Loading...
HomeMy WebLinkAbout5.A.1. Approve Plans and Specs and Authorize Ad for Bids for 17th Ave Sports (Soccer) Complex, Project No. PR2005-2 S.A. I · CITY OF SHAKOPEE MEMORANDUM To: Mayor and City Council CONSENT Mark McNeill, City Administrator From: Mark Themig, Parks, Recreation, and FacilitiesDirector Meeting Date: July 18, 2006 Subject: 1 ih Avenue Sports (Soccer) Complex Plans and Specifications and Authorize Bidding, Project No. PR2005-2. INTRODUCTION This agenda item seeks approval of the plans and specifications for the 17th Avenue Sports Complex building and authorization to proceed with bidding. BACKGROUND AND DISCUSSION The original design for the 1 ih Avenue Sports Complex support building came in over budget, and City Council rejected the bids. The architect that did the initial design is no longer with BKV, so we had been in some limbofor a period oftime while a new architect was assigned. BKV assigned Victor Pechaty to lead the redesign, and several potential design element changes were presented to the Parks and Recreation Advisory Board at their December 2005 meeting. Based on their feedback, we provided direction to Mr. Pechaty on the function of the building, and asked him to come up with a redesign that would fall within the project budget. The Advisory Board and City Council reviewed and approved the schematic design in March 2006 and ordered plans and specifications. BKV Group, along with assistance from Dale Gade in the Engineering Department and Andrea Weber on our staff has completed the plans and specifications. Select plan sheets are attached. As discussed in March, the materials are commercial quality and vandal resistant. The exterior materials area primarily red brick identical to the brick on the new SPUC pump house along 1 ih Avenue. The roof is a standing seam metal roof. Other materials include painted block, painted metal facades, and laminate plywood accents. All fixtures are commercial grade, and the concession stand design meets Minnesota Department of Health guidelines. Two items that were discussed by the Parks and Recreation Advisory Board but not decided at the time of schematic review until there were further refinements in the design and additional cost estimates were a shade structure and heating. The current design includes the shade structure as a bid alternate but does not provide heating due to the costs for the mechanical systems and insulation. One issue that came up during the plans and specification stage was how to handle site drainage. The site has a large expanse of turf that drains toward the building. During heavy rainfall events, considerable