HomeMy WebLinkAbout2. Public Works 2007-2011 CIP
#;2.
CITY OF SHAKOPEE
Memorandum
TO: Mayor and Council
Mark McNeill, City Administrator
FROM: Gregg Voxland, Finance Director
SUBJ: 2007 - 2011 Capital Improvement Plan
DATE: July 16, 2004
Introduction
July 25 is the first work session to review the Capital Improvement
Plan (CIP) for 2007-2011. The CIP is an important document that is
part of the Comprehensive Plan and helps shape and direct the way the
city is to develop.
Background
The first meeting will focus on public works projects. The following
meeting will focus on park projects. For the July 25th meeting, the
projects for storm, sewer and streets will be discussed.
Attached is a listing for the projects for discussion, individual
project sheets and a chart showing the approximate debt service tax
levy for the projects.
Action
Discuss CIP projects and give staff direction.
JW
Gregg Voxland
Finance Director
SHAKOPEE PAVEMENT
MANAGEMENT
SYSTEM
JUL Y, 2006
SHAKOPEE
CO:MMUNITY PRIDE SINCE 1857
,
. City of Shakopee Pavement Management Program
PURPOSE:
This report is to update the Council of the City's pavement condition and for
consideration of a policy to implement a City-Wide Pavement Management Program.
This program is to maintain and upgrade the City's street system as it ages and is utilized
by its residents and property owners. The overall goal of the program is to provide a safe
and usable local transportation system, whereby each street is meeting an acceptable
standard condition and doing so in a cost effective fashion. The specific objectives of the
Pavement Management Program are:
1. Continue to reconstruct streets and utilities that have deteriorated beyond the
point of its useful life.
2. Increase the amount of funding for bituminous overlays of City streets.
Streets can be overlaid at a 1:5 cost ratio to reconstruction of street.
3. Increase the funding for seal coats to preserve the life of pavements as a
pavement management strategy.
4. Replacement of utilities including service lines on street reconstruction
projects which is recommended to be paid at 100% from user fees collected
from monthly utility bills.
5. Consider increasing street assessments from 25% to 30% or more to help fund
Pavement Management Program.
6. Develop an implementation strategy for collector streets and one for local
streets.
7. Utilize State Aid funds for pavement maintenance projects such as seal coats,
overlays and reconstruction of State Aid streets.
For bituminous pavements, a range of maintenance operations are proposed to upgrade
the streets to an acceptable standard over the useful life of the pavement. Development
of the Pavement Management System and maintenance strategies must include a
financing component that allows the City at large, as well as property owners, to absorb
the improvement costs. In the City of Shakopee, the street system represents a major
financial investment of over 120 million dollars. The condition of neighborhood streets
can directly impact property values,' as well as reflecting a ,sense of the Community's
livability.
- 1 -
.
City of Shakopee Pavement Management Program
BACKGROUND:
Shakopee's street system has developed over a period of almost 150 years. The "Old
Shakopee" street system is a grid system and is the area where most of the' street
reconstructions have occurred since 1980. Approximately 45% of the local streets have
been built since 1996 when the T.H. 169 bridge and freeway was constructed.
At present, staff has determined that the 138.1 miles of street could be placed in the
following categories:
. Street Reconstruction - 11 miles
. Overlays - 31 miles
. Seal Coats - 98 miles
At this time, there is a large ,inventory of streets in the seal coat category and these streets
in time will move to the bituminous overlay category.
Current/Evaluation/Maintenance Strategies:
The life cycle of a bituminous pavement is particularly dependent on a series of
maintenance strategies. As a new pavement ages, a pavement can be protected with a
seal coat and restored with an overlay. To be effective, these strategies need to be
applied at proper times.
In conducting street evaluations, pavement conditions can be rated from a scale of 100 to
zero where 100 is brand new. The Pavement Management Program involves scheduling
the maintenance/reconstruction activities, as needed, to maintain the streets to an
acceptable level.
For instance, reconstruction streets are those that are beyond standard maintenance
strategies. Typically, these streets have deteriorated to a point where seal coats or
bituminous overlays are not effective or utilities in the street need replacing or the street
sub grade or street width needs correction. Streets in the reconstruction category can be
patched, for a time, but eventually the condition is such that the, maintenance costs are
quite high and the public is demanding the streets be upgraded. Currently, the City has
an estimated 11 miles of street in the reconstruction category.
Seal coats are an ongoing maintenance operation that has been conducted annually
utilizing the Burnsville Joint Powers Agreement for value pricing. The increased number
of new streets since 1996 is requiring more streets to be seal coated. A seal coat protects
the bituminous surface from weathering and extends the useful life of the pavement. As
the pavement weathers, the surface becomes more brittle and subject to cracking, which
allows water to access the street base accelerating the deterioration process. Studies and
experience dictate seal coats must be reported on an eight (8) schedule to be effective.
- 2-
.
. City of Shakopee Pavement Management Program
Once a pavement starts to show deterioration (cracking) and a seal coat is no longer
effective, an overlay is in order as the next level of maintenance. Overlays are usually
over a 20 year period of the pavement's life. An overlay restores the pavement section
and prolongs its life. If seal coat and overlay programs are properly conducted,
reconstruction of a pavement can be deferred for up to 50 years or more. Overlays
should be an ongoing annual program.
Proper application of these strategies to provide an extended pavement life cycle is
highlighted on the following graph:
MAINTENA'NCE STRATEGIES
x FOR LIFE CYCLE EXTENSION
~ 100 .F / ,;j!
Z
Z 80 ' ~
0
t- 50
0
Z
0 40
U
t- o .. ,~~ ....
Z 20 '''I' . , " .,
w , . ~ ... .... "... . .-. ... .......
:2 . ~ .. . ." . ~ .. -. .'
. , . __.. \.0 'M,' ,.__. ,_ ..:...., ". .", . '.,. .M ...- .....
, , ., .
w .__.. ... _.' ,...f. .
~ 00 20 40 80
Q..
PAVEMENT AGE (YEARS)
lAAlN'TrHAHCf STR..1'r.'fS
- SEAl.COAT AND OVERlAY
_____ ROUTINE WJNTENANCE ONLY
While it may be difficult to achieve up to an 80 year's life cycle, as illustrated, a 40 to 60
Year cycle is reasonable to expect.
- 3 -
. City of Shakopee Pavement Management Program
Street Reconstructions:
Streets reconstructed by the City since 1980 are identified on a map located in the
Appendix. The cost of reconstructing streets to today's standard section, including
reconstruction behind the curb, is approximately $250 to $300/per lineal foot depending
on soil conditions and various street widths.
VARIES 33' - 37' VARIES
"t,"J
"~ <
~"4- 2,0% ~
~ .,..
/ S(o,,,<,
6" 10PSOIL. SEED. ;f{-1-\,
AND MULCH OR SOD 4
(TYPICAL)
1,5" MVWE45035B BllUMINOUS WEARING COURSE (2350)
BllUMINOUS lACK COAT (2357)
2,5" MVNW35035B BITUMINOUS BASE COURSE (2350)
8" AGGREGATE BASE, CL 5 (2211), 100% CRUSHED LIMESTONE
SELECT GRANULAR BORROW (3149)@
SCARIFY AND COMPACT SUBGRADE (2112)
PROGRAM COSTS:
Based on the previous discussion of maintenance strategies, a program cost for each can
be estimated as follows:
SEALCOATING
Based on the 98 miles in the seal coat category and using a repeating 8 year cycle up to
12 miles of City street should be seal coated each year. The cost per square yard for seal
coating in 2006 was $.65/square yard. The annual cost for 2007 should be $160,000,
including some leveling, striping and engineering costs. As new streets are added to the
City's inventory and construction costs rise, the annual budget for seal coating operation
will increase accordingly. For 2006, a $60,000 amount was budgeted for seal coating and
this amount is not enough to keep up with the large number of new streets since 1996. It
should be pointed out that reconstruction streets and overlayed streets will fall into a seal
coating operation and thus will increase the City's inventory in the future.
OVERLAYS
As shown in the Life Cycle Graph, overlays are conducted with a 20 year life expectancy.
The current inventory of streets to be overlaid is 31 miles. To prevent a number of these
- 4-
.
. City of Shakopee Pavement Management Program
streets from falling into the street reconstruction category, it is estimated that the City
should spend approximately $780,000 per year on bituminous overlays. A major reason
for this increase in bituminous overlays is that no overlay projects were done from 1998
to 2003 and the 2004 and 2005 projects were relatively small overlay projects. Again,
costs would rise as the street mileage and construction costs both increase. For
Shakopee, a large number of street miles are fairly new. Since 1996, an average of 6.3
miles of new street per year has been added due to development. As these streets age, the
number of miles of overlays per year should increase. We will see a substantial yearly
increase of streets in the overlay category beginning around 2016.
