HomeMy WebLinkAbout5.C.2. Preliminary and Final Plat for Kristal Estates for property south of Hillwood Dr east of CSAH 79-Res. No. 6459
s.c. d-I
CITY OF SHAKOPEE CONSENT
Memorandum
CASE LOG NO.: 06-060
TO: Mayor and City Council
Mark McNeill, City Administrator
FROM: Julie Klima, Planner II
SUBJECT: Preliminary and Final Plat of Krista I Estates
MEETING DATE: July 18, 2006
REVIEW PERIOD: May I 1 - September 8, 2006
INTRODUCTION
CJM Properties submitted an application for preliminary and final plat approval of property located south
of Hillwood Drive and east of 79. The plat, as currently proposed, contemplates the creation of six (6)
single family residential lots on approximately 4.5 acr~s. The proposed lots will have frontage on a cul-
de-sac extending into the project..
PLANNING COMMISSION RECOMMENDATION
The Planning Commission reviewed the preliminary plat at its July 6, 2006 meeting, and voted to
recommend approval of the preliminary plat application, with conditions. A copy of the staff report to the
Planning Commission has been attached for the Council's reference.
ALTERNATIVES
1. Approve Resolution No. 6459, a resolution approving the Preliminary and Final Plat for Kristal
Estates, subject to the conditions presented.
2. Approve Resolution No. 6459, a resolution approving the Preliminary and Final Plat for Kristal
Estates, subject to revised conditions.
3. Do not approve the preliminary and final plat and direct staffto prepare a resolution consistent
with the direction of the Council for action at the Council's next meeting.
4. Table the matter and request additional information from staff and/or the applicant, provided the
applicant grants an extension ofthis application.
VISIONING RELATIONSHIP
This action supports:
Goal D: "Vibrant, resilient and stable"
ACTION REQUESTED
Offer a motion to approve Resolution No. 6459, a resolution approving the Preliminary and Final Plat for
Kristal Estates, subject to the conditions presented, and move its adoption.
.
h:\cc\2006\07-18\ppkristaI esates 06060.doc
1
RESOLUTION NO. 6459
A RESOLUTION OF THE CITY OF SHAKOPEE, MINNESOTA APPROVING THE
PRELIMINARY AND FINAL PLAT OF KRlSTAL ESTATES
WHEREAS, CJM Properties, LLC , applicant and property owner, has made application for
preliminary and final plat approval of Krista I Estates; and
WHEREAS, the subject property is legally described as:
Lot 1, Block 1, Beckrich Park Estates, Scott County, Minnesota; and
. WHEREAS, on July 6,2006, the Planning Commission recommended approval of the proposed
preliminary plat with conditions; and
WHEREAS, on July 18, 2006, the City Council reviewed the proposed preliminary and final
plat.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Shako pee,
Minnesota that the preliminary and final plat of Krista I Estates is hereby approved subject to the
following conditions:
I. The following procedural actions must be completed prior to the release of the
Final Plat for recording:
A. Approval of title by the City Attorney.
B. Execution of a Developer's Agreement, which shall include provisions for
security for public improvements within the plat and the engineering review
fees, and any other fees as required by the City's adopted fee schedule.
1. Street lighting to be installed in accordance with the requirements of
the.Shakopee Public Utilities Commission.
2. Electrical system to be installed in accordance with the requirements
of the Shakopee Public Utilities Commission.
3. Water system to be installed in accordance with the requirements of
the Shakopee Public Utilities Commission.
4. Street construction and sanitary and storm sewer installation shall be in
accordance with the specifications and requirements of the City of
Shakopee.
5. The developer shall be responsible for'payment of Trunk Storm Water
Charges, Trunk Sanitary Sewer Charges, Trunk Storm Water Storage
and Treatment Charges, security for the public improvements,
engineering review fees, and other fees as required by the City's most
recent adopted Fee Schedule.
6. Provide electronic (Auto CAD) files of the Final Plat and all record
drawings to the engineering department.
7. Additional right-of-way, in the form of equidistant chamfers 25 feet in
dimension, shall be provided at the intersection of Kristal Court and
County Road 79 (Townline Avenue).
2
8. Minimum drainage and utility easements for sanitary sewer and storm
sewer in non-paved areas shall be provided at one to one and half ratio,
depth vs. width. The easements shaH be centered along the utility
alignment.
9. Easements shaIl be shown on the Final Plat as approved by the City
Engineer. They shaIl include, but not be limited to, the foIlowing:
a) Provide a minimum of 42 feet of drainage and utility easement,
centered on the proposed sanitary sewer, between Lots 5 and 6,
Block 1.
b) Provide a minimum of 15 feet of drainage and utility easement
adjacent to the County Road 79 (Townline Avenue) right-of-
way.
10. Park dedication requirements shaIl be met by providing cash in lieu of
land dedication. Park dedication fees in the amount required by the
City Code and adopted City fee schedule shaIl be paid prior to the
recording of the final plat. If any portion of the property is being
platted as outlots to accommodate a phased development, the park
dedication fees for each future phase shaIl be based on the fees in
effect at the time of final plat approval for those outlots and shall be
paid before the final plat for those outlots is recorded.
11. The minimum right-of-way dedication for County Road 79 shaIl be 60
feet from centerline.
12. The proposed road access onto CR 79 shaIl require a right turn lane
and bypass lane to be constructed on CR 79.
II. The following items shall be completed prior to the approval of a grading permit
and/or a street/utility plan:
A. No public improvements shaIl be constructed until the City Engineer and the
Shakopee Public Utility Commission (SPUC) approve the Final Construction
Plans and Specifications.
B. The applicant shaIl obtain the necessary Scott County permits/approvals
(access, right-of-way, drainage, etc.).
C. The applicant shall obtain a NPDES permit prior to any land disturbing
activity. A copy of this permit shaIl be provided to the City.
D. The applicant shall work with City staffto extend sanitary sewer to the
remaining lots of Beckrich Park Estates lying north of Barrington Drive.
