Loading...
HomeMy WebLinkAbout5.B.8. Authorize Trail Overlay in Memorial Park S.5'~1 CITY OF SHAKOPEE CONSENT MEMORANDUM TO: Mayor & City Council Mark McNeill, City Administrator Bruce Loney, Public Works Director FROM: Michael Hullander, Public Works Supervisor DATE: June 20, 2006 SUBJECT: Trail Overlay INTRODUCTION: The Park Division has budgeted $20,000 for trail overlays in Memorial Park and the Upper Valley Drainage Ditch. BACKGROUND: Staff budgets monies each year for the pavement preservation of the City's trail system. This year staffis requesting to complete trail sections from the Mill Creek Bridge to Murphy's Landing for the low quote price of$10,585.00. Staffis also requesting to overlay the trail along the Upper Valley Drainage Ditch from 4th Ave. to Sarazin St. Along with this project staff will be lowering the trail by the retention pond along 4th Ave. for an emergency overflow to prevent water from backing up on 4th Ave. The low quote price for this overlay is $11,000.00. Staff has received three quotes with the low quote from Bituminous Roadways, Inc. (Because the quote is older than 30 days, there was an increase of $300. This increase has been added to the quote prices stated above.) , Staff has budgeted $20,000, but due to the increase in bituminous prices the total low quote is $21,585. Staff is recommending the additional cost to he expended from Park Operating Supply budget. AL TERNATIVES: 1. Authorize staff to proceed with the trail overlays for Memorial Park and the Upper Valley Drainage Ditch forthe low quote price from Bituminous Roadways, Inc. of$21,585.00 with $20,000 to be expended from the Park Division Pavement Preservation and $1,585 to be expended from the Park Division Operating Supply budget. 2. Deny the request. 3. Table for additional information. VISIONING RELATIONSHIP: Goal A - Active and Healthy Community, Strategy 2 - Enhance Physical, Mental, and Spiritual Health. ACTION REQUESTED: Authorize staff to proceed with the trail overlays for Memorial Park and the Upper Valley DrainageDitch for the low quote price from Bituminous Roadways, Inc. of$21,585.00 with $20,000 to be expended from the Park Division Pavement Preservation and $1,585 to be expended from the Park Division Operating Supply budget. ~.~D..- Michael Hullander Public Works Supervisor MH:ja $. ~. ~ I CITY OF SHAKO PEE CONSENT MEMORANDUM TO: Mayor & City Council Mark McNeill, City Administrator Bruce Loney, Public Works Director FROM: Michael Hullander, Public Works Supervisor DATE: June 2q, 2006 SUBJECT: Trail Overlay INTRODUCTION: The Park Division has budgeted $20,000 for trail overlays in Memorial Park and the Upper Valley Drainage Ditch. BACKGROUND: Staff budgets monies each year for the pavement preservation of the City's trail system. This year staff is requesting to complete trail sections from the Mill Creek Bridge to Murphy's Landing for the low quote price of$1O,585.00. Staffis also requesting to overlay the trail along the Upper Valley Drainage Ditch from 4th Ave. to Sarazin St. Along with this project staff will be lowering the trail by the retention pond