RECONSTRUCTION
The City of Shakopee has about 11 miles of street in the reconstruction category
consisting of both urban and rural street segments. Many of these streets can be
maintained to function but seal coats/overlays are not a feasible option. Based on
reconstruction costs of $250/1ineal feet, a mile of street reconstruction is $1;320,000.
One mile of "Old Shakopee" streets is approximately 14 blocks of streets, 380 feet long.
It should be pointed out that a reconstruction street is about 5 times more expensive than
a bituminous overlay. A good pavement management strategy is to keep pavements from
getting into the reconstruction as long as possible.
CIP-FINANCING:
In prepanng the 2007-2011 Capital Improvement Program (CIP) for street
reconstructions and overlays, the following assumptions were used:
1. Reconstruct approximately 12-14 blocks of street for the next five years.
2. Spend an average of $780,000 per year for next five years on bituminous
overlays.
3. Assess 25% of the cost for reconstructions and overlays.
4. Use an average of $255,000 per year of State Aid to fund the improvements.
Items for Council to consider in future financing of Pavement Management Program:
1. Fully fund seal coating up to $160,000 per year and out of the Street Division
of the Public Works budget.
2. Do not assess sanitary sewer services similar to SPUC not assessing water
service lines on reconstruction projects.
3. Increase street reconstructions and overlay assessments to 30% ofthe project
costs.
- 5 -
.
. City of Shako pee Pavement Management Program
4. Each development is charged, at the time of final plat, for a future seal coat
based on current year pricing.
The following table summarizes the anticipated debt schedule assuming the Pavement
Management System is implemented as proposed for the purpose of budgeting
bituminous overlays and street reconstruction projects have been combined. Some years,
given street conditions and project flreas, it may make sense to do more overlays and less
reconstructs and vice versa. Also, when budgeting for street improvements, it is
important to look at a 5-years average. Because project areas, conditions and pricing
vary year to year, it is difficult to spend the exact same amount on street projects each
year. One year we may be below the budgeted amount and the next year we may be over
the budgeted amount. The City may want to set-up a street account and commit a set
amount of money per year to that account. This would help account for the yearly
fluxuations in pricing. The table below assumes a 3% inflation factor per year:
TAX LEVY
2007 2008 2009 2010 2011
Seal Coating $160,000 $165,000 $170,000 $175,000 $180,000
Reconstruction! $1,190,000 $1,225,000 $1,262,000 $1,300,000 $1,339,000
Bituminous Overlays
The numbers in the table above were calculated assuming an assessment rate of 25% and
using an average of$255,000 per year of State Aid to fund the improvements.
~~ 94f~
Jeff Weyandt
Public Works Director Assistant City Engineer
ENGRlSPECS-DETAIL-PLATESISHAKOPEEPA VEMENT MANAGEMENTPROGRAM
- 6-
- - ---~ --- - - --- --- - -- - - -----.-.------ ---------- -- --- -- -- --,--,-- -. -, - ---.-----. --.--..---- --- -- ---- - -..-.--.---.-...-.--.--- - - - - -- - -
-- - -- ---- ---------.--
-------.._-.- --- -- ------- ----
. ~ ~
SCOTT COUNTY
"
0 I
oo .
>-
oo
::J
ro
0::
!oJ
f-
Z
<{
0
121H AVE
169
WATERf
CT
I
169 ' SHAKOPEE PAVEMENT HISTORY MAP
J4C-k. 1980-1995 STREET RECONSTRUCTION
SON TOWNSHIP
..""R........... 1996 STREET RECONSTRUCTION
~~ 1998 STREET RECONSTRUCTION
2000 STREET RECONSTRUCTION
F/r.'_""" 2004 STREET RECONSTRUCTION
2005 STREET RECONSTRUCTION
- -- 2006 STREET RECONSTRUCTION
- .
I
I 0
oo
I 1500 0 1500
I ,.. ....-.-- I 12:'j!'"j $1 w
SCALE: 1" = 1500' ~
0 JACKSON
f-
en
>- TOWNSHIP
0::
0{
::E
2004 STREET OVERLAY
30TH ST W 22ND 2005 STREET OVERLAY
)( 2006 STREET OVERLAY
LOUISVILLE
TOWNSHIP ~"n~'=
Elf? " ;, CT
2l!d;u 1h
"