E. The applicant shaIl work with City Staff to provide an acceptable storm water
systems design to prevent erosion/scouring of the County Road 79 (Townline
Avenue) storm water system. .
F. The storm water management plan and calculations haIl be approved by the
City Engineer.
G. The applicant is responsible for preserving all trees indicated as saved on the
plans. If, as a result of mass grading, any of these trees are determined to be
wounded sufficiently to be considered dead or dying by the Natural Resource
Specialist, the developer wiIl be required to replace the tree(s) according to
the Woodland and Tree Management Ordinance.
3
H. Tree protection fence for mass grading is to remain in place the duration of the
land disturbing activities, including the building of residential homes.
1. Silt fence and/or tree protection fence shall not be installed within delineated
wetland.
J. The applicant shall install silt fence along the delineated wetland edge to
prevent impacts to the wetland during construction.
K. Silt fence and/or tree protection fence is to be removed following
establishment of vegetation as determined by an inspection by the Natural
Resource Specialist or other City staff.
III. The following items shall be completed simultaneous to the recording of the
Final Plat:
A. Simultaneous to the recording of the plat, a deed restriction shall be recorded
on all drainage and utility easements as designated by the City of Shakopee.
They shall include, but not be limited to, the following:
1. The drainage and utility easement adjacent to the West property line of
Lot 1, Block 1.
2. The drainage and utility easement adjacent to the South property line
of Lot 4, Block 1.
3. The drainage and utility easements adjacent to the North, Southeast,
South and West property lines of Lot 5, Block 1.
4. The drainage and utility easements adjacent to the East, South, and
West property lines of Lot 6, Block 1.
IV. Following approval and recording of the final plat, the following conditions shall
apply:
A. Building construction, sewer, water service, fire protection and access will be
reviewed for code compliance at the time of building permit application(s).
B. The developer and/or their assigns shall be responsible for any required or
desired noise or dust mitigation measures.
C. The applicant shall plant tree replacement species consistent with the 2006
Tree Planting Guidelines.
D. The applicant shall seed the proposed storm pond with a native wetland seed
mixture and erosion control blanket be place four feet either side of the
normal water level and around outlets to prevent erosion and sediment
deposits from discharging to downstream waterbodies.
E. No landscaping, ponding, berming, or signage shall be permitted within the
County right-of-way.
F. Any existing driveways/field accesses to this property shall be completely
removed from the County right-of-way and graded to match the existing ditch.
G. Any work within the County right-of-way shall require a permit.
H. If County Road 79 is ever proposed to be a divided roadway in the future, it is
very likely that road access to County Road 79 will be modified to a right
in/right out only.
1. Temporary street signs shall be installed prior to issuance of any building permits.
4
Adopted in regular session of the City Council of the City of Shakopee, Minnesota,
held the _ day of , 2006.
Mayor of the City of Shako pee
Attest:
Judith S.Cox, City Clerk
5
*4
CITY OF SHAKO PEE
Memorandum
CASE NO.: 06-060
TO: Shakopee Planning Commission
FROM: Julie Klima, Planner II
SUBJECT: Preliminary Plat of Krista I Estates
MEETING DATE: July 6, 2006
REVIEW PERIOD: May 11 - September 8, 2006
SITE INFORMATION:
Applicant: CJM Properties, LLC
Property Owner: CJM Properties, LLC
Location: North of Barrington Drive. East of CSAH 79 and south of Hill wood Drive
Existing Zoning: Urban Residential (R-lB) Zone
Adjacent Zoning: North: Rural Residential (RR) Zone
South: Rural Residential (RR) Zone Avenue/Urban Residential (R-lB)
West: Jackson Township
East: Rural Residential (RR) Zone
Compo Plan: Single Family Residential
Acreage: Approximately 4.5 acres
MUSA: The site is within the MUSA boundary.
DISCUSSION
CJM Properties has submitted an application for preliminary plat approval of Krista I Estates.
Please see Exhibits A and B for location and the proposed site plan. The subject site is
approximately 4.5 acres. The applicant is proposing the creation of 6 single family residential
lots on the property.
On June 22, the Planning Commission continued the public hearing in order to allow the
Environmental Advisory Committee (EAC) and .Park and Recreation Advisory Board (PRAB) to
review and provide comment on the application. The comments from these boards have. been
incorporated into the proposed conditions of approval.
Other departments and agencies have reviewed the application and have provided comments.
Please find attached copies of the comments received from the Engineering Department,
Shakopee Public Utilities, the Natural Resources Specialist, and Scott County Highway
Department. Appropriate comments from these agencies have been incorporated into the draft
conditions of approval.
The Scott County Highway Department and Shakopee Public Utilities comments are attached for
the Commission's review. The Engineering Department has commented that it recommends
approval of the plat subject to approval of the storm water management plan and calculations.
. Engineering comments are attached as Exhibit E.
Ryan Hughes, Natural Resource Specialist, has provided comments on behalf of the
Environmental Advisory Committee (EAC). These comments are attached as Exhibit F.
Comments from the Park and Recreation Advisory Board (PRAB) are attached as Exhibit G.
Park and Recreation staff needs to work with Scott County staff to determine if and/or where a
trail should be constructed to serve this development. Staff is recommending that this issue be
resolved prior to City Council review of the preliminary and fmal plat.
STAFFRECO~ENDATION
Staff recommends that the Planning Commission recommend to the City Council the approval of
the Preliminary Plat of Krista I Estates, subject to the following conditions:
I. Prior to review of the preliminary and final platby City Council, in accordance
with the subdivision ordinance, the City shall work with the County to determine
whether a trail or sidewalk or funding for a trail or sidewalk shall be required along
CR 79.
II. The following procedural actions must be completed prior to the release of the
Final Plat for recording:
A. Approval of title by the City Attorney.
B. Execution of a Developer's Agreement, which shall include provisions for
security for public improvements within the plat and the engineering review
fees, and any other fees as required by the City's adopted fee schedule.