along 4th Ave. for an emergency overflow to prevent water from backing up on 4th Ave. The low quote price for this overlay is $11,000.00. Staff has received three quotes with the low quote from Bituminous Roadways, Inc. (Because the quote is older than 30 days, there was an increase of $300. This increase has been added to the quote prices stated above.) Staff has budgeted $20,000, but due to the increase in bituminous prices the total low quote is $21,585. Staff is recommending the additional costto be expended from Park Operating Supply budget. ALTERNATIVES: 1. Authorize staff to proceed with the trail overlays for Memorial Park and the Upper Valley Drainage Ditch for the low quote price from Bituminous Roadways, Inc. of$21,585.00 with $20,000 to be expended from the Park Division Pavement Preservation and $1,585 to be expended from the Park Division Operating Supply budget. 2. Deny the request. 3. Table for additional information. VISIONING RELATIONSHIP: Goal A - Active and Healthy Community, Strategy 2 - Enhance Physical, Mental, and Spiritual Health. FROM :8RI SHAKOPEE FAX NO. :952-233-0686 May. 02 2006 01:25PM Pl/l ..BITUMINOUS ROADWAYS, INC. _ ...,.... fl'.''':'.. _.,..:....'....11II1....... -- No. 11625 o 282fi CEDAR AVENUE SOUTH 1 MINNEAPOLIS, MN 554071 PHONE (612) 72H?451 FAX (612) 721-6875 o 9050 JEFFERSON TRAIL. weST IINVER GROVE HEIGHTS, MN 55077 1 PHONE (651) 666-7001 FAX (651) 687.9857 .iI 6898 HIGHWAY 101 EAST 1 SHAKOPEE, MN 553791 PHONE (952) 233-1660 FAX (952) 233.06B6 Bill EgBD City of Shako pee DATE .. ..........May..2~ 2006.. . . .......-..... 129 Holmes Street South Shakopee, MN j~J79 Proleot~ . .... ..._..__.Sb.akopee Trails-......------......... . ... .'H..'_ Phone 952~231.9555 ....... ... Location: __...._.. .. .Shak.ajum,..~. ..... . .-.-...---.-..........-... ... ............. . .Fax:. ...J1i2...233.3.80.7 . ". .~ Description: PJlYemmllMainteaanc(' -.... .............. .......... . ..' .... ... . Mobile 1 Other: ..._...................-.- ....-.-........." . . ;1 .,.. .. . . . JmVlSION - Uppir Valley Drainage Ditch 1,525 S.Y. ~ Fumish and instal1 a MNIDOT 2357 Bituminou! Tack Coat. ~ Swe'!Pexisting aSfhaJt surface to remove dirt end debris'Orior to overlat -4 Funum and instal a 2 inch (compacted thickness) MNID T 2350 Type V4B Bituminous Wearing Course. TOTAL PRICE $10,850.00 Vft'ra~& Park 2lU S.Y. Opdcm #1~ !uavate & Pave .. Remove existing asphalt to accommodate a 8Jinch pavement section. Dispose of off' site. .. Furnish and instatla 6 inch MN/DOT 3138 Class 5 10001e Crushed Quarry Rock Base. 1,009 S. Y. ~ Furnish and install a 2.5 inch (compaeted thickness) MNIDOT 23S0Type L V4B Bituminous Wearing Course TOTAL PRICE $10,435.00 Option #2 - Reclaim & Pave 281 S.Y. .. Reclaim the existing asphalt. .. Fine-grade existing aggregate base material, in preparation for pavement. 1,009 S. Y. .. Furnish and install a 2.~ inch (compacted thickness) MN/DOT 2330 Type L V3B Bituminous Wearing Course TOTAL PRICE $11,950.00 &e_I1II1: .. L8Ddsc~e Restoration 04 Tree Trimming NoI,: \. ~te valid for 30 5~_:~.:R.s.~;~t~~f;.~r:.?~.