f? il
\ 1";S:)"~.^
- --- -
---'--- -----~ .---.- -
CITY OF SHAKOPEE < MN CIP PROJECTS BY TYPE 2006 BUDGET
A B C D G H I J K
1 Type Project Cost Estimate Funding Source 2007 2008 2009 2010 2011
49 SEWER Annual Cured-in-place Pipe 750,000 Sewer - B 150,000 150,000 150,000 150,000 150,000
50 SEWER East River Dist Sewer Rehabilitation Phase III 4,000,000 Sewer - B 4,000,000
51 SEWER East Shakopee Industrial Sewer 1,075,000 Assess 1,075,000
52 SEWER Area SE-C(Phase 3) 250,000 Sewer - T 250,000
53 SEWER Beckrich Park 500,000 Assess 500,000
54 SEWER Area JT-D 100,000 Sewer - T , 100,000
55 SEWER Sewer Rehabilitation , 400,000 Sewer - B 400,000
56 SEWER Trunk Ext S of Valley ViewlW of CR 83 200,000 Sewer - T 200,000
57 SEWER Trunk Ext S of Valley ViewlW of CR 84 100,000 Assess 100,000
58 SEWER 1st Avenue Sewer Extension 140,000 Assess 140,000
59 SEWER Sewer Extension to Hillwood 250,000 Assess 250,000
60 SEWER CSAH 18 Extension 625,000 Assess 625,000
61 SEWER Total 8,390,000 6,075,000 550,000 590,000 1,025,000 150,000
62 STORM PLSL Channel Improvements 250.000 Storm - B 50.000 50,000 50,000 50,000 50,000
63 STORM PLSL Channel Improvements 811,000 Storm- T 270.000 200,000 165,000 95,000 81,000
64 STORM Shakopee Valley Mkt Place Swale rehab. 160,000 Storm - T 160,000
65 STORM Shenandoah Business Park 92,500 Storm- B 92,500
66 STORM Shenandoah Business Park 92,500 Storm - T 92,500
67 STORM Bekhrich/Stonebrook Drainage Control System 180,000 Storm - B 180,000
68 STORM Blue Lake Watershed Improvements 500,000 Storm - T 250,000 250,000
69 STORM Drainage Control System 100,000 Storm - T 100,000
70 STORM Valley Park 6th Addition Outlet 300,000 Storm - B 300,000
71 STORM Northern Shakopee Outlet 125,000 Storm - B 125,000
72 STORM Harrison Street Pond 100,000 Storm - B 100000
73 STORM O'DowdlThole Control 250,000 Storm - B 250,000
74 STORM O'DowdlThole Overflow Channel 250,000 Storm - B 250,000
75 STORM Total 3,211,000 665,000 1,080,000 340,000 495,000 631,000
76 STREET 2007 Street Reconstruction Program 400,000 SPUC 400,000
77 STREET 2007 Street Reconstruction Program 350,000 Assess 350,000
78 STREET 2007 Street Reconstruction Program 300,000 Sewer - B 300,000
79 STREET 2007 Street Reconstruction Program 150,000 Storm - B . 150,000
80 STREET 2007 Street Reconstruction Program 1,100,000 Tax Levy 1,100,000
81 STREET 2007 Pavement Preservation Program 150,000 Assess 150,000
82 STREET 2007 Pavement Preservation Program 450,000 State Aid 450,000
83 STREET 2007 Pavement Preservation Program 50,000 Storm - B 50,000
84 STREET Railroad Signals - Atwood 50,000 CIF 50,000
85 STREET Railroad Signals - Atwood 150,000 Donations 150,000
86 STREET Bike Trail-Vierling from Miller to CR 16 100,000 CIF 100,000
87 STREET Pike Lake Trail South of CR 16 200,000 CIF 200,000
88 STREET Pike Lake Trail South of CR 16 650,000 Assess 650,000 .
89 STREET CR 101 Bridge Improvements 125,000 CIF 125,000
90 STREET City Hall Parking Lot 125,000 General 125,000
91 STREET Hansen Ave. , 625,000 Assess 625,000
92 STREET Traff Signal CR 79 & 17th Ave 100,000 CIF 100,000
93 STREET Traff Signal CR 79 & 17th Ave , 100,000 Donations 100,000
94 STREET Sehnandoah Business Park 500,000 Assess 500,000
95 STREET 2008 Recon 300,000 SPUC 300,000
96 STREET 2008 Recon 390,000 Assess 390,000
97 STREET 2008 Recon 300,000 Sewer-B 300,000
98 STREET 2008 Recon 150,000 Storm - B 150,000
7/20/20062:45 PM /
< CIP PROJECTS BY TYPE 2006 BUDGET
A B C D G H I J K
1 Type Project Cost Estimate Funding Source 2007 2008 2009 2010 2011
99 STREET 2008 Recon 1,060,000 Tax levy 1,060,000
100 STREET 2008 Pavement Preservation Program 125,000 Assess 125,000
101 STREET 2008 Pavement Preservation Program 375,000 Tax Levy 375,000
102 STREET 2008 Pavement Preservation Program , 60,000 Assess 60,000
103 STREET 2008 Pavement Preservation Program 50,000 Storm - B 50,000
104 STREET 2008 Pavement Preservation Program 190,000 Tax levy 190,000
105 STREET 2008 Pavement Preservation Program 50,000 Assess 50,000
106 STREET 2008 Pavement Preservation Program 80,000 State Aid 80,000
107 STREET 2008 Pavement Preservation Program 80,000 Tax Levy 80,000
108 STREET 4th Ave CR 83 Intersection 115,000 CIF 115,000
109 STREET 4th Ave CR 83 Intersection 100,000 County 100,000
110 STREET 4th Ave CR 83 Intersection 220,000 Assess 220,000 ,
111 STREET Traff Signal CR 79 & Vierling 100,000 CIF 100,000
112 STREET Traff Signal CR 79 & Vierling 100,000 County , 100,000
113 STREET CR15 HWY 169 to 17th Ave 200,000 CIF , 200,000
114 STREET CR15 HWY 169 to 17th Ave 200,000 County, 200,000
115 STREET CR15 HWY 169 to 17th Ave 1,100,000 Assess 1,100,000
116 STREET Valley View Rd from Pike lake Trail to 1/2 mile West 200,000 CIF 200,000
117 STREET Valley View Rd from Pike lake Trailto 1/2 mile West 660,000 Assess 660,000
118 STREET 17th Ave CR 69 to CR 15 460,000 CIF 460,000
119 STREET 17th Ave CR 69 to CR 15 180,000 Assess 180,000
120 STREET 17th Ave CR 69 to CR 15 80,000 Tax levy 80,000
121 STREET 2009 Street Reconstruction 500,000 Assess 500,000
122 STREET 2009 Street Reconstruction 875,000 Tax Levy 875,000 .
123 STREET 2009 Street Reconstruction 525,000 SPUC 525,000
124 STREET 2009 Street Reconstruction 300,000 Sewer. B 300,000
125 STREET 2009 Pavement Preservation Program 125,000 Assess 125,000
126 STREET 2009 Pavement Preservation Program 200,000 State Aid 200,000
127 STREET 2009 Pavement Preservation Program 50,000 Storm - B 50,000
128 STREET 2009 Pavement Preservation Program 125,000 Tax levy , 125,000
129 STREET 2009 Pavement Preservation Program 50,000 Assess 50,000
130 STREET 2009 Pavement Preservation Program 150,000 Tax Levy 150,000
131 STREET CSAH 21 - CSAH 16 to CSAH 18 250,000 CIF 250,000
132 STREET CSAH 21 - CSAH 16 to CSAH 18 250,000 State Aid 250,000
133 STREET CSAH 21-CSA 16 to CSAH 42 150,000 CIF 150,000
134 STREET CSAH 21-CSA 16 to CSAH 42 150,000 State Aid 150,000
135 STREET Valley View West of Sarazin 260,000 CIF 260,000
136 STREET Valley View West of Sarazin 100,000 County 100,000
137 STREET ' Valley View West of Sarazin 640,000 Assess 640,000
138 STREET Valley View Rd from McKenna Rd to 1/4 mile East 200,000 CIF 200,000
139 STREET Valley View Rd from McKenna Rd to 1/4 mile East 660,000 Assess 660,000
140 STREET 12th Ave Widening (Waf CSAH 83) 60,000 CIF . 60,000
141 STREET 12th Ave Widening (W of CSAH 83) 125,000 Assess 125,000
142 STREET Independence Dr 1/8 Mile South of Valley View Rd 93,000 CIF 93,000
143 STREET Independence Dr 1/8 Mile South of Valley View Rd 217,000 Assess 217,000
144 STREET 2010 Street Reconstruction Program 225,000 Assess 225,000
145 STREET 2010 Street Reconstruction Program 675,000 Tax levy 675,000
146 STREET 2010 Pavement Preservation 165,000 Assess 165,000
147 STREET 2010 Pavement Preservation 40,000 Storm - B 40,000
148 STREET 2010 Pavement Preservation 495,000 Tax Levy 495,000
7/20/20062:45 PM c:L
- -----
Debt Tax levies
3,000,000
,
I
,
2,500,000 -.:
- I- I-
2,000,000 - L- - - l- . Building Bonds
1,500,000 . 11- - 1- - - f- ,- - 1- - o Projected Levies
I .2004B GO Fire
1,000,000 - - - - 1- ,- - - - - - ,- - 1- - - l- i- - I- - 1II Adopted Levies
500 000 -- - - - - - - - - 1- - - 1- - - 1- ,- - 1- ,- -
,
o - I T I I I I I I I
R)~ ~ R)~ ~~ ~~ ~~ ~ ~~ a-~ &' ~
~~ f5 ~~ ~<0 ~<0 ~<0 ~<0 ~<0 <f> <f> <f>
CITY OF SHAKOPEE < MN CIP PROJECTS BY TYPE 2006 BUDGET
A B C D G H I J K
1 Type Project Cost Estimate Funding Source 2007 2008 2009 2010 2011
149 STREET 4th Ave Shenandoah to CR 83 500,000 CIF 500,000
150 STREET 4th Ave Shenandoah to CR 83 900,000 Assess . 900,000
151 STREET Vierling Drive CR 69 to Tavlor Street 170,000 State Aid 170,000
152 STREET Vierling Drive CR 69 to Taylor Street 500,000 Assess 500,000
153 STREET Traff Signal at Vierling Dr & CR 69 125,000 CIF 125,000
154 STREET Traff Signal at Vierling Dr & CR 69 75,000 County 75,000
155 STREET McKenna Road Overlay 131,500 State Aid 131,500
156 STREET McKenna Road Overlay , 43,500 Assess 43,500
157 STREET TH 300 Realignment , 400,000 State Aid 400,000
158 STREET TH 300 Realignment 65,000 Assess 65,000
159 STREET TH 300 Reconstruction 200,000 Assess 200,000
160 STREET TH 300 Reconstruction 200,000 Sewer - B 200,000
161 STREET TH 300 Reconstruction 250,000 SPUC 250,000
162 STREET TH 300 Reconstruction 550,000 State Aid 550,000
163 STREET Independence Drive 5/8 miles S opt W. 200,000 CIF 200,000
164 STREET Independence Drive 5/8 miles S opt W. 425,000 Assess 425,000
165 STREET 2011 Street Reconstruction Program 380,000 SPUC 380,000
166 STREET 2011 Street Reconstruction Program 900,000 State Aid 900,000
167 STREET 2011 Street Reconstruction Program 290,000 Assess 290,000
168 STREET 2011 Street Reconstruction Program 100,000 Storm - B 100,000
169 STREET 2011 Street Reconstruction Program. ' 730,000 Tax Levy 730,000
170 STREET 2011 Pavement Preservation 150,000 State Aid 150,000
171 STREET 2011 Pavement Preservation 100,000 Assess 100,000
172 STREET 2011 Pavement Preservation 50,000 Storm - B 50,000
173 STREET 2011 Pavement Preservation 100,000 Tax Levy 100,000
174 STREET Vierling Dr CR 79 - CR 16 250,000 State Aid 250,000
175 STREET Vierling Dr CR 79 - CR 16 130,000 Assess 130,000
176 STREET Vierling Dr CR 79 - CR 16 145,000 Tax Lew 145,000
177 STREET TH 169 Pedestrian Bridges 300,000 CIF 300,000
178 STREET TH 169 Pedestrian Bridges 3,000,000 Donations , 3,000,000
179 STREET Shenandoah Drive Extension 900,000 Assess 900,000
180 STREET Shenandoah Drive Extension 250,000 CIF 250,000
181 STREET Shenandoah Drive Extension 300,000 State Aid 300,000
182 STREET Total 33,065,000 , 5,175,000 7,425,000 6,055,000 6,335,000 8,075,000
7/20/20062:45 PM I
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007-2011
Project, Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Sanitary Sewer Annual Cured-in-Place Pipe Project
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 130,000 130,000 130,000 130,000 130,000
Improvements
Engineering/Admin. 20,000 20,000 20,000 20,000 20,000
Total 150,000 150,000 150,000 150,000 150,000
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk 150,000 150,000 150,000 150,000 150,000
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 150,000 150,000 150,000 150,000 150,000
Description:
Annual cured-in-place pipe project.