1. Street lighting to be installed in accordance with the requirements of
the Shakopee Public Utilities Commission.
2. Electrical system to be installed in accordance with the requirements
of the Shakopee Public Utilities Commission.
3. Water system to be installed in accordance with the requirements of
the Shakopee Public Utilities Commission.
4. The developer shall be responsible for payment of Trunk Storm Water
Charges, Trunk Sanitary Sewer Charges, Trunk Storm Water Storage
and Treatment Charges, security for the public improvements,
engineering review fees, and other fees as required by the City's most
recent adopted Fee Schedule.
5. Provide electronic (Auto CAD) files ofthe Final Plat and all record
drawings to the engineering department.
6. Additional right-of-way, in the form of equidistant chamfers 25 feet in
dimension, shall be provided at the intersection of Kristal Court and
County Road 79 (Townline Avenue).
7. Minimum drainage and utility easements for sanitary sewer and storm
sewer in non-paved areas shall be provided at one to one and half ratio,
r. Silt fence and/or tree protection fence shall not be installed within delineated
wetland.
J. The applicant shall install silt fence along the delineated wetland edge to
prevent impacts to the wetland during construction.
K. Silt fence and/or tree protection fence is to be removed following
establishment of vegetation as determined by an inspection by the Natural
Resource Specialist or other City staff.
IV. The following items shall be completed simultaneous to the recording of the
Final Plat:
A. Simultaneous to the recording of the plat, a deed restriction shall be recorded
on all drainage and utility easements as designated by the City of Shakopee.
They shall include, but not be limited to, the following:
1. The drainage and utility easement adjacent to the West property line of
Lot 1, Block 1.
2. The drainage and utility easement adjacent to the South property line
of Lot 4, Block 1.
3. The drainage and utility easements adjacent to the North, Southeast,
South and West property lines of Lot 5, Block 1.
4. The drainage and utility easements adj acent to the East, South, and
West property lines of Lot 6, Block 1.
v. Follo-Wing approval and recording of the final plat, the following conditions shall
apply:
A. Building construction, sewer, water service, fire protection and access will be
. reviewed for code compliance at the time of building permit application( s).
B. The developer and/or their assigns shall be responsible for any required or
desired noise or dust mitigation measures.
C. The applicant shall plant tree replacement species consistent with the 2006
Tree Planting Guidelines.
D. The applicant shall seed the proposed storm pond with a native wetland seed
mixture and erosion control blanket be place four feet either side ofthe
~"'--""~'''''-',,,,,,,,,,,-,,---,- normal water level and around outlets to prevent erosion and sediment
deposits from discharging to downstreain waterbodies. . .-...--......--......,..------
E. No landscaping, ponding, benning, or signage shall be permitted within the
County right-of-way.
F. Any existing driveways/field accesses to this property shall be completely
removed from the County right-of-way and graded to match the existing ditch.
G. Any work within the County right-of-way shall require a pennit.
H. If County Road 79 is ever proposed to be a divided roadway in the future, it is
very likely that road access to County Road 79 will be modified to a right
inlright out only.
r. Temporary street signs shall be installed prior to issuance of any building permits.
VISIONING RELATIONSHIP
This action supports:
Goal D: "Vibrant, resilient and stable"
depth vs. width. The easements shall be centered along the utility
alignment.
8. Easements shall be shown on the Final Plat as approved by the City
Engineer. They shall include, but not be limited to, the following:
a) Provide a minimum of 42 feet of drainage and utility easement,
centered on the proposed sanitary sewer, between Lots. 5 and 6,
Block I.
b) Provide a minimum of 15 feet of drainage and utility easement
adjacent to the County Road 79 (Townline Avenue) right-of-
way.
9. Park dedication requirements shall be met by providing cash in lieu of
land dedication. Park dedication fees in the amount required by the
City Code and adopted City fee schedule shall be paid prior to the
recording of the final plat. If any portion of the property is being
platted as outlots to accommodate a phased development, the park
dedication fees for each future phase shall be based on the fees in
effect at the time of final plat approval for those outlots and shall be
paid before the final plat for those outlots is recorded..
10. The minimum right-of-way dedication for County Road 79 shall be 60
feet from centerline.
II. The proposed road access onto CR 79 shall require a right turn lane
and bypass lane to be constructed on CR 79.
III. The following items shall be completed prior to the approval of a grading permit
and/or a street/utility plan:
A. No public improvements shall be constructed until the City Engineer and the
Shakopee Public Utility Commission (SPUC) approve the Final Construction
Plans and Specifications.
B. The applicant shalfobtain the necessary Scott County permits/approvals
(access, right-of-way, drainage, etc.).
C. The applicant shall obtain a NPDES permit prior to any land disturbing
activity. A copy ofthis permit shall be provided to the City.
D. The applicant shall work with City staff to extend sanitary sewer to the
remaining lots of Beckrich Park Estates lying north of Barrington Drive.
E. The applicant shall work with City Staffto provide an acceptable storm water
systems design to prevent erosion/scouring of the County Road 79 (Townline
Avenue) storm water system.
F. The storm water management plan and calculations hall be approved by the
City Engineer.
G. The applicant is responsible for preserving all trees indicated as saved on the
plans. If, as a result of mass grading, any ofthese trees are determined to be
wounded sufficiently to be considered dead or dying by the Natural Resource
Specialist, the developer will be required to replace the tree(s) according to
the Woodland and Tree Management Ordinance.
H. Tree protection fence for mass grading is to remain in place the duration of the
land disturbing activities, including the building of residential homes.
ALTERNATIVES
1. Offer a motion to recommend to the City Council the approval of the Preliminary Plat
subject to the conditions as presented by staff.
2. Offer a motion to recommend to the City Council the approval of the Preliminary Plat
subject to revised conditions.
3. Offer a motion to continue the public hearing to request additional infonnation from
the applicant and/or staff.
4. Offer a motion that prior to City Council review, the applicant meet and receive a
recommendation from the Parks and Recreation Advisory Board.
