli'ecl vnclet'
---:J ~ 1 V lhelawsoffheStaleofM....nesola.
[2J C IF'= 7 I
r T \I II c,,,"'.._ Dale
~ II H '"355
, 11_.16 - license Nvmber
---1 11l? '" f ,. L I REVISIONS No. DATe
-- -r--r-j- t- - ..+~ f-.- -- 'it- 'iti ir
~. -:"3><< ~ a. ..z-..r ~~ "-. ,,110 :'j<< - q,~.. }.''J I ~
p Ip Ipll pi Ip lip pi Ip I~ DATE ",."'"
.J .J .J~r.J J J .J "'AWN'Y cos
J CHECKED BY VXP
~ COMMISSION NO. 1536.03
SHEET NUMBER
AO.l
o 2006 BXY Group
~~ BKV
ell of ~ th WI'lUlI Jell BIll
I. DO NOt' 9CAl..E THE DIIAWINlt5 FCIt CONSTRUCTION ConcMsic:rnalToilet Room Finish Sdwdllle . . . .
5~U5f=~~n::== miTIS P--; ":. lotil .....""Holt E-I'fl!I'lM.=-~,,", c. C FIn. G.R.O UP
n1El)IA,TflT FOR CLARIFICATION. 104 E5S1ONS _ I"lL Cl"U_l EftIl"( l'AINT _I'UI. I'IH. -.., .....,. ""' G,,", _, "
2. CGINTRACTORS SAALL VERIFY ALL DlT"IfN5lClN5 ANP !I'QtY' IlE9IIf I'IlI. Cl"U-1 EPCIKT.......,. 0IlAHl0(.1'ftt. I'lN. ~.I ~4' 80-1 '"'" .
EXISTING. cctfDITlONS. ANT Dl5CA.EPfNCJES BETWEEN 1(17 MEN Iln1!! ~ _ .... 0'11_1 EPCIKT _ 0lWGI!_~ I'lN. ""'-I ~4' In GiT'l' _, " Arch,tecture
~:1f~~~~~IOR~.::.cEEDINli Interior Design
s. =~~IN~~~:IClteARETO Engineering
Boarman
Kroos
Vogel
Group
Inc.
...'.... ,..,. ..... MO ABOVE 222 North Second Street
"t-.. e'.... "-" .'.... "-" ....... ",'-" 0'_0' I ~... "-0' M1nneapons, MN 55401
~ """MOABOVE .~ Telephone: 612.339.3752
~ 2 .;$3 3 Facsimile: 612.339.6212
~4.1 -'3.1 MI ~ www.bkvgroup.com
.... -Ci::::Ci::. ,- _n -, ~ ~
---:-' r----- -------- ---- -- ---~ r~-?~--------- ---~~.:"'~--fi)------ --~- ~-- --1 E CONSULTANTS
'r I 0 0,..... ..t:b\-, \....0) I &
.. I ~ ~~ ~~ e I 1-11-101'- r=..~ ~ I 'r ~
I ?- ~- --- t-'" ~s~- A1I.1. '6'-O'v,. _eo 2'-&" 2'-&" ~1-J:1- 5'-.. ~ ""!
I.' . .. s'ro\\'ME~ ,~ /' ~ I
: ~ \ / rt\, } ~" op..,.~.. ~ ~.~ J ~ I
~ I ~ - - - - ~'-" 0 &- ~ -n I~ rr:~~ I"'"A - -7\ :~:>{ ~_ I ~ i PROJECT1IllE
I rt~lI''''' ~ ~ b A3.1 5 ~::z: - t ~t I ~ ..... -.x- I 2 lnHAVENUE
~ 1 -< ~ ~ ~~ I!r-A ~1 ~ t 6\ ~I rfo \ I 0 0 ~. ,1 I ~ ~ ~ SPORTS COMPLEX
. ~ ~ } .." M-' ABOVE1 ~ ~ "__ ,,~ I ~ r 2 \ BUILDING
~~ ; : 0 \" ~ S~E ,0 ~ ~ 80 rr--=\'il ~- ax~-~i: 7i~) -t: ~ ~i3.1J> I ~,-~y
A3.1 ;, I 17 II II ~ " ~ A. I ~ Y
, _ rrr \ 19I11g11 t"I (') c; I I '.l. ~ 2 SHAKOPEE MN
I ( .j " " I ~ I .""""" ""', R'-O' ~-O' -" \.A4 ')1 .