overland drainage occurs. In order to handle the drainage, a stormwater catch basin and storm water piping is needed, which was not anticipated in the schematic design. Cost estimate for this component is $28,000. The total CIP amount for this work is $523,000, which includes building construction and finish work completed outside of the building contract. The following is a break-down of estimated costs: Bid Items Estimate Base building construction, including stormwater improvements $482,530 $28,000 and 5% contin enc Buildin Alternates Alternate #1 - Sun Shade Structure* 8,190 Alternate #2 - Sk Li ht 8,300 Alternate #3 - Benches 3,040 Total Pro.eet Costs** Bid Total Subtotal with Recommended Alternate from above 490,720 SACIWAC Char es 13,000 Picnic Tables and trash cans 10 $800 each 8,000 Finish Site Work, Landsca in , Irri ation 10,000 Total 521,720 *Alternate recommended by PRAB. **Total project costs do not reflect concession equipment and additional site fencing. These items could be funded from the project budget upon completion if funds allow. If not, the Soccer Association would be asked to contribute toward these costs. Substantial completion is planned for April 15, 2007, which would allow contractors to complete any finishing work in the spring. REQUESTED ACTION City Council is asked to move to approve the plans and specifications and authorize bidding for the 17th Avenue Sports Complex Building, Project No. PR2005-2. SYMBOLS KEY I B K V EXIST CURB ROCK GARDEN - G R 0 U P SEE LANDSCAPE EXIST SIDEWALK EXIST SOCCER FIELD Architecture EXIST DRIVE TREES _ BT OWNER Interior Design Nf~ CONCRETE SIDEWALK, SEE CIVIL SHRUBS _ BY OWNER Engineering ~~~~C~~~IIA; STEEL COLUMN - SEE STRUCT Boarman 4 THUS BY ALTERNATE #2 Kroos LIGHT BOLLARDS, SEE ELEG. Vogel BENOl - . BELOkI:"5LAB 4" PVC SLEEVE FOR FUTURE J Group SEE OTL5 I, 2, 3/A11.4; TIE-IN TO EXISTING IRRIGATION. L.OCATI(~ Inc 3 TI-IUS BY ALTERNATE UI ~~I~ ~i-r:~J~~TN~ =~~~~~ r . PICNIC TABLE - BT OWNER SHADE STRUCTURE (SHOWN DASHED) - 222 North Second Street BICTCLE RACK 2 THUS BT ALTERNATE '4. ALSO SEE" TE'16. Mi lis MN 55401 I"" DIA. DRILLED CONe. CAISSON, "". DE nneapo , DRINKING FOUNTAIN r~~ ~~,;g:;'T-C~~,j~"'s"...~~DJ,i.TI Teiephon~: 612.339.3752 J EXISTING TRANSFORMER(S) - EXPANSION ANCHORS, SIZE AND SPACING BT FacslmJle. 612.339.6212 VERIF'r LOCATION(S) WITH SURVEY ~~J; OF~c~~:is~PT{lo A~~ www.bkvgroup.com DETERMINED BY SER AFTER RECEIPT OF J J ~~'~~ON~~~.5 ~T~l~N CONSULTANTS r r ARE APPROXIMATE. ~~ ~~". ~ON-GRADE PROJECT TITLE If r ~r/ ~~~~~o.'" lnH AVENUE m R I I I I r I ~ SPORTS COMPLEX r. r 'r Il>'~j) .....f~. r P' P (\:~:~. .I! BUILDING ) /-~ ~ ~ ~ ~ p j U /1'\ &r'\(\ 1&''\(\ &r'\(\ 1&\<1 ~I SHAKOPEEMN ) 0 ( 0 J J 0 I 0 ( 0 ~ ) 0 U ~v<J r~ (U ~ v<J ~~ Ai 'HEElTOlE ' ~. <<' ", 'P'~ P 1\ ?'11/ ~ I c; '", & r'\(\ 1& ''\(\ I ~ SITE PLAN / "'- - V' "'-r-- 't- - 'r-- 'i- ...At] ~ (U ~ v<J ~ Ai .J!t:I i I - _ ~ /1"'.... "'f---b,-Ibt-~.b. .