5. Offer a motion to table a decision and request additional infonnation from the
applicant and/or staff.
6. Offer a motion to recommend denial to the City Council ofthe Preliminary Plat.
ACTION REQUESTED
Offer a motion to recommend to the City Council the approval of the Preliminary Plat of Krista I
Estates, subject to the conditions as presented by staff, and move its adoption.
h:\boaa-pc\2006\07-06 final\prelim plat kristal estates 06060.doc
Shakopee - Location Maps Page 1 of 1
I
--- "11
. ..1""................'11
.......... .....
..
/~) AG
l8.r~~~1 I
~ N _ Subject Property
"'-'E
SHAKOPEE ...... Shakopee Boundary
,... c::J Zoning Boundary
COMMUNIIYl'lUDESlNCE 18S7 S
c:=J Parcel Boundary
Preliminary Plat and Final Plat of
Kristal Estates
... ". .. . . '-1_ .,____ u 11_ __..: _____1_...... .........l')f;flo::::P..."'11W1111-;l,..v-l-Pl!:lt-l-llnn+Final+Pla... 05/16/2006
PRELIMINARY PLAT FOR
KRISTAL ESTATES
www.kallloenglnHrtng.com
I ~ ~
'--.' ~~:gU) ~
r I. I ;;1 I .,90:5 d
. . I ~~~- Z
/ ,I ~"_ 0 d
I'v ~- ( ""NO AVE r _E_ ~ w
\ W LL c>.o.2 a::
.'<.. "I I EXISllNG DRAINAllE ~,-J ; I I OUISVILLE ~ ;; ~:5
.- I It: lJ1lUTf EASEMENT '1'" ~:S Is 0 ...
~.., . I ) I PIO :t71520090 I PIO 271520080 ~OWNSHIP 12 ABBEY _ ~d ~CD
,. I PIO :t715201oo flpT 0 a;; :> 0
I I I \ ^ I ,.... r\ It r:- (" -,- ^ -,- r:.- ~ VICINITY MAP ;~~ ! ;;;
I I I ' , L " I " I L ..... '" c>.c ~
-, ILL V V V V - '-' - L us a 'e;.~
I I .... U;:,_ i ~
I I >'BS"a~
50 - - - '@!ij06:l.s; l!!
I 191.68 <> 121.31 11 .. ., Ii :: . '"
. " 115.01'" _ i}e.ll 0 0
. 10 '."ji;,o;- - - - l
I 11"--------"11 lEGAl DESCRIPTION
- 60 - I r Lot I, Block I, BECKRICH PARK ESTATES. Scott County. Minn.soto.
I I ~: ! 1 C !: ...~ ~ ~ .
I :;II I I~ 1.- IiDI 0.113 ..... ...l ....
I - I C ZONING INFORMA l10N ., ::l
10 '" I i 18,805 ,q.fL I, EXlSllNG ZONING .. RIB -.E ~
i ,... I 0.43 ...... I 4 MINIMUM lOT \\10TH .. 60 FEET ENGINEER/SURVEYOR . q,) ....::!:
.J W MiNIMUM lOT DEPTH = 100 FEET .. 0 .... cu'
I I '- - - - - - - - - I in./ MINIMUM lOT AREA = 6000 SO. FT. KAlliO ENGINEERING, lLC . 15 ~ N 2:.
L J 0./ 10775 POPPITZ LANE ... 11 0
I - - - - ;.... CHASKA. MN. 55318 fil ~ OJ"ffi
I I, 115.01 f" /' lOT INF'ORMA l10N CONTACT: CURT KALLIO, P.E. 0:: CJ O.s:
S 952-445-7354 ~ C1. tII
:z /' PROPOSED lOTS = 6 ll!
~:: GROSS AREA .. 4.38 ACRES Q.
I _ _ T 1 PROPOSED R.O.W. .. 0.64 ACRES OWNER/DEVELOPER
I - - I llll /' CJM Prop.rtle. LlC.
i I .." 2917 W. 133rd St.
C Il ) '" /' SEl13ACK INFORMAllON Shokope.. MN 55379
I './'.. FRONT a 30 FEET ....
I j / /. ) /" PIO 271650060 SIDE YARD" 10 FEET ~
I . // . SIDE YARD (CORNER) a 20 FEET ~ ~
I 0 5 // /. 0 ~ REAR YARD" 30 FEET EXCEPT SHOIINOTHERv.!SE '" i>:> E ~
I ' U 29,272 ",.ft. // /. ~~'iJ Iil a ~ oJ'
. 0.67 a.... / "/" SITE INFORMAll0N 6.~ _ 8.
0:: '" 0
I (, ~ . /' \ MINIMUM lOT \\10TH AT SETBACK LINE IN SUBOIVlSlON .. 90 FEET ~. .ll :!
I t:: MINIMUM LOT DEPTH IN SUBDIVISION .. 117 FEET Q) ~ fJ)
. I ~ ~
PID 271650050 \ ~ ~
I 10 /' c: ~
,I r- ~ \
- 60 -- ~()ll1 382.14. / /. \ -r' C-
I I " I /.. \ ;;;
EXIS11NG IlRAlNAllE _<<-:: "
Ie UllUlY E.lSEMEN~ ""'" ~ /' " \
'I I" I \': ~ / >:. m-' \. ~~"'::"''''''"''''
I I /\ \ ~ ~5 ~ z
I I I / \ _1- -l L _1- !
I/'\ BEING 5 FEET IN Wlom ANO ADJOINING
I PID 271650030 lOT UNES, AND 10 FEET IN \\10TH AND ~
I I /' THE WEST liNE OF lOT I, BLOCK I, BECKRICH ADJOINING RIGHT OF WAY LINES AS ~
I \ \ PARK ESTA1ES IS ASSUMED TO BEAR N00'18'01-E. SHOIll'l ON THIS PLAT. (:)
I . /" · OEllOiES IRON MONUMENT FOUND ~ z v
o 50 100 0 OEN01ES 1/2 INCH BY 14 INCH MONUMENT SET AND Iii t t; ~
I I/"\ 5CALE IN FEET MARKED BY UCENSE NO. 14890. UNLESS OTHERWISE SHO"'tl. ~ g a 0
I I /' fil g:
I ( PIO 271650020\ . SH~ET .