I I ~. ~ II II ~ '0'0. . 'r =-" ~ D..~. I _J ""- " ~ ~ SHEET1I1lf
AIl.:f L. J ~ f i).,~ . I....." 5ClUD_ACIIGJ .. ,. Ii '" I
I ,... ..~. ,~~ 1.b===:!J '"'/ ......~" "1:~' -- - ) I .. ~ FLOOR PLAN
"~ ~ ~ 102-8 -- I 10" ~ ~ ---- . ~ fq -
~ I - ~ ~ ;" J ~ r- .. "'-- ~ M"'@-i'-/, ~ I &
l II 3: ~ II /...." <~''"'I\'' ! ~, \ ('.L . / ...~OO ~.~ '..3 I ~ FINISH SCHEDULE
I I~ in .JAI':-" ~ ~ 1" CAll.21 \. L _,5 li1iiiiiLJ 1-4
~ .. ~ \ I
..L L____-'- ---4".--------- ----_ ______________ -'r!----~""~-~---~"- ._~_ ~__ __J CERTIACAllON
&:. - ~I :iT~=~ _ ~ ~ :"~~=:n~~;:,~
.!::!:... ~~.'" 2'-0" ::~jl~~~r
20'-0. 22".... 2&'..... 3'-0" 3'~&' r-- the IO'ws of the Slole 01 MIr'lnesolo.
W NDH no AeW'E \ \ .'-0" HDH no ABOVE
1 2'-0' LVR no ~E
IBUILDING 'A"I . A3.1 IBUILDJNG "S"l DovldR.Kroos Date
#JJ3S5
LIcense Number
REVISIONS No. DATE
(t~~ DATE .,:x""
~ DRAWN BY ellS
CHECKED BY V'IP
~ COMMISSION NO. 1536.03
NORTH SHEET NUMBER
Q) :::~?<?~,_~.LAN .....-03-A,p-O, A 1. 1
c 2006 BKV Group
B KV
G R 0 U P
Architecture
Intertor Design
ELEY . IO'~ Engineertng
~~,~ ~_~~ C11U Boarman
......, Kroos
~RMI~ Vogel
~~&.;/. Group
,F.E. ELEV . -r-e" Inc.
222 North Second Street
~ ~EST ELEVATION (J) SOUTH ELEVATION Minneapofts. MN 55401
3 1/&-" 1'-0' 153&-03-AEL lie' . 1'-0' 1,:)3&-03-AEL Telephone: 612.339.3752
FaC$lmDe: 612.339.6212
www.bkvgroup.com
AF5-1 CONSULTANTS
~~Et.EC
RLDGEt~ ~ q~'
PROJECT TITlE
. ~ R.~I:' 17TH A VENUE
F'~:"~~l'~' SPORTS COMPLEX
BUILDING
@EAST ELEVATION 1~-03-AEL @NORTH ELEVATION 1~3&-03-AEL
3 lie'. "_0' lie' . 1'-0'
SHAKOPEE. MN
SHEEfmLE
EXTERIOR
ELEVATIONS
~~ ~ 1~~.P'V.
UGI-IT, SEE ELEe PMLG-l
~ .......1 fLf\'. ""-04" ST!.. COLUMN, SEE
b (;0-1 STRLlCT
....., CERTlACATION
lherebycerlifyihCltthlsplan,$J)OCl"1C01Ion
orrePOrtwas prelXlred by meorundermy
d~ect supervfs!onl:ll1d lho/lama 0Av
UcernedProllmlonal Architect l,/t'lCIer
IhekrwsoftheSklleofMi'lnesolo.
@NORTH ELEV (CONCESSION BLDG) @SOUTH ELEV (MEETING/STOR. BLDG)
3 1/&". I' O' 1~3&-03-At.L 3 11&" - 1'-0' . 1!;)~-03-AI;.L
Dovk:tR.Kroos Dol.
#1135s
Llcense Number
REVISIONS No. DATE
.BL~L~T~ 12~ ~~ ~ J'?eo ~.
DATE 07.'20.06
DRAWN BY C"
"",1 ""., CHECKED BY v>P
NO SWTG-I, PAINTED NO SUTGi-I, PAINTED COMMISSION NO. 1536.03
DRtNr:::INri FOUMTAIN, SEE DRIt<<INt.;, FOUNTAIN, SEE SHEET NUMBER
"w< "w<
@ EAST ELEV (RESTROOM VESTIBULE) @SOUTH ELEV (RESTROOM VESTIBULE) @"'EST ELEV (RESTROOM VESTIBULE) A3.1
l/fl . 1'-0. . /,,j6-03-At;1. 1/8' _ 1'-0' lSo3b-Q3-AEL 1/8' . )'-0' . ISo3b-D3-At:L
o ~ 8KV Group
B KV
GROUP
""'-0-1 Architecture
~~.$EE Interior Design
"""""""" Engineering
-. D~I. SEE IS./'All.2
~ I ""-I Boarman
PNLG-I Kroos
!V... WD-I I"RAM~ Vogel
~ ~ PNLGi-2. coto Group
!l ~ RECEPTACLE. SEE Inc.