Justification:
Necessary to extend the lift of existing sanitary sewer.
Other Comments:
Operatina Costs:
d-
CIP Projects 2007 - 2011+
City of Shako pee Capital Improvement Program 2007-2011
Project Type: Project Title: Total Project Cost:
Sanitary Sewer River District Trunk Sewer $4,000,000
Reconstruction - Phase III
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 3,500,000
Improvements
Engineerin /Admin. 500,000
Total 4,000,000 - - - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base 4,000,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 4,000,000 - - - -
Description:
Reconstruction of the City's River District Trunk Sanitary Sewer Line from Rahr
Malting to Scott Street.
Justification:
The River District Trunk Sanitary Sewer needs reconstruction in order to
maintain the integrity of the system from inflow/infiltration.
Other Comments:
Current system is in need of repair, which leads to inflow and infiltration problems
during river flooding. Existing concrete pipe and manholes are not adequate to
withstand the hydraulic pressure from high river elevations. It may be
advantageous to delay project until Rahr Malting completes their wastewater
treatment plant.
Operatina Costs:
Reduction in inflow/infiltration sewer treatment costs and possible penalties from
E PAlM PCA.
3
CIP Projects 2007 - 2011 +
City of Shakopee, Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Sanitary Sewer East Shakopee Industrial Sewer $1,075,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 875,000
Improvements
En ineerin {Admin. 200,000
Total 1,075,000 - - - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 1,075,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 1,075,000 - - - -
Descriotion:
Extension of sanitary sewer to serve large industrial lots in East Shakopee.
Justification:
The age of existing on-site sewage treatment systems and the size of
developments warrant consideration of sanitary sewer extension.
Other Comments:
Property owners have shown interest in project. Area does have municipal
water, however, MUSA has not been extended to the area. This sewer line is no
longer a trunk sewer with the rerouting of the trunk sewer through the
South bridge development. A lift station will be necessary to serve area.
Operatina Costs:
L{
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Sanitary Sewer Area SE-C (Phase III) $250,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 200,000
Improvements
Engineering/Admin. 50,000
Total 250,000 - - - -
B. Fundin Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk 250,000
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 250,000 - - - -
DescriDtion:
Extension of trunk sewer to serve future development.
Justification:
Sewer extension is part of the City's sanitary sewer plan and is needed in order
for area to develop.
Other Comments:
ODeratina Costs:
5
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Sanitary Sewer Sanitary sewer extension to Beckrich $500,000.00
Park Estates.
A. Ex enditure Items: 2007 2009 2010 2011
land & ROW
Construction 400,000
Improvements
En ineerin IAdmin. 100,000
Total 500,000 - - - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 500,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax lev
Total - - - -
Description:
Sanitary sewer extension to Beckrich Park Estates.
Justification:
Homeowners are requesting sewer service.
Other Comments:
Beckrich Park Estates Association may finance project.
Operatina Costs:
G
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project. Title: Total Project Cost:
Bruce Loney Sanitary Sewer Area JT-D $100,000
A. Expenditure Items: 2008 2009 2010 2011
Land & ROW
Construction 80,000
Improvements
Engineering/Admin. 20,000
Total 100,000 - - - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk 100,000
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - - - -
Description:
Extension of trunk sewer to serve area in MUSA.
Justification:
Sewer extension is part of City's sanitary sewer plan and is needed in order for
area to develop in the recent annexation area.
Other Comments:
Trunk sewer will be extended through developments. Revised Comp Sewer
Plan and Cost Sharing Agreement with Met Council is necessary for sewer to be
extended.
ODeratina Costs:
7
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Sanitary Sewer Sanitary Sewer Rehabilitation $400,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 320,000
Improvements
Engineering/Admin. 80,000
Total - 400,000 - - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base 400,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - 400,000 - - -
Description:
Sanitary sewer replacement/rehabilitation from the Union Pacific Railroad to 4th
Avenue.
Justification:
Necessary to reduce inflow and infiltration.
Other Comments:
OperatinQ Costs:
15
CIP Projects 2007 -2011+
City of Shakopee Capital Improvement Program 2007.2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Sanitary Sewer Trunk Sewer Extension South of $300,000
Valle View Rd. & W. of C.R. 83
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 240,000
Improvements
Engineering/Admin. 60,000
Total . - 300,000 - -
B. FundinSource:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 100,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk 200,000
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - - 300,000 - -
Description:
Extension of trunk sanitary sewer in developing areas south of Valley View Road
and west of County Road 83.
Justification:
Trunk sewer will be needed to serve this area with municipal services.
Other Comments:
Timing depends on MUSA allocation and property owners willing to develop.
Trunk sewer may be installed in conjunction with private developments.
OperatinQ Costs:
q
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007-2011
Project Maraget: Projec:tryp~: Project Title: Total Project Cost:
Bruce Loney Sanitary Sewer 1st Avenue Sewer Ext. (Apgar) $140,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 110,000
Improvements
Engineering/Admin. 30,000
Total - - 140,000 - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 140,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - - 140,000 - -
DescriDtion:
Extension of sanitary sewer to serve an area without municipal sewer along 1 st
Avenue.
Justification:
To replace existing on site systems which may be at the end of their life with
municipal sanitary sewer service.
Other Cornments:
This project needs to be initiated by existing property owners, redevelopment, or
public health hazard concerns.
Operatina Costs:
10
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Sanitary Sewer Sanitary Sewer Extension to Hillwood $250,000
Drive
Ex enditureltems: 2009 2010 2011
Land & ROW
Construction 200,000
Improvements
Engineering/Admin. 50,000
Total - - - 250,000 -
B. Fundin Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 250,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - - - 250,000 -
Description:
Sanitary sewer and water extension to Hillwood Drive. Location of the utilities
may warrant street reconstruction.
Justification:
Other Comments:
Project needs to be petitioned for by residents affected.
Operatina Costs:
1/
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007.2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Sanitary Sewer CSAH 18 Sewer Extension $625,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 500,000
Improvements 125,000
En ineering/Admin.
Total . - . 625,000 .
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk 625,000
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total . - . 625,000 _
tI' Description:
ft-... Extend sanitary sewer to serve the Whispering Oaks development.
.1 Jusllficatlon:
~ To eliminate the existing lift station and eliminate flow into the Savage sewer
system.
Other Comments:
Maintenance trail construction may be included with project which could serve as
a trail along CSAH 18. County may participate in other trail segments.
OperatinQ Costs:
,
Jf)..
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007.2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Storm Sewer PLSL Channel Improvements $1,061,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 256,000 205,000 180,000 116,000 111,000
Improvements
Engineerin /Admin. 64,000 45,000 35,000 29,000 20,000
Total 320,000 250,000 215,000 145,000 131,000
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 50,000 50,000 50,000 50,000 50,000
Storm Drainage Fund-Trunk 270,000 200,000 165,000 95,000 81,000
Tax Lev
Total 320,000 250,000 215,000 145,000 131,000
Description:
Additional capacity and control structures in the Prior Lake/Spring Lake Channel
to handle increased run-off due to development.
Justification:
Existing agreement with Prior Lake/Spring Lake Watershed District (PLSLWD)
requires the City to maintain the channel upon the City utilizing the channel for
urban development. Increased runoff from development will require a larger
channel. This project is for the purchase of right-of-way for future construction of
the improved channel and for a segment of the channel construction and
maintenance to establish a bio-engineered channel.
Other Comments:
Prior Lake/Spring Lake has indicated a willingness to participate in channel
oversizing for its needs. New Joint Powers Agreement is needed for cost
participation. Upgrade of channel can be built in phases to accommodate growth
and needs of PLSLWD, City's of Shako pee and Prior Lake and SMSC.
Operatina Costs:
$50,000 annually for 5 years, then $25,000 annually after channel is fully
established.
13
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Storm Sewer Shakopee Valley Marketplace $160,000
Draina e Swale Rehab.
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 130,000
Improvements
Engineering/Admin. 30,000
Total 160,000 . . - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk 160,000
Tax Lev
Total - - -
Description:
Correct erosion problems in a drainage swale beginning at the C.R. 17 right-of-
way leading to the storm water pond behind Target.
Justification:
To prevent further erosion of swale and its side slopes into the existing pond,
consequently reducing maintenance issues.
Other Comments:
To be in accordance with the NPDES Phase II permit requirements, this project
is necessary.