I \ OF
. 1
I I ~~
GmJ~rrv
..
l ,,"'~" SCOTT COUNTY PUBLIC WORKS DIVISION
Scott HIGHW A Y DEPARTMENT ,600 COUNTRY TRAIL EAST . JORDAN, MN 55352-
9339
(952) 496-8346 . Fax: (952) 496-8365 'www.co.scott.mn.us
LEZLlE A. VERMILLION
PUBLIC WORKS DIRECTOR
June 16,2006
Julie Klima
City of Shakopee
129 South Holmes Street
Shakopee, MN 55379
RE: Preliminary Plat, Kristal Estates
CR 79, south of CSAH 78
Dear Julie:
We have reviewed the request for a preliminary plat and offer the following comments:
. The minimum right-of-way .dedication for CR 79 shall be 60 feet from centerline.
. The proposed road access onto CR 79 shall require a right turn lane and bypass lane to be constructed on
CR 79.
. Noise issues along the County roadways may arise as traffic levels increase in the area. Noise
attenuation is the responsibility of the developer and City.
__ .. '_00" n_...... .... n. ........ ..... . ..............- ........ .- ......- .... .-......- u.... ... ,". _.... _. ....... ,_ ._n.. ..... . _" . _ un. _........ ... . ._n' .... ,,_.. ..._..... 'n ...~___... ___ .--.- -""- .-".., _no' _.
. No landscaping, ponding, berming, or signage shall be permitted within the County right-of-way.
. Any existing driveways/field accesses to this property shall be completely removed from the County
right-of-way and graded to match the existing ditch.
. .Any work within the County right-of-way shall require a permit.
. If CR 79 is ever proposed to be a divided roadway in the future, it is very likely the road access to CR 79
will be modified to a right inlright out only.
Thank you for the opportunity to comment. If you have any questions, please feel free to contact me. .
Sincerely,
Craig Jenson
Transportation Planner
JUI'!.,..12-2006 08:59 SHRVnpEE PUBLIC UTILITIES :;::>~44::>'(,(b'( t"'.\a..:l
~~.f{ If,rr D
SHAKOPEE PUBLIC UTILITIES COMMISSION'
-
"L j g h tin g the Way . Ye 5 t e r day, To d a'y and Bey 0 n d "
MEMORANDUM
TO: Shakopee Community Development Department
FROM: Joseph D. Adams, Planning and Engineering Director
SUBJECT: STAFF REVIEW RECORD COMMENTS for~
Preliminary Plat and Final Plat of KristaI Estates
CASE NO: 06060
DATE: 6/12/06
COMMENTS:
. .
Municipal water sexvice is available subject to our standard tennsand conditions. These
include, but are not limited to: installing a lateral water main distribution system in
accordance with utility policy, paying the associated inspections costs, paying the Trunk
Water Charge, and paying the Water Connection Charge.
Underground electric servic.e is available subject to our standard terms and conditions. .
These include, but are not limited to: entering into an Underground Distribution
Agreement, granting any necessary easements, and paying the associated fees.
..-.. .." .---.. -"... '" _ ._ ... ......m ..._.". ..__ ._. ....,... .........
-.... ..-. .n_. _... "._ .._.... ._ ..... ........... '_'" ._ .._... ...... . ....... -.. -......
Street Lighting installation is available subject to our standard tenns and conditions.
These are contained in the current City of Shakopee Street Lighting Policy. Applicant
must pay the associated fees.
Applicant should contact Shakopee Public Utilities directly for specific requirements
relating to their project.
Note: There are existing watermains located at the south side of Hill wood Drive
along CR79 and at the east end of the Beckrich Park Estates outlot (out of
Patterson Drive) to the east of this property. The water mains will have to be
connected through this projec~ to form a looped system.
Post Office Box 470 . 255 Sarazin Street. Shakopee, Minnesota 55379-0470
, (952) 445-1988 . Fax (952) 445-7767
www.shakopeeutilities.com
~I"*'I'"I"'''I r-a 1")-'
f,X-H IB \T r;
City of Shakopee
Memorandum
TO: Julie Klima, Planner n
FROM: Joe Swentek, Project Engineer ~d~~
SUBJECT: Preliminary Plat and Final Plat - Kristal Estates Addition
PID NO.: 27-165001-0
CASE NO.: 06060
DATE: June 29, 2006
The application indicates a request for Preliminary Plat and Final Plat approval of a single-family
(R1-B) residential development located East of County Road 79 (Townline Avenue) and South
of Hill wood Drive.
This review should be considered preliminary, as more comments are to follow with. additional
submittals. However, I offer the following comments at this time for the applicant and for the
planning department:
General Comments
Thefollowing items shall be completed prior to release of the Final Platfor recording:
1. Execution of a Developer's Agreement, which shall include provisions for security for
public improvements within the Final Plat and the engineering review fees.
2. Payment of Trunk Sanitary Sewer Charges shall be made, as required by the most current
City of Shakopee Fee Schedule.
3. Payment of Trunk Storm Water Charges and Trunk Storm Water Storage and Treatment
Charges shall be made, as required by the most current City of Shakopee Fee Schedule.
4. Provide electronic (Auto CAD) files of the Final Plat and all record drawings to the
engineering department.
The following items shall be completed prior to approval of a grading permit and/or a
street/utility plan:
1. No public improvements shall be constructed until the City Engineer and the Shakopee
Public Utilities Commission (SPUC) approves the Final Construction Plans and
Specifications.