- 1---- ----r--f------f----- --1--- :/ J - \ F r '- JI I ~ CER1IFICATION \.... ~ l! lheo'ebycertifylhotftiip\an,speciicollon orreportw<n pRIpoted by me orvndermy ! dtect$Vp8f\Ij$IOn OfIdfhQI lam a dJt{ ---Il I ~ I ~ lbz 0 0 , UcensedJ'rafem:>noJ Ndli'ecl vnclet' ---:J ~ 1 V lhelawsoffheStaleofM....nesola. [2J C IF'= 7 I r T \I II c,,,"'.._ Dale ~ II H '"355 , 11_.16 - license Nvmber ---1 11l? '" f ,. L I REVISIONS No. DATe -- -r--r-j- t- - ..+~ f-.- -- 'it- 'iti ir ~. -:"3><< ~ a. ..z-..r ~~ "-. ,,110 :'j<< - q,~.. }.''J I ~ p Ip Ipll pi Ip lip pi Ip I~ DATE ",."'" .J .J .J~r.J J J .J "'AWN'Y cos J CHECKED BY VXP ~ COMMISSION NO. 1536.03 SHEET NUMBER AO.l o 2006 BXY Group ~~ BKV ell of ~ th WI'lUlI Jell BIll I. DO NOt' 9CAl..E THE DIIAWINlt5 FCIt CONSTRUCTION ConcMsic:rnalToilet Room Finish Sdwdllle . . . . 5~U5f=~~n::== miTIS P--; ":. lotil .....""Holt E-I'fl!I'lM.=-~,,", c. C FIn. G.R.O UP n1El)IA,TflT FOR CLARIFICATION. 104 E5S1ONS _ I"lL Cl"U_l EftIl"( l'AINT _I'UI. I'IH. -.., .....,. ""' G,,", _, " 2. CGINTRACTORS SAALL VERIFY ALL DlT"IfN5lClN5 ANP !I'QtY' IlE9IIf I'IlI. Cl"U-1 EPCIKT.......,. 0IlAHl0(.1'ftt. I'lN. ~.I ~4' 80-1 '"'" . EXISTING. cctfDITlONS. ANT Dl5CA.EPfNCJES BETWEEN 1(17 MEN Iln1!! ~ _ .... 0'11_1 EPCIKT _ 0lWGI!_~ I'lN. ""'-I ~4' In GiT'l' _, " Arch,tecture ~:1f~~~~~IOR~.::.cEEDINli Interior Design s. =~~IN~~~:IClteARETO Engineering Boarman Kroos Vogel Group Inc. ...'.... ,..,. ..... MO ABOVE 222 North Second Street "t-.. e'.... "-" .'.... "-" ....... ",'-" 0'_0' I ~... "-0' M1nneapons, MN 55401 ~ """MOABOVE .~ Telephone: 612.339.3752 ~ 2 .;$3 3 Facsimile: 612.339.6212 ~4.1 -'3.1 MI ~ www.bkvgroup.com .... -Ci::::Ci::. ,- _n -, ~ ~ ---:-' r----- -------- ---- -- ---~ r~-?~--------- ---~~.:"'~--fi)------ --~- ~-- --1 E CONSULTANTS 'r I 0 0,..... ..t:b\-, \....0) I & .. I ~ ~~ ~~ e I 1-11-101'- r=..~ ~ I 'r ~ I ?- ~- --- t-'" ~s~- A1I.1. '6'-O'v,. _eo 2'-&" 2'-&" ~1-J:1- 5'-.. ~ ""! I.' . .. s'ro\\'ME~ ,~ /' ~ I : ~ \ / rt\, } ~" op..,.~.. ~ ~.~ J ~ I ~ I ~ - - - - ~'-" 0 &- ~ -n I~ rr:~~ I"'"A - -7\ :~:>{ ~_ I ~ i PROJECT1IllE I rt~lI''''' ~ ~ b A3.1 5 ~::z: - t ~t I ~ ..... -.x- I 2 lnHAVENUE ~ 1 -< ~ ~ ~~ I!r-A ~1 ~ t 6\ ~I rfo \ I 0 0 ~. ,1 I ~ ~ ~ SPORTS COMPLEX . ~ ~ } .." M-' ABOVE1 ~ ~ "__ ,,~ I ~ r 2 \ BUILDING ~~ ; : 0 \" ~ S~E ,0 ~ ~ 80 rr--=\'il ~- ax~-~i: 7i~) -t: ~ ~i3.1J> I ~,-~y A3.1 ;, I 17 II II ~ " ~ A. I ~ Y , _ rrr \ 19I11g11 t"I (') c; I I '.l. ~ 2 SHAKOPEE MN I ( .j " " I ~ I .""""" ""', R'-O' ~-O' -" \.A4 ')1 . I I ~. ~ II II ~ '0'0. . 