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Storm Sewer Shenandoah Buisness Park $185,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 150,000
Improvements
En ineerin /Admin. 35,000
Total 185,000 . . . -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 92,500
Storm Drainage Fund-Trunk 92,500
Tax Lev
Total 185,000 . - - -
Description:
Construction of a storm sewer outlet from the Shenandoah Bus. Park (Industrial
sites) to the Minnesota River through Murphy's Landing.
Justification:
A storm sewer outlet is needed to prevent further erosion from occuring now and
to handle the increased volume from industrial development.
Other Comments:
Project is dependent on industrial development proceeding in this area. Will need
coordination with Three Rivers Park District.
Operatina Costs:
IS
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Storm Sewer Beckrich Park Estates/Stonebrooke $180,000
Draina e Control S stem
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW 20,000
Construction 130,000
Improvements
En ineerin /Admin. 30,000
Total . 180,000 - - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 180,000
Storm Drainage Fund-Trunk
Tax Lev
Total - 180,000 - - .
Description:
Construction of a drainage control system within the Beckrich Park and
Stonebrooke Additions. The system will utilize a combination of outlet control
structures and pipe outlets.
Justification:
Developing properties in the area will produce more storm water run-off requiring
outlets to be constructed from an existing wetlands. Ultimately, the outlets will
reduce water running downstream to future developing properties It is
recommended as part of the City's Comprehensive Storm Water Management
Plan.
Other Comments:
Controlled outlets will better manage the storm water discharge rates and more
fully utilize the upstream storage available in existing wetland areas.
Operatina Costs:
10
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Storm Sewer Blue Lake Watershed Improvements $500,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 200,000 200,000
Improvements
En ineerin /Admin. 50,000 50,000
Total . 250,000 . 250,000 -
B. Fundin Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk 250,000 250,000
Tax Lev
Total - 250,000 . 250,000 -
00 Description:
~ Construct drainage facility to provide positive outlet for developing area south at
.... ... CSAH 16 and west of Pike Lake Road.
· Justification:
A trunk drainage system is needed in order for significant development to occur
in the Blue Lake Watershed.
Other Comments:
Coordination is needed between the City and Shakopee Mdewakanton Sioux
Community and Prior Lake - Spring Lake Watershed District. An EAW has been
done to determine the environmental impacts first. Costs of channel may be
shared with Shakopee Mdewakanton Sioux Community if agreement can be
reached.
Operatina Costs:
17
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Storm Sewer Drainage Control System $100,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW 45,000
Construction 40,000
Improvements
Engineering/Admin. 15,000
Total - 100,000 - - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk 100,000
Tax Lev
Total - 100,000 - _ _
Description:
t. Construction of a drainage control system south of C.R. 78. The system will
~... ... utilize a combination of an outlet control structure and a pipe outlet.
Justification:
::i:: Developing properties in the area will produce mora stonn water run-off requiring
outlets to be constructed from existing wetlands. Ultimately, the outlets will
reduce water running downstream to future developing properties It is
recommended as part of the City's Comprehensive Storm Water Management
Plan.
Other Comments:
Controlled outlets will better manage the storm water discharge rates and more
fully utilize the upstream storage available in existing wetlands.
Operatina Costs:
PROJECT LOCATION
J
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Storm Sewer Valley Park 6th Addition Outlet $300,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 250,000
Improvements
Engineering/Admin. 50,000
Total - 300,000 - - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 300,000
Storm Drainage Fund-Trunk
Tax Lev
Total . - . -
Description:
Construction of an outlet for Outlot A of Valley Park 6th Addition
Justification:
Developing properties in the area will produce more storm water run-off requiring
an outlet to be constructed from the existing pond located in Outlot A to North
Star Auto Auction pond.
Other Comments:
Feasibility study may change implementation schedule of this project.
Operatina Costs:
19
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Storm Sewer Northern Shakopee Outlet $125,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 100,000
Improvements
Engineering/Admin. 25,000
Total . - 125,000 - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 125,000
Storm Drainage Fund-Trunk
Tax Lev
Total . - 125,000 . .
Description:
Storm Sewer and Ponding Improvements to meet existing and future
development needs in area west of County Road 83 and south of County Road
101.
Justification:
Upon full development of this area, an improved drainage system will be needed
to prevent flood damage to existing properties.
Other Comments:
Hydraulic study done indicates additional culverts are needed under railroad spur
lines in the Certainteed property. Need Certainteed drainage agreement.
Operatina Costs:
dD
CIP Projects 2007 - 2011 +
City'(jfSfial<(jpe~Ca.pitallmprovement Program 2007 -2011
Project Type: Project Title: Total Project Cost:
Storm Sewer Harrison Street Pond $100,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW 5,000
Construction 80,000
Improvements
Engineering/Admin. 15,000
Total - - . 100,000 -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 100,000
Storm Drainage Fund-Trunk
Tax Lev
Total . - - 100,000 -
Description:
Construction of a pond and outlet structure in lot 8 and lot 9 of the Husman
Addition.
Justification:
The pond and outlet will reduce discharge rates from existing development in to
the Minnesota river and improve water quality.
Other Comments:
A controlled outlet will better manage the storm water discharge rates and more
fully utilize the upstream area available for ponding.
Operatina Costs:
~I
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Storm Sewer O'Dowd - Thole Control Structure $250,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 200,000
Improvements
En ineering/Admin. 50,000
Total - . . . 250,000
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk 250,000
Tax Le
Total . - - . 250,000
Description:
A permanent control structure to regulate flows from Lake O'Dowd and Thole
Lake for better storm water management
Justification:
Potential future development of area and increase flows to lakes may require
permanent structure to establish runout elevation and rate of flow.
Other Comments:
Area would need to be annexed and this may happen beyond 2010. Condition
with DNR and Scott County WMO is required.
Operatina Costs:
PROJECT.LOCATION
~J..
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Storm Sewer O'Dowd - Thole Overflow Channel $250,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 200,000
Improvements
Engineering/Admin. 50,000
Total . . . - 250,000
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 250,000
Storm Drainage Fund-Trunk
Tax Lev
Total - . 250,000
Description:
Improvements to O'DowdlThole overflow channel to handle future development
areas.
Justification:
Increase flows form development require improvements.
Other Comments:
Improvements can be coordinated with development along channel.
Operatina Costs:
613
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2007 Street Reconstruction Program $2,300,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 2,100,000
Improvements
En ineering/Admin. 200,000
Total 2,300,000 - - - .
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify) 400,000 (SPUC)
State Aid
Assessments 350,000
Sanitary Sewer Fund-Base 300,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 150,000
Storm Drainage Fund-Trunk
Tax Lev 1,100,000
Total 2,300,000 - . . -
Description:
Street, Sanitary Sewer, & Watermain reconstruction: Main Street - 5th Avenue
to 10th Avenue 7th Avenue - Spencer Street to Market St.
6th Avenue - Spencer Street to Main Street 8th Avenue - Spencer Street to
Market Street Dakota Street - 3rd Avenue to Milwaukee Road
Justification:
To continue with the rehabilitation of the City's infrastructure in the older sections
of the community.
Other Comments:
SPUC has not determined the extent of the watermain improvements at this time.
Operatina Costs:
PROUE:CTLOCATION.
aLl
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2007 Pavement Preservation Program $650,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 550,000
Improvements
Engineerin /Admin. 100,000
Total 650,000 - . - .
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid 450,000
Assessments 150,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 50,000
Storm Drainage Fund-Trunk
Tax Lev
Total . - -
DescriDtion:
Bituminous milling and overlay of Valley Park Drive and 12th Avenue from C.R.
83 to C.R. 101. Improvement and or redesign of intersections on 12th
AvenueNalley Park DriveNalley Industrial Boulevard South.
Justification:
Continued maintenance of the City's Pavement Preservation Program.
Other Comments:
Intersection of Valley Industrial Blvd. South and Valley Park Drive needs to be
widened to handle semi-truck trailer turning movements. Traffic improvements
may be needed at the intersection of Valley Park Drive and 12th Avenue.
Operatina Costs:
c15
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Railroad Signalization $200,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 160,000
Improvements 40,000
Engineering/Admin.
Total 200,000 - - - -
B. Funding Source:
General Fund
Capital Improvement Fund 50,000
Park Reserve Fund
Grants (specify)
Donations (specify) 150,000 (MN/DOT)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 200,000 - - - .
Description:
At grade railroad crossings at Atwood Street will need crossing signal due to
traffic volumes at this intersection.
Justification:
Traffic volumes of vehicles crossing, increased number of trains and possible
increased speed of trains warrant the signal installation.
Other Comments:
Funding from the State of Minnesota is programmed for this intersection. City
cost is for 10% of signal cost and roadway realigned to place signals.