H:\EMPLOYEE FOLDERS\JSwentek\Plat.Reviews\Kristal.Estates\PP .FP.Review.Kristal.Estates.doc
Page 1 of3
Cz,
2. The applicant shall obtain the necessary permission, right-of-way and/or easements to
perform all work offsite.
3. The applicant shall obtain the necessary Scott County permits/approvals (access, right-of-
way, drainage, etc.).
4. The applicant shall obtain a NPDES permit prior to any land disturbing activity. A copy
of this permit shall be provided to the City.
5. The applicant shall work with the City staffto extend sanitary sewer to the remaining lots
ofBeclcrich Park Estates lying North of Barrington Drive.
6. The applicant shall work with City staff to provide an acceptable storm water system
design to prevent erosion/scouring of the County Road 79 (Townline Avenue) storm
water system.
Preliminary Plat
The following items shall be completed prior to release of the Final Plat for recording:
1. Additional right-of-way, in the form of equidistant chamfers twenty-five (25) feet in
dimension, shall be provided at the intersection of Kristal Court and County Road 79
(Townline Avenue).
2. Minimum drainage and utility easements for sanitary sewer and storm sewer in non-paved
areas shall be provided at a one (1) to one and a half (1.5) ratio, depth versus width. The
easements shall be centered along the utility alignment.
3. Easements shall be shown on the Final Plat as approved by the City Engineer. They shall
include, but not be limited to, the following:
. Provide a minimum of forty-two (42) feet of drainage and utility easement, centered
on the proposed sanitary sewer, between lots 5 and 6 of block 1.
. Provide a minimum of fifteen (15) feet of drainage and utility easement adjacent to
the County Road 79 (Townline Avenue) right-of-way.
Thefollowing items shall be completed simultaneous to the recording of the Final Plat:.
1. Simultaneous to the recording of the plat, a deed restriction shall be recorded on all
drainage and utility easements as designated by the City of Shakopee. They shall include,
but not be limited to, the following:
. The drainage and utility easement adj acent to the West property line of Lot 1 of Block
1.
. The drainage and utility easement adjacent to the South property line of Lot 4 of
Block 1
H:\EMPLOYEE FOLDERS\JSwentek\PJat.Reviews\KristaJ.Estates\PP.FP .Review.Krista1.Estates .doc
Page 2 on
f-'7
. The drainage and utility easements adjacent to the North, Southeast, South and West
property lines of Lot 5 of Block 1.
. The drainage and utility easements adj acent to the East, South and West property lines
of Lot 6 of Block 1.
Storm Water Mana2'ement Plan Review
Please see the attached e-mail from John Wingard ofWSB & Associates, Inc. dated June 21,
2006. The referenced attachments will be forwarded to the applicant.
Recommendation
Engineering staff recommends approval of the Preliminary Plat and the Final Plat subject to
approval of the storm water management plan/calculations and subject to the conditions above
being addressed by the applicant prior to recording the Final Plat.
H:\EMPLOYEE FOLDERSVSwentek\Plat.Reviews\Kristal,Estates\PP.FP .Review.Kristal.Estates.doc
Page 3 of 3
Page 1 of2 &r
Joe Swentek
From: John Wingard uwingard@wsbeng.com]
S~nt: Wednesday, June 21, 2006 5:17 PM
To: Joe Swentek
Cc: Todd Hubmer; Ted Witkowski; Curt Kallio
. Subject: Kristal Estates
Joe
I have completed my review of the Kristal Estates storm water management calculations, storm sewer design,
and construction plans. The documents provided for review included the following:
1. Storm Water Modeling Results-Hydrocad-dated 5/11/06
2. Walker Permanent Pool Volume Calculations-dated- 5/10/06
3. Kristal Estates Grading, Street and Utility Construction Plans-dated 5/10/06
Based on my review I offer the following comments and observations for your consideration.
Storm Water Quality Modeling
Attached is a copy of the Walker Excel Spreadsheet that shows our calculations for the size of the wet pond
volume. The area of the pond at the normal water level should be shown at 0.20 acres and the wet pond volume
should be shown at 0.37 acre feet. This is based on a development of 4.3 acres with a eN of 69 and an
impervious fraction of 0.3. The developer's calculations showed an impervious fraction of 0.1, which seems a
little low for this development.
Storm Water Drainage Modeling
The Hydrocad model is essentially accurate in modeling the pre- development and post development conditions.
The drainage boundaries, sub-catchments and wetlands are shown the same as the Shakopee Storm Water
Management Plan.
WSB's surveyors have shot the location and invert elevation of the 18" culvert that drains wetland 23P across
County Road 79. Our information shows an invert elevation on the west end of the 18" culvert at 895.87 and on
the east end at 893.95. The right turn lane and bypass lane construction will require the extension of the culvert
to match the new wider street. The culvert is currently 65 feet long.
The design of Pond 19P should include a 10:1 aquatic bench for the first foot below the normal water level. A
detail of the pond slope should be provided.
The half right-of-way for County Road 79 is shown at 60 feet. The design of the pond should not include any
ponding volumes in the right-of-way in case County Road 79 is upgraded in the future. The new County Road 79
typical section at the north side of Hillwood Drive includes a 52 foot wide street with a boulevard of 8 feet and then
4 to 1 slopes going down from the boulevard.
The current outlet for wetland 20P drains overland across the site in a northeasterly direction. The drainage flows
across the yards of the houses to the north in the Hillwood Estates development. The existing drainage system in
the Hillwood Estates area is a grassy swale that is not currently experiencing any erosion. The drainage continues
to the north to a culvert crossing on Hillwood Drive and then to an existing wetland northeast of the Hillwood Drive
cul-de-sac.
The proposed drainage plan is showing to divert the outlet for Pond 19P to the ditch along the east side of County
Road 79. The ditch is currently in good condition with grass, trees and brush along the ditch. The ditch along the
east side of County Road 79 has a slope from elevation 892 to 884 in the 400 feet from the pond outlet pipe to
Hillwood Drive. This slope computes to be 2.0%. . The diversion of water to the ditch could result in some
erosion. The Hydrocad model should be revised to include the characteristics of the ditch to determine the
velocity of water in the ditch. Then the ditch could be reviewed to see if erosion could be predicted.