ELECT.
" d ~
" . 222 North Second Street
MinneapoUs. MN 55401
ROOM - NORTJ.l Telephone: 612.339.3752
1 1oI0MEN'S TOILET ROOM - IoIEST ELEV. ELEV Focsimne: 612.339.6212
q 1/4".. .1'-0. - -I L 1~3io-03-IEL 15~-03-IEL www.bkvgroup.com
"""'"
CONSULTANTS
~ ~
" "
~ " ~ PROJECT TITl~
~ "
~ ~ 17TH AVENUE
J / J SPORTS COMPLEX
" / "
T...... BUILDING
4 MEN'S TOILET ROOM - EAST @MEN'S TOILET ROOM - IoIEST ELEV.
q 1104". 1'-0. - - q 1/4".. 1'-0. .. 1~.36-03-IEL
SHAKOPEE. MN
SHEET TITLE
INTERIOR
ELEVATIONS
CERTlACAnON
I herebycertily lhol lhis pIor\spedicollon
OfreportWOSPl"epaed by me or under my
d~lsuper.1slon and ttlollom (I duly
tk:ensedProfesslonat Arehitect under
the lawsoftheSloleol ~nesolo.
DavldR.lC1oos Date
#11355
L.k:ense Number
REVISIONS No. DATE
DATE 07.20.06
DRAWN8Y CRS
CHECKED BY VXP
COMMISSION NO. 1536.03
SHEET NUMBER
A9.1
o 2006 BKV Group
~ ~ j;
I ~ .
~ II
~ J ~
~
~ ~ ~
~ "
I ~ e
30 0 30 I i
~-- I u~ ~
-<<~(<~ -<<~ - -
SCALE: 1"=30' fi
~!
- RI"=8'9~ . ill
N E.lNV=8' 0228 ~I . fi
----00. III WZEr:iD f~11 11
mniMINOlIS WAlk EXISTING IRRIGATION m:
-0-0-
EXISTING WA TERMAIN ~I-I- ~~=~
EXISTING SANITARY -)-)--"-)- ii~:
EXISTING STORM -->>-
EXISTING IRR. HEAD .. 811. '"
EXISTING IRR. VALVE ... -~<~ ~
PROPOSED WATERMAlN -1-1-
PROPOSED SANITARY -'-'-t-
ee PROPOSED ClEANOUT oC.o. UJ
RIU=818.66 PROPOSED ELEV x 825.0 z
N/E.lNV=814.76 PROPOSED STORM -- -
............... ))- PROPOSED DRAlNTILE ---------- 5
......... -35 FT 12" w
HOPE . .1.4" cr
STIlH I (48' (R-2680)
RI".822.~
INV-815.95 (N/W)
X
W
-'
PERF'ORA TED DRAIN TILE 4007 0.. z
:::;: ~
0
U 0..
~ w
I ~ (,)
CONSTRUCTION NOTES we.:> <(
Uz Z
go ~
r-Ilt~~ 1) CONTRACTOR SHALL INSTALL EROSION CONTROL V)~ c
DEVISES AS DIRECTED 8Y THE ENGINEER. :J
MN/OOT 3149.2H waJ ~
2' 2) EXCESS MATERIAL SHALL BECOME THE :J (,)
Z z
PROPERTY OF THE CONTRACTOR AND SHALL BE w i5
L FILTER rAEIRIC ~
21f .' ~~_TED ~ DISPOSED OF AT THE CONTRACTORS EXPENSE ~
(,)
3) CONTRACTOR SHALL MAINTAIN POSITIVE J:
0-
US[ DRAIN PIPE W/O PRQTECTM: WRAP AND DRAINAGE AT ALL TIMES ~
ROCI( WITH TRENCH UNEO n.TER FABRIC
4) CONTRACTOR SHALL 8E RESPONSIBLE FOR
& <:lIS COORDINATING THE LOCATING AND RELOCATION
---~ 2-0,' OF ALL SMALL UTILITIES III
." Il4A ___'0 5) ALL DISTURBED LAWN AREAS SHALL BE
RESTORED WITH SOD
12" 90' 6) SOD IN DRAINAGE SWALES SHALL BE PEGGED
,... 7) SILT FENCE & DITCH CHECKS SHALL BE
CORRUGATED POlYETHYLENE PIPE WITH PVCP'P WJTH OR Wl1liOUT PROTECTIVE WRAP INSTALLED AS DIRECTED BY THE ENGINEER
OR WlTHDUT PROTECTIVE WRAP SHEEI NO.