Operatina Costs:
~~
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Trail Construction Bike Trail - Vierling Dr. from Miller St. $100,000
to CR 16
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 80,000
Improvements
Engineering/Admin. 20,000
Total 100,000 - . - -
B. Fundin Source:
General Fund
Capital Improvement Fund 100,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 100,000 - - . -
Description:
Construction of bituminous trail along Vierling Drive from Miller Street to County
Road 16.
Justification:
Construction of this trail will fill in a gap in the City's trail system.
Other Comments:
It is anticipated that this trail will be constructed within the City's R.O.W. and will
need retaining walls to fit the trail with the existing conditions.
Operating Costs:
J7
CIP Projects 2007- 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Pike Lake Trail South of CR 16 $850,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW 100,000
Construction 600,000
Improvements
Engineerin /Admin. 150,000
Total 850,000 - . - -
B. Funding Source:
General Fund
Capital Improvement Fund 200,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 650,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - . -
Description:
Collector street construction on Pike Lake Trail south of C.R. 16 to City Limits.
Includes sanitary sewer and watermain extension.
Justification:
Collector street needs to be improved to support development and provide
access to developer's properties.
Other Comments:
A portion of Pike Lake Road is in the City of Prior Lake as well as Shakopee.
Operatina Costs:
Ci3
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction C.R.101 Bridge Improvements $125,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 105,000
Improvements
Engineering/Admin. 20,000
Total 125,000 - - - -
B. Funding Source:
General Fund
125,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - - - .
Description:
Bridge enhancements along 1 st Avenue with the County's reconstruction of the
existing bridge over Mill Pond on C.R. 101.
Justification:
Entry way to Downtown area and Council has indicated a desire to enhance
bridge with lighting, abutment treatments, colored concrete and texture, and
ornamental railing.
Other Comments:
Scott County will pay for bridge replacement and City would pay the extra costs
for enhancements to bridge.
Operatina Costs:
PROJECT LOCATION. $1000/yr
0?'1
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction City Hall Parking Lot $125,000
ReconstructionJOverla
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 100,000
Improvements
Engineerin /Admin. 25,000
Total 125,000 - . . -
B. Funding Source:
General Fund 125,000
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 125,000 - . . .
00 Description:
t Bituminous overlay of the City Hall parking lot
Justification:
Existing parking lot needs to be resurfaced.
Other Comments:
Also, in meeting ADA standards, additional work is needed in the median and
concrete sidewalks around the building, which are major cost items.
Operatina Costs:
30
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Hansen Avenue from Crossings Blvd. $625,000
To CSAH 18
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 500,000
Improvements
Engineering/Admin. 125,000
Total 625,000 - . - .
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 625,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 625,000 - - - .
Description:
Extension of Hansen Avenue to CSAH 18 from Crossings Blvd. to serve
Shakopee Crossings East development and improved access to CSAH 18.
Project includes acceleration and deceleration lanes on CSAH 18.
Justification:
Developer would petition the City for a 429 Special Assessment project to
construct Hansen Avenue to improve traffic circulation for commercial area
development.
Other Comments:
Scott County would need to allow access to CSAH 18 in order for project to
proceed.
Operatina Costs:
31
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Traffic Control Signal for C.R. 79 and $200,000
17th Avenue
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 165,000
Improvements
Engineering/Admin. 35,000
Total 200,000 - . - -
B. Funding Source:
General Fund
Capital Improvement Fund 100,000
Park Reserve Fund
Grants (specify)
Donations (specify) 100,000 (County)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 200,000 - - . -
Description:
New traffic control signal at County Road 79 and 17th Avenue intersection.
Justification:
Sufficient traffic movements may warrant the signal system. A warrant study will
need to be done to justify the signal.
Other Comments:
Relocation of High School to the south will change traffic patterns and may justify
signal at this time.
Operatina Costs:
$2,400/year for operating and maintenane costs.
3;t
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2008 Recon $2,200,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 2,000,000
Improvements
Engineering/Admin. 200,000
Total - 2,200,000 . - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify) 300,000 (SPUC)
State Aid
Assessments 390,000
Sanitary Sewer Fund-Base 300,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 150,000
Storm Drainage Fund-Trunk
Tax Lev 1,060,000
Total - 2,200,000 - . .
Description:
Street,sanitary sewer and watermain reconstruction.
Justification:
To continue with the rehabilitation of the City's infrastructure in the older sections
of the. City.
Other Comments:
SPUC has not determined the extent of the watermain improvements.
Operating Costs:
33
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2008 Pavement Preservation $500,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 450,000
Improvements
Engineering/Admin. 50,000
Total . 500,000 - - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 125.000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - - -
Description:
Bituminous overlay. Streets have not been identified.
Justification:
Continuation of City's Pavement Preservation Program to improve paved
roadways.
Other Comments:
Bituminous overlays are much more cost effective than reconstructing
pavements.
Operatina Costs:
3L
CIP Projects 2007 .:. 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2008 Pavement Preservation $300,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 240,000
Improvements
En ineering/Admin. 60,000
Total . 300,000 - - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 60,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 50,000
Storm Drainage Fund-Trunk
Tax Lev 190,000
Total . 300,000 - . -
Description:
Bituminous overlay. 3rd Avenue from CSAH 17 to Spencer Street.
Justification:
Continuation of City's Pavement Preservation Program to improve paved
roadways.
Other Comments:
Bituminous overlays are much more cost effective than reconstructing
pavements. Utilities under 3rd Avenue must be evaluated. Depending on the
condition of the existing utilities, portions of 3rd Avenue may need to be
reconstructed.
Operatina Costs:
35
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2008 Pavement Preservation $210,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 160,000
Improvements
Engineering/Admin. 50,000
Total - 210,000 . - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid 80,000
Assessments 50,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Le 80,000
Total - 210,000 - . -
Description:
Bituminous overlay. Shenandoah Drive, from Hwy. 101 to Eastway Avenue.
Justification:
Continue maintenance of the City's Pavement Preservation Program and
improved storm drainage system for area.
Operatina Costs:
3b
CIP Projects 2007 - 2011+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 4th Ave. and C.R. 83 Intersection $435,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 350,000
Improvements
Engineerin /Admin. 85,000
Total . 435,000 . - -
B. Funding Source:
General Fund
Capital Improvement Fund 115,000
Park Reserve Fund
Grants (specify)
Donations (specify) 100,000 (County)
State Aid
Assessments 220,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total . 435,000 - - -
Description:
This intersection will need improvements such as a right turn lane on 4th Avenue
to C.R. 83 and a possible traffic control signal at this intersection.
Justification:
Continued growth of the industrial area as indicated in the AUAR for Shenandoah
Business Park and Minnesota Valley West will require improvements to the
intersection.
Other Comments:
Signal will need to be justified by traffic warrants. Improvements are dependent
on development activity.
Operatina Costs:
37
CIP Projects2007 - 2011+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Traffic control signal for C.R. 79 and $200,000
Vierlin Dr.
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 165,000
Improvements
En ineering/Admin. 35,000
Total . 200,000 . - .
B. Funding Source:
General Fund
Capital Improvement Fund 100,000
Park Reserve Fund
Grants (specify)
Donations (specify) 100,000 (County)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - - . .
Description:
New traffic control signal at County Road 79 and Vierling intersection.
Justification:
Sufficient traffic movements may warrant the signal system. A warrant study will
need to be done to justify the signal.
Other Comments:
Relocation of High School to the south will change traffic patterns and may justify
signal at this time.
Operatina Costs:
$2,400/year for operating and maintenance costs.
58
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Shenandoah Business Park $500,000
1m rovements
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 400,000
Improvements
En ineerin /Admin. 100,000
Total - 500,000 . - .
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 500,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 500,000 - . .
Description:
Infrastructure for Industrial Property east of Shenandoah Drive and North of
Fourth Avenue.
Justification:
Sanitary sewer, watermain, storm sewer and streets are needed to serve this
development.
Other Comments:
Depends of developer's request for 429 Special Assessment Public
Improvement Project. Developer may want to request assistance from City due
to the subsurface conditions and to allow sanitary sewer and storm sewer lift
stations to develop the site.
Operatina Costs:
PROJECT.LOCATlbN
39
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction CSAH 15- T.H. 169 to 17th Ave. $1,500,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 1,200,000
Improvements
Engineerin /Admin. 300,000
Total . 1,500,000 . - -
B. Funding Source:
General Fund
Capital Improvement Fund 200,000
Park Reserve Fund
Grants (specify)
Donations (specify) 200,000 (County)
State Aid
Assessments 1.100.000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - . . .
Description:
County road expanded to four lanes to meet growing traffic due to commercial
development along CSAH 15.
Justification:
County road needs to be upgraded to provide for increased traffic due to future
commercial development.