The drainage report identifies that the ditch along the east side of County Road 79 flows into the new storm sewer
system recently constructed at Hillwood Drive with the County Road 79 project. Currently the drainage in the
r,,,,n,,,,nnc
Page 2 of2 f6
southeast corner of Hillwood Drivt. dnd County Road 79 drains around the con 'v( and flows east along the
southerly ditch of Hillwood Drive. If the ditch along County Road 79 were re-graded, then the runoff could drain
into new CB 5800. There are some benefits to re-grading the ditch to allow the runoff to drain to CB 5800. Then
the water would be in a pipe that drains to a regional pond that is designed to handle the runoff. Attached is a
copy of Plan Sheet 43R of 92 that shows the existing storm sewer on County Road 79.
CB 5800 drains to the north along the newly upgraded County Road 79. The storm sewer line is a 15" RCP that
has a slope of 4.43%. The 15" line drains into an 18" RCP line with a slope of 4.31 %. This storm sewer system
drains northerly for 700 feet from Hillwood Drive along County Road 79 and empties into a pond on the east side
of the street. The 15" storm sewer line has a limited capacity, so the new development will need to restrict the
flows to this line if the proposed pond is routed to this line and if the ditch is re~graded to allow the drainage to
flow to CB 5800.
The storm water runoff from new developments in this portion of Shakopee is required to be reduced to 1/3 cfs
per acre. The outlet for Pond 19P is shown as a 15" pipe. Restricting the flow out of the pond further will help to
minimize the potential for erosioIT in the County Road 79 ditch. The development should analyze the velocity of
water in the ditch along County Road 79 and analyze the capacity of the 15" storm sewer line that drains CB
5800.
Grading Plan
The grading plan shows work to be performed on the adjacent property to the south. . The developer should obtain
permission from the adjacent property owner.
The proposed houses shOUld have a basement elevation 1 foot above the high water level of the adjacent pond or
wetland. The revised plans should identify the lowest floor elevation of each house.
The proposed houses shall have a lowest entry level at least 3 feet above the anticipated 100 year high water
level of the adjacent pond or wetland.
Summary
To improve the drainage plan for the Kristal Estates development, the storm water pond should be expanded to
meet the Walker Model for water quality requirements. The expanded pond should be located east of the future
street upgrading for County Road 79. The pond outlet design should reduce the discharge rate as much as the
pond can allow to minimize the potential for erosion in the County Road 79 ditch. The County Road 79 ditch
should be re-graded at Hillwood Drive to allow the ditch to drain to existing CB 5800.
We would be happy to meet to review the comments. Thank you for your cooperation.
John P.Wingard, P.E.
Senior Project Manager
WSB & Associates
jwingard @Wsbeng.com
763-287-8306
, ,- - '" ^ - ,.
6XftJ ~11 r
CITY OF SHAKOPEE
MEMORANDUM
To: Julie Klima, Project Manager
From: Ryan Hughes, Natural Resource Specialist
On behalf of the Environmental Advisory Committee
Meeting Date: June 29, 2006
Subject: Kristal Estates
Preliminary and Final Plat
INTRODUCTION
The Environmental Advisory Committee (EAC) reviewed the Kristal Estates Preliminary
and Final Plat at the June 26, 2006 meeting.
BACKGROUND
The 4.38 acre site is located north of the Beckrich Park Estates development adjacent to
County Road 79 (Townline Avenue). According to the environmental and park plan
review, the site is currently vacant open space. The applicant proposes to construct 6
single family residential units on the site.
DISCUSSION
The applicant proposes to convert the vacant open space to six single family residences.
The following issues were discussed at the meeting:
Water Conveyance
The applicant proposes to treat storm water by constructing a storm water pond
within the development. Based on discussions with engineering staff the storm
water system and the storm water pond have the capacity for storm water from the
proposed development. The overflow for the storm water pond will be discharge~
to the ditch along County Road 79. The applicant will be required to obtain the
necessary permits and approvals from the County for the discharged water.
Water Quality
The design of the site will be required to be in conformance with the Engineering
Design Criteria for rate control and volume. Storm water will be directed to the
storm pond and existing wetland via storm pipes and natural overland flow.
Storm water directed into the storm pond will be treated prior to discharge
downstream.
Wetlands
One delineated wetland is identified on the project site. The project does not
propose any wetland impacts to this wetland. The wetland is adjacent to the
~
~
storm pond and overflow from the wetland will be directed into the stonn pond
for treatment prior to discharging downstream.
According to the Environmental and Park Plan review the wetland is a low
quality reed canary grass Type 1 wetland. Based on a site visit completed in June
staff concurs with this statement. A Type 1 wetland is a seasonally flooded basin
having waterlogged soil during variable seasonal periods but is usually well
drained during much of the growing season.
Woodlands
The applicant proposes to remove approximately 10 of the 30 surveyed trees on
the site. The woodlands on site are considered low quality and all trees proposed
to be removed are identified as box elder and elm. According to the Woodland
and Tree Management Ordinance the applicant is required to replace the removed
trees with 3 trees. The applicant is preserving a majority of the trees adjacent to
the wetland.
The applicant proposes to plant 5 overstory trees consisting of 3 different species.
The applicant proposes to plant green ash, linden, and white oak in the front yards
of the homes. The plan includes tree protection fence to protect individual trees
and woodland areas.
Grasslands
According to the Environmental and Park Plan review for the project the existing
condition of the Bite is primarily grassland. Most of the site consists of pioneer
grass species found in disturbed sites. The grasslands on this site do not exhibit
the characteristics of a grassland providing quality habitat for wildlife.
Soils
According to the Natural Resource Conservation Service soils information the
following soils and erodibility Classification are fonno on the ~ite'
Soils T e
Lee Silt loam
Wb Sil cIa loam
LcB Silt loam
HaC2 Loam
HcE3 Loam
The City will require the applicant to install and maintain erosion control methods
to City and State standards.