'r =-" ~ D..~. I _J ""- " ~ ~ SHEET1I1lf AIl.:f L. J ~ f i).,~ . I....." 5ClUD_ACIIGJ .. ,. Ii '" I I ,... ..~. ,~~ 1.b===:!J '"'/ ......~" "1:~' -- - ) I .. ~ FLOOR PLAN "~ ~ ~ 102-8 -- I 10" ~ ~ ---- . ~ fq - ~ I - ~ ~ ;" J ~ r- .. "'-- ~ M"'@-i'-/, ~ I & l II 3: ~ II /...." <~''"'I\'' ! ~, \ ('.L . / ...~OO ~.~ '..3 I ~ FINISH SCHEDULE I I~ in .JAI':-" ~ ~ 1" CAll.21 \. L _,5 li1iiiiiLJ 1-4 ~ .. ~ \ I ..L L____-'- ---4".--------- ----_ ______________ -'r!----~""~-~---~"- ._~_ ~__ __J CERTIACAllON &:. - ~I :iT~=~ _ ~ ~ :"~~=:n~~;:,~ .!::!:... ~~.'" 2'-0" ::~jl~~~r 20'-0. 22".... 2&'..... 3'-0" 3'~&' r-- the IO'ws of the Slole 01 MIr'lnesolo. W NDH no AeW'E \ \ .'-0" HDH no ABOVE 1 2'-0' LVR no ~E IBUILDING 'A"I . A3.1 IBUILDJNG "S"l DovldR.Kroos Date #JJ3S5 LIcense Number REVISIONS No. DATE (t~~ DATE .,:x"" ~ DRAWN BY ellS CHECKED BY V'IP ~ COMMISSION NO. 1536.03 NORTH SHEET NUMBER Q) :::~?<?~,_~.LAN .....-03-A,p-O, A 1. 1 c 2006 BKV Group B KV G R 0 U P Architecture Intertor Design ELEY . IO'~ Engineertng ~~,~ ~_~~ C11U Boarman ......, Kroos ~RMI~ Vogel ~~&.;/. Group ,F.E. ELEV . -r-e" Inc. 222 North Second Street ~ ~EST ELEVATION (J) SOUTH ELEVATION Minneapofts. MN 55401 3 1/&-" 1'-0' 153&-03-AEL lie' . 1'-0' 1,:)3&-03-AEL Telephone: 612.339.3752 FaC$lmDe: 612.339.6212 www.bkvgroup.com AF5-1 CONSULTANTS ~~Et.EC RLDGEt~ ~ q~' PROJECT TITlE . ~ R.~I:' 17TH A VENUE F'~:"~~l'~' SPORTS COMPLEX BUILDING @EAST ELEVATION 1~-03-AEL @NORTH ELEVATION 1~3&-03-AEL 3 lie'. "_0' lie' . 1'-0' SHAKOPEE. MN SHEEfmLE EXTERIOR ELEVATIONS ~~ ~ 1~~.P'V. UGI-IT, SEE ELEe PMLG-l ~ .......1 fLf\'. ""-04" ST!.. COLUMN, SEE b (;0-1 STRLlCT ....., CERTlACATION lherebycerlifyihCltthlsplan,$J)OCl"1C01Ion orrePOrtwas prelXlred by meorundermy d~ect supervfs!onl:ll1d lho/lama 0Av UcernedProllmlonal Architect l,/t'lCIer IhekrwsoftheSklleofMi'lnesolo. @NORTH ELEV (CONCESSION BLDG) @SOUTH ELEV (MEETING/STOR. BLDG) 3 1/&". I' O' 1~3&-03-At.L 3 11&" - 1'-0' . 1!;)~-03-AI;.L Dovk:tR.Kroos Dol. #1135s Llcense Number REVISIONS No. DATE .BL~L~T~ 12~ ~~ ~ J'?eo ~. DATE 07.'20.06 DRAWN BY C" "",1 ""., CHECKED BY v>P NO SWTG-I, PAINTED NO SUTGi-I, PAINTED COMMISSION NO. 1536.03 DRtNr:::INri FOUMTAIN, SEE DRIt<<INt.;, FOUNTAIN, SEE SHEET NUMBER "w< "w< @ EAST ELEV (RESTROOM VESTIBULE) @SOUTH ELEV (RESTROOM VESTIBULE) @"'EST ELEV (RESTROOM VESTIBULE) A3.1 l/fl . 1'-0. . /,,j6-03-At;1. 1/8' _ 1'-0' lSo3b-Q3-AEL 1/8' . )'-0' . ISo3b-D3-At:L o ~ 8KV Group B KV GROUP ""'-0-1 Architecture ~~.