Other Comments:
Dependent upon rate of development in the area and County approval.
Operatina Costs:
40
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Valley View Road from Pike Lake $860,000
Road to 1/2 mile W.
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 660,000
Improvements
En ineerin /Admin. 200,000
Total - 860,000 . - -
B. Funding Source:
General Fund
Capital (mprovement Fund 200,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 660,000
Sanitary Sewer Fund-Base ,
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total . 860,000 . - -
Description:
Collector street construction on Valley View Road, from Pike Lake Road to 1/2
mile west.
Justification:
Collector street should be extendeded to provide access to developing
properties.
Other Comments:
Operatina Costs:
PROJECT LOCATION
41
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007.2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 17th Avenue, from C.R. 69 to CSAH $2,300,000
15
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 1,900,000
Improvements
En ineering/Admin. 400,000
Total . 2,300,000 . - .
B. Fundin Source:
General Fund
Capital Improvement Fund 460,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 1,840,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - - .
Description:
Extension of 17th Avenue from County Rd 69 to CSAH 15
Justification:
Development of this area may warrant the extension of 17th Avenue. Council
recently annexed 340 acres in this area.
Other Comments:
If determined to be a County road, then the County participates in cost of project.
Operating Costs:
'-I:J-
CIP Projects 2003- 2008+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2009 Street Reconstruction Program $2,200,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 2,000,000
Improvements
Engineering/Admin. 200,000
Total . - 2,200,000 - -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify) 525,000 (SPUC)
State Aid
Assessments 500,000
Sanitary Sewer Fund-Base 300,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev 875,000
Total 2,200,000 - -
Description:
Street, sanitary sewer & watermain reconstruction. Pierce Street, from 6th
Avenue to 10th Avenue. Clay Street, from Pierce Street to south of 10th Avenue.
Spencer Street, from 10th Avenue to Shakopee Avenue. Additional streets have
not been determined.
Justification:
To continue with the rehabilitation of the City's infrastructure in the older sections
of the community.
Other Comments:
SPUC has not determined the extent of the watermain improvements.
Operatina Costs:
4~
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2009 Pavement Preservation $500,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 420,000
Improvements
Engineering/Admin. 80,000
Total - - 500,000 - .
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid 200,000
Assessments 125,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 50,000
Storm Drainage Fund-Trunk
Tax Lev 125,000
Total . - 500,000 . .
Description:
Bituminous mill and overlay of Boilling Springs Road from Stagecoach Road to
900' north of Preservation Trail and Stagecoach Road from Preserve Trail to
13th Avenue.
Justification:
Continue maintenance of the City's Pavement Preservation Program and
improved storm drainage system for area.
Other Comments:
OperatinQ Costs:
PROJECT LOCATION
~J
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2009 Pavement Preservation Program $200,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 170,000
Improvements
En ineering/Admin. 30,000
Total . - 200,000 . .
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 50,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev 150,000
Total - . 200,000 . -
Description:
Bituminous mill and overlay of Highway 101 frontage roads.
Justification:
Continue maintenance of the City's Pavement Preservation Program and
improved storm drainage system for area.
Other Comments:
Operatina Costs:
45
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction CSAH 21 - CSAH 16 to CSAH 18 $6,100,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 5,100,000
Improvements
Engineering/Admin. 1,000,000
Total . . 6,100,000 - .
B. Fundin Source:
General Fund
Capital Improvement Fund 250,000
Park Reserve Fund
Grants (specify)
Donations (specify) (County)
State Aid 250,000
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 6,100,000 - -
Description:
Extension of CSAH 21 from CSAH 16 to CSAH 18. \
Justification:
Scott County traffic will warrant the construction of CSAH 21.
Other Comments:
City costs will be for bituminous trail, permanent signal, storm sewer, and curb &
gutter. Scott County has received Federal Grants for 2009 construction.
Operatina Costs:
PROJECT LOCATION
Lfro
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction CSAH 21 - CSAH 16 to CSAH 42 $6,100,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 5,100,000
Improvements
En ineering/Admin. 1,000,000
Total . . 6,100,000 . .
B. Fundin Source:
General Fund
Capital Improvement Fund . 150,000
Park Reserve Fund
Grants (specify)
Donations (specify) jut (County)
State Aid 150,000
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - - 6,100,000 - -
Description:
Extension of CSAH 21 from CSAH 16 to CSAH 42.
Justification:
Scott County traffic will warrant the construction of CSAH 21.
Other Comments:
City costs will be for bituminous trail, permanent signal, storm sewer and curb &
gutter.
Operatina Costs:
4'7
CIP Projects 2007 - 2011 +
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Extension of Valley View & Control $1,000,000
Si nal at CSAH 17 & Valle View
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 800,000
Improvements
En ineering/Admin. 200,000
Total - . 1,000,000 - .
B. Funding Source:
General Fund
Capital Improvement Fund 260,000
Park Reserve Fund
Grants (specify)
Donations (specify) 100,000 (County)
State Aid
Assessments 640,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 1,000,000 . .
Description:
Extension of Valley View Road to Sarazin Street and construction of a new traffic
control signal at the Valley View Road and CSAH 17 intersection.
Justification:
Growth in the area and traffic will warrant construction of this roadway. Sufficient
traffic movements may warrant the signal system. A warrant study will need to
be done to justify the signal.
Other Comments:
Will need to coordinate the project with the. County.
Operating Costs:
PROJECT LOCATION
L18
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Valley View Road from McKenna Rd. $860,000
to 1/2 Mile E;
A. Ex enditure Items: 2007 2008 2009 2010 2011
land & ROW
Construction 660,000
Improvements
Engineering/Admin. 200,000
Total . - 860,000 _ .
B. Funding Source:
General Fund
Capital Improvement Fund 200,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 660,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total . - 860,000 _ _
'of Description:
.I' Collector street construction on Valley View Road, from McKenna Road to 1/2
~. .. mile east.
... ... Justification:
!~~~~~~ Collector street needs to be installed to provide access to develope~s properties.
Other Comments:
Project is dependent on development proposals in this area.
Operatina Costs:
41
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 12th Ave. Widening (W. of CSAH 83) $185,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 150,000
Improvements
Engineering/Admin. 35,000
Total . . 185,000 . .
B. Funding Source:
General Fund
Capital Improvement Fund 60,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 125,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 185,000 - -
Description:
Collector street construction on 12th Avenue for a 1/4 mile to widen 12th Avenue
to handle future traffic for future racino.
Justification:
Collector street needs to be widened to handle the additional traffic.
Other Comments:
Dependent upon Canterbury Park development in this area and State approval of
racino. State has indicated in their proposal to provide Shakopee with funds.
Operatina Costs:
PROJECT LOCATION
50
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007.2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Independence Dr. 1/8 Mile South of $310,000
Valle View Rd.
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 250,000
Improvements
Engineering/Admin. 60,000
Total - . 310,000 - -
B. Fundin Source:
General Fund
Capital Improvement Fund 93,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 217,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base .
Storm Drainage Fund-Trunk
Tax Lev
Total . - 310,000 . .
Description:
Collector street construction on Independence Drive for a 1/8 mile south of Valley
View Road. Includes sanitary sewer and watermain extensions.
Justification:
Collector street needs to be installed to provide access to developer's properties
south of Valley View Road.
Other Comments:
Project is very much dependent on development.
OperatinQ Costs:
51
CIP Projects 2003 - 2008+
City of Shakopee CapitallmprovemenfProgram 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2010 Pavement Preservation Program $700,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 600,000
Improvements
Engineering/Admin. 100,000.
Total . - . 700,000 .
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (speCify)
Donations (specify)
State Aid
Assessments 165,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 40,000
Storm Drainage Fund-Trunk
Tax Lev 495,000
Total - . - 700,000 .
Description:
Bituminous overlay. Streets have not been determined.
Justification:
Continue maintenance of the City's Pavement Preservation Program and
improved storm drainage system for area.
Other Comments:
Operatina Costs:
5CJ-
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007.2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2010 Street Reconstruction $900,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 675,000
Improvements
Engineering/Admin. 225,000
Total . - . 900,000 -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 225,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev 675,000
Total . . - 900,000 -
Description:
Bituminous overlay/reconstruction for Norton Drive, Sycamore Circle and
Mulberry Circle in Derview Acres and streets in Eaglewood.
Justification:
To rehabilitate bituminous street pavements that have severely deteriorated or in
need of resurfacing.
Other Comments:
Operatina Costs:
53
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 4th Ave., Shenandoah Drive to C.R. $1,400,000
83
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 1,120,000
Improvements
En ineering/Admin. 280,000
Total . - . 1,400,000 .