Wildlife Habitat
Based on the proximity of the site to County Road 79 and the surrounding
development, the site does not provide exceptional wildlife habitat. The site is
not included in the Natural Resource Corridor Map.
~
Noise
The site is bordered on the west by County Road 79. The nearest building pad is
approximately 90 feet from the centerline of County Road 79. Currently, no trees
exists in the area adjacent to County Road 79 and no trees are proposed to be
placed in the area between the building pads and the road.
The proposed development meets the Woodland and Tree Management Ordinance
requirements and does not appear to create any environmental issues with regards to
water conveyance, water quality, wetlands, woodlands, grasslands, soils, wildlife habitat,
and noise.
ENVIRONMENTAL ADVISORY BOARD ACTION
The Environmental Advisory Committee unanimously recommended approval of the
Preliminary and Final Plat for Kristal Estates and the proposed impacts and mitigation
measures to the water conveyance system, water quality, wetlands, woodlands,
grasslands, soils, wildlife habitat, and noise to the Planning Commission and City
Council with the standard and following additional conditions:
1. The applicant plant tree replacement species consistent with the 2006 Tree
Planting Guidelines available at
http://www.ci.shakopee.mn.us/pages/Parks/TreePlanting.pdf
2. The applicant seed the proposed storm pond with a native wetland seed mixture
and erosion control blanket be placed four feet either side of the normal water
level and around outlets to prevent erosion and sediment deposits from
discharging to downstream waterbodies.
3. The applicant is responsible for preserving all trees indicated as saved on the
plans. If, as a result of mass grading, any of these trees are determined to be
wounded sufficiently to be considered dead or dying by the Natural Resource
Specialist, the developer will be required to replace the tree(s) according to the
Woodland and Tree Management Ordinance.
4. Tree protection fence for mass eradine is to rp.main in place the duration of the
land disturbing activities, including the building of residential homes.
5. Silt fence and/or tree protection fence shall not be installed within delineated
wetland.
6. The applicant install silt fence along the delineated wetland edge to prevent
impacts to the wetland during construction.
7. Silt fence and/or tree protection fence is to be removed following establishment of
vegetation as determined by an inspection by the Natural Resource Specialist or
other City Staff.
GXH l13ff G-
CITY OF SHAKOPEE
MEMORANDUM
To: Julie Klima, Project Manager
From: Andrea Weber, Park and Recreation Landscape Design
Meeting Date: June 30, 2006
Subject: Parks, Open Space and Trails Review of the Preliminary and Final
Plat of Kristal Estates
INTRODUCTION
I am writing to provide you park and trail related comments for the Kristal Estates
development, and the Parks and Recreation Advisory Board's recommendation.
BACKGROUND
The Parks and Recreation Advisory Board (PRAB) reviewed the Preliminary and Final
Plat of Kristal Estates on June 26, 2006. Their discussion included park dedication and
trail considerations.
Kristal Estates is a 4.38 acre, 6-unit single family development, located adjacent to
Beckrich Park Estates, on the east side of CR 79, north of Barrington Drive. It was
originally platted as privately-owned open space for Beckrich Park as Lot 1, Block 1 of
Beckrich Park Addition. It is mostly open grassy area, with scattered trees and no
existing buildings. There is a small low quality Wetland on site which will be preserved
and incorporated into lot 6 along with a small storm water pond in the same lot.
PARKS, TRAILS, AND OPEN SPACE DISCUSSION
Park Dedication
Criteria
The City's park dedication requirements set a standard in residential plats of a minimum
of one acre of parkland per 75 people. Thus, one acre of land shall be conveyed to the
City as an outlot warranty for every 75 people the platted lal.d could house;-tn--tffls case
the development is proposed to be single-family lots, so the ordinance establishes:
3.0 persons per lot X 6 lots 175 =0.24 acres of park land
The City's park dedication ordinance also allows the City to accept cash in lieu of land,
or a combination of land and cash. Cash dedication based on the adopted 2006 Fee
Schedule would be:
6 units X $5,340/unit = $32,040.00
Applicant Proposal
The applicant is proposing cash contribution.
Trails and Sidewalks
The Applicant is not proposing any sidewalks. The proposed cul-de-sac connects to CR
79, which is a planned transportation trail route and would typically require a trail be
constructed as per the Subdivision Ordinance. There is a trail segment which has
recently been constructed on the west side of CR 79, from Hwy 169 to south of the new
High School on the west side of the road. It has not been determined if there will be trails
G-
on both sides of this road or if there will be a trail on one side and a sidewalk on the
other. However, since the closest park these residents are likely to want to access is
Providence Westchester, which is on the east side of CR79. The PRAB recommended
approval of the Plat with the condition that the City coordinate the trail/sidewalk location
with the County. The City has contacted the County and is in the process of working this
out. There is no trail or sidewalk shown on the drawings, though the applicant does state
that a trail could be constructed in the Environmental and Park Plan Review. I f the trail
or sidewalk is not desired to be built at this time, the City could also collect funds from
the applicant for future construction.
PARK AND RECREATION ADVISORY BOARD RECOMMENDATION
The Advisory Board recommends approval of the Preliminary Plat of Kristal Estates with
the following conditions:
'1. The applicant shall meet park dedication requirement by providing cash in lieu of land
dedication.
2. Park dedication fees in the amount required by the City Code and adopted City fee
schedule shall be paid prior to the recording of the final plat. If any portion of the
property is being platted as outlots to accommodate a phased development, the park
dedication fees for each future phase shall be based on the fees in effect at the time of
final plat approval for those outlots and shall be paid before the final plat for those
outlots is recorded.
3. Prior to review of the preliminary and final plat by City Council, in accordance with the
subdivision ordinance, the City shall work with the County to determine whether a trail or
sidewalk or funding for a trail or sidewalk shall be required along CR 79.