$EE Interior Design """""""" Engineering -. D~I. SEE IS./'All.2 ~ I ""-I Boarman PNLG-I Kroos !V... WD-I I"RAM~ Vogel ~ ~ PNLGi-2. coto Group !l ~ RECEPTACLE. SEE Inc. ELECT. " d ~ " . 222 North Second Street MinneapoUs. MN 55401 ROOM - NORTJ.l Telephone: 612.339.3752 1 1oI0MEN'S TOILET ROOM - IoIEST ELEV. ELEV Focsimne: 612.339.6212 q 1/4".. .1'-0. - -I L 1~3io-03-IEL 15~-03-IEL www.bkvgroup.com """'" CONSULTANTS ~ ~ " " ~ " ~ PROJECT TITl~ ~ " ~ ~ 17TH AVENUE J / J SPORTS COMPLEX " / " T...... BUILDING 4 MEN'S TOILET ROOM - EAST @MEN'S TOILET ROOM - IoIEST ELEV. q 1104". 1'-0. - - q 1/4".. 1'-0. .. 1~.36-03-IEL SHAKOPEE. MN SHEET TITLE INTERIOR ELEVATIONS CERTlACAnON I herebycertily lhol lhis pIor\spedicollon OfreportWOSPl"epaed by me or under my d~lsuper.1slon and ttlollom (I duly tk:ensedProfesslonat Arehitect under the lawsoftheSloleol ~nesolo. DavldR.lC1oos Date #11355 L.k:ense Number REVISIONS No. DATE DATE 07.20.06 DRAWN8Y CRS CHECKED BY VXP COMMISSION NO. 1536.03 SHEET NUMBER A9.1 o 2006 BKV Group ~ ~ j; I ~ . ~ II ~ J ~ ~ ~ ~ ~ ~ " I ~ e 30 0 30 I i ~-- I u~ ~ -<<~(<~ -<<~ - - SCALE: 1"=30' fi ~! - RI"=8'9~ . ill N E.lNV=8' 0228 ~I . fi ----00. III WZEr:iD f~11 11 mniMINOlIS WAlk EXISTING IRRIGATION m: -0-0- EXISTING WA TERMAIN ~I-I- ~~=~ EXISTING SANITARY -)-)--"-)- ii~: EXISTING STORM -->>- EXISTING IRR. HEAD .. 811. '" EXISTING IRR. VALVE ... -~<~ ~ PROPOSED WATERMAlN -1-1- PROPOSED SANITARY -'-'-t- ee PROPOSED ClEANOUT oC.o. UJ RIU=818.66 PROPOSED ELEV x 825.0 z N/E.lNV=814.76 PROPOSED STORM -- - ............... ))- PROPOSED DRAlNTILE ---------- 5 ......... -35 FT 12" w HOPE . .1.4" cr STIlH I (48' (R-2680) RI".822.~ INV-815.95 (N/W) X W -' PERF'ORA TED DRAIN TILE 4007 0.. z :::;: ~ 0 U 0.. ~ w I ~ (,) CONSTRUCTION NOTES we.:> <( Uz Z go ~ r-Ilt~~ 1) CONTRACTOR SHALL INSTALL EROSION CONTROL V)~ c DEVISES AS DIRECTED 8Y THE ENGINEER. :J MN/OOT 3149.2H waJ ~ 2' 2) EXCESS MATERIAL SHALL BECOME THE :J (,) Z z PROPERTY OF THE CONTRACTOR AND SHALL BE w i5 L FILTER rAEIRIC ~ 21f .' ~~_TED ~ DISPOSED OF AT THE CONTRACTORS EXPENSE ~ (,) 3) CONTRACTOR SHALL MAINTAIN POSITIVE J: 0- US[ DRAIN PIPE W/O PRQTECTM: WRAP AND DRAINAGE AT ALL TIMES ~ ROCI( WITH TRENCH UNEO n.TER FABRIC 4) CONTRACTOR SHALL 8E RESPONSIBLE FOR & <:lIS COORDINATING THE LOCATING AND RELOCATION ---~ 2-0,' OF ALL SMALL UTILITIES III ." Il4A ___'0 5) ALL DISTURBED LAWN AREAS SHALL BE RESTORED WITH SOD 12" 90' 6) SOD IN DRAINAGE SWALES SHALL BE PEGGED ,... 7) SILT FENCE & DITCH CHECKS SHALL BE CORRUGATED POlYETHYLENE PIPE WITH PVCP'P WJTH OR Wl1liOUT PROTECTIVE WRAP INSTALLED AS DIRECTED BY THE ENGINEER OR WlTHDUT PROTECTIVE WRAP SHEEI NO. C 1