B. Funding Source:
General Fund
Capital Improvement Fund 500,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 900,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total . . . 1,400,000 .
Description:
Reconstruct 4th Avenue to a three lane road, from Shenandoah Drive to C.R. 83.
Justification:
AUAR for Shenandoah Business Park and OPUS Park indicates traffic levels
from development may warrant a three lane roadway.
Other Comments:
Project is dependent on development and traffic levels.
Operatina Costs:
PROJECT LOCATION
5"
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Vierling Drive - C.R. 69 to Taylor St. $670,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW 100,000
Construction 450,000
Improvements
En ineerin /Admin. 120,000
Total - - . 670,000 -
B. Fundin Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid 170,000
Assessments 500,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total - . - 670,000 -
Description:
The construction of street, utility, sidewalk and trail system from County Road 69
to Taylor Street.
Justification:
Vierling Drive completion is needed to provide access to commercial property
south of Shakopee Town Square and North of the Shakopee By-Pass while
completing this east-west collector system.
Other Comments:
This project is dependent on a commercial development proposal adjacent to this
street.
Operatina Costs:
55
CIP Projects 2003 .,. 2008+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Traffic Control Signal at Vierling $200,000
Drive and C.R. 69
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 175,000
Improvements
Engineering/Admin. 25,000
Total - . . 200,000 .
B. Fundin Source:
General Fund
Capital Improvement Fund 125,000
Park Reserve Fund
Grants (specify)
Donations (specify) 75,000 (County)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total . - - 200,000 .
Description:
New traffic control signal at Vierling Drive and County Road 69 intersection.
Justification:
Sufficient traffic movements may warrant the signal system. A warrant study will
. need to be done to justify the signal. Revelopment of commercial district is
needed to generate traffic for signal system.
Other Comments:
Will need to coordinate funding with County.
Operatina Costs:
PROJECT LOCATION $2000/year for power
5~
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction McKenna Road Bituminous Overlay $175,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 150,000
Improvements
En ineerin Admin. 25,000
Total - . - 175,000 .
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid 131,500
Assessments 43,500
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Le
Total - - - 175,000 -
Description:
Bituminous overlay to preserve existing pavement and to strengthen pavement to
State Aid Standards.
Justification:
McKenna Road was paved in 1997 and needs bituminous overlay for
preservation.
Other Comments:
SMSC may contribute additional funds for project as their property abouts a
majority of the road segment.
Operatinn Costs:
PROJECr.LOCATION
S1
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction TH 300 Realignment $465,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 375,000
Improvements
Engineerin /Admin. 90,000
Total . - - 465,000 .
B. Fundin Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify) 400,000 (State Turnback Funds)
State Aid
Assessments 65,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total . 465,000 .
Description:
TH 300 realignment of intersection and reconstruction of street to 10th Ave. due
to redevelopment of mall.
Justification:
TH 300 reconstruction will provide a safer intersection and expansion of mall will
require better traffic circulation. Scheduling depends upon plans of Shakopee
Town Square; turnback funds can be utilized by 2013.
Other Comments:
TH 300 has been turned back to the City and State turn back funds can be utilized
for the reconstruction of the street. In order to apply for State turnback funds, the
City will need to prepare plans for the improvements listed. The State has
programmed $300,000 for the City towards this project however, the availability
of these funds is not guaranteed.
Operatina Costs:
58
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction TH300 Reconstruction $1,200,000
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 1,000,000
Improvements
En ineerin /Admin. 200,000
Total - . . 1,200,000 -
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify) 250,000 (SPUC)
State Aid 550,000 (State Turnback Funds)
Assessments 200,000
Sanitary Sewer Fund-Base 200,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total . - ~ 1,200,000 ~
Description:
T.H. 300 - 10th Avenue to Adams Street
Justification:
To continue with the rehabilitation of the City's infrastructure in the older sections
of the community.
Other Comments:
City does qualify for State Turnback funds for improving Old T.H. 300, which has
been turnbacked to the City.
Operatina Costs:
5~
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Independence Drive, 5/8 Mile South $625,000
of Valle View Road
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 500,000
Improvements
Engineering/Admin. 125,000
Total . . - 625,000 -
B. Funding Source:
General Fund
Capital Improvement Fund 200,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments 425,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Le
Total - 625,000 .
Description:
Collector street construction on Independence Drive for 5/8 mile south of Valley
View Road. Includes sanitary sewer and watermain extension.
Justification:
Collector street needs to be installed to provide access to adjacent properties
along Independence Drive.
Other Comments:
Project is dependant on properties developing.
Operatina Costs:
(b0
CIP Projects 2003- 2008+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2011 Street Reconstruction Program $2,400,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 2,200,000
Improvements
Engineerin /Admin. 200,000
Total . . . - 2,400,000
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify) 380,000 (SPUC)
State Aid
Assessments 900,000
Sanitary Sewer Fund-Base 290,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 100,000
Storm Drainage Fund-Trunk
Tax Le 730,000
Total - - . - 2,400,000
Description:
Street, Sanitary Sewer, Storm Sewer, and watermain reconstruction: Bluff
Avenue - Main Street to Marschall Road Main Street, Minnesota Street,
Prairie Street - Bluff Street to 1stAvenue Dakota Street - Bluff Avenue to 2nd
Ave and 4th Ave to Milwaukee Manor Naumkeag Street - 1st Avenue to Bluff
Street Fillmore Street - Huber Park to 1st Avenue Fillmore Street - 1 st
Avenue to Alley Alley - Spencer Street to Main Street Levee Drive -
Atwood Street to Holmes Street
Justification:
To continue with the rehabilitation of the City's infrastructure in the older sections
of the community.
Other Comments:
Reconstruction of streets should be done in conjunction with redevelopment off
the area. SPUC has not determined the extent of the watermain improvements.
Operatina Costs:
~\
CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction 2011 Pavement Preservation $400,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 330,000
Improvements
Engineering/Admin. 70,000
Total . . . . 400,000
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid 150,000
Assessments 100,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base 50,000
Storm Drainage Fund-Trunk
Tax Lev 100,000
Total . . 400,000
Description:
Bituminous Overlay. Vierling Drive, from C.R. 79 to CSAH 16.
Justification:
Continuation of the City's Pavement Preservation Program to improve paved
roadways.
Other Comments:
Bituminous overlays are much more cost effective than reconstructing
pavements.
Operatina Costs:
~d-
~ CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007.2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Vierling Drive from C.R. 79 to CSAH $525,000
16
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW 425,000
Construction
Improvements
En ineerin /Admin. 100,000
Total - - - - 525,000
B. Fundin Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid 250,000
Assessments 130,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev 145,000
Total - - . . 525,000
Description:
Bituminous Overlay. Vierling Drive, from C.R. 79 to CSAH 16.
Justification:
Continuation of the City's Pavement Preservation Program to improve paved
roadways.
Other Comments:
Bituminous overlays are much more cost effective than reconstructing
pavements.
Operatina Costs:
<oS
~ CIP Projects 2003 -2008+
City of Shakopee Capital Improvement Program 2007-2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction T.H.169 Pedestrian Bridges $3,300,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 3,000,000
Improvements
Engineering/Admin. 300,000
Total - - - . 3,300,000
B. Funding Source:
General Fund
Capital Improvement Fund 300,000
Park Reserve Fund
Grants (specify)
Donations (specify) 3,000,000
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Le
Total - . . - 3,300,000
Description:
Bridges at C.R. 77 and C. R. 15 are not wide enough to handle
pedestrian/bicycles. Additional pedestrian bridge east of C.R. 83 over T.H. 169
along PLSLWD channel is needed to complete trail connections. Project is to
widen existing bridges or build new pedestrian bridges utilizing Federal Aid
Highway Funds.
Justification:
For pedestrians or bicyclists to cross T.H. 169. Improvements are needed
especially with the growth of development.
Other Comments:
Coordination meetings are needed with Mn/DOT and Scott County for this
project to obtain funding a project is dependent upon receiving Federal funds.
Operatina Costs:
(OL\
---
~ CIP Projects 2003 - 2008+
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Shenandoah Drive Extension $1,450,000
A. Ex enditure Items: 2007 2008 2009 2010 2011
Land & ROW 200,000
Construction 1,000,000
Improvements
Engineerin /Admin. 250,000
Total . - - . 1,450,000
B. Fundin Source:
General Fund
Capital Improvement Fund 250,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid 300,000
Assessments 900,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total . . . . 1,450,000
Description:
Shenandoah Drive extension from Eastway Avenue to CSAH 16.
Justification:
This roadway would serve as a local collector and provide access to nearby
property. This project is very much developer driven.
Other Comments:
Construction of this roadway may be accelerated if racino is built.
Operatina Costs:
\05