~Q~=EMENT The specifications, oondltlone, attachments. tarms and contract are satisfactory, and (I) (WA) heraby authorIze the p~rrmmQnca of this work. 9lTUMINOUS ROADWAYS, INC. . .... _._._".. . " ........ ...........- _}A."nnKt'm~;\1..~__....._DATe_j!7.n~Q~.._ ACCEPTED BV:.._.__............____~.._.. ... .-.. - ........... ......______._........ .DAT!.. .......__... - nus ^GR.~i!MENT.i.9v6iD30iii\YGFROM OATI'.IINI.Il!1l:l W~IITE'COPV Ie eIGNF.D^ND RllTUtlNEtJ wei6'DF..A. .._..__.M.....- ......~, e5/l:lB/2l:ll:lb U: 1::> ':l:lL~~O!t:J::JO ,11,;.J1\"",__. ,.._. ''''_' -.. . ........... ..... JropD5al Page No. of Pages NORTHWEST ASPHALT, INC. 1451 STAGECOAOH ROAD . SHAKOPEE. MN 55379-2797 PHONE ~952) 445-1003' PAVING, EXCAVATION & UTILITIES FAX 952) 445-1056 WWW.nw8S halt.net PHONE DATE 952-233-9555 5-08-06 smEET A TIN: BIlL EGAN J09 NAME PARK TRAILS CITY, STATE AND ZIP CODE JOB LOCATION SHhKOPEE, MN ARCHITECT . DATE OF Pl.ANS . We hereby 8Ubmlt specJlICa~on$ and udmBl8B lor: .... p' . Item No. Description UIM Qty. . Price Extension UPPER VALLEY DRAINAGE DITCH TRAil: 8~ X 1715' MILL ENOS, TACK. 2." LV4 WEAR: LS 1 13,337.5.0 13.331.50 VETERAN'S 8.' X 1135" MILL ENOS,. WEAR. SA REMove B BIT.(2~1 SY) WITH CL.5 RECOMPAC 13,832.50 ... ...... ;. Total $27,170.00 , EX~LUSfO~S: BID BASED ON NOTI;S AND S~EC'$ PROVID~O. . . . . AU\ho~ed.. . . Note: ThIs proposel may bll' ~Jo days'. SlgflalVre .' m... wiftldrawn by ua if "'" lIlXlllplsd within . j\tt~pfauce of ~ro.pDsa1 . Tl1..ooye~rte.s. &pecification$ Bnd conditione 11I'8 5lltiGlaclllry and 'art hereby lICc~ptt'd. Vbu are 91gnlllUre aUlhorlzed to do \he worit as specified: Payment wllI'be madO Q& .OutllnOd aboYa.. . D~19 Ace.planee: $'llnaIUre 42." ._ .. .~... ... '0'-'" . ._.... .0,'": ."PtJ.81~;;.~e~'FQ,PPI:m$l,;I~e. ~AM:WAY';&!'~at<'~~;~~~~;B~'OK:Il()PP~[) WWWiPIE)f:lalic'Om P.O. .aOX3t7 ..1$(j~tlbeMCONDRIVE SfflAK(i))'peE. MN55379-'0317 PH.{95~)44$~767a.FAX (9$~)445-'7682 Page NQ. of Pages PROPOSAL SUBMITTED TO PHONE # CITY OF SHAKOPEE 952-233-9555 2006 ATTENTION FAX # BILL EGAN STREET JOB NAME 400 GORMAN STREET CITY, STATE, AND ZIP CODE JOB LOCATION SHAKOPEE, MN. 55379 MAP LOCATION We hereby submit specifications and estimates for: ASPHALT OVERLAY: UPPER VALLEY DRAINAGE DITCH 8 X 1715 MILL END JOINTS TO ALLOW FOR OVERLAY TACK COAT AT .05 GALS PER SQ. YD INSTALL 2 INCHES MN.DOT #2341A BITUMINOUS WEARING COURSE ROLL AND COMPACT. COST: $11,710.00 VETERANS PARK: MILL END JOINTS, RECLAIM BADLY BROKEN AREAS (5 EACH 281 S.Y.) AND MIX WITH EXISTING BASE. GRADE AND COMPACT INSTALL 2-1/2 INCHES MN.DOT #Z341A BITUMINOUS WEARING COURSE ROLL AND COMPACT COST: $12,325.00 *DISCOUNT IF BOTH JOBS ARE AWARDED AND DONE AT SAME TIME We Propose hereby to furnish material and labor. complete in accordance with above specifications, fOr the sum of; AS LISTED ABOVE d II ($ oars ). Payment to be made as follows; NET ON COMPLETION Any person or company supply labor or materials for this improvement to your property may RICH PEL TIER file a lien against your property if that person or company is not paid lor the contributions, All I . ""'._ ._"...._..m... __"""" .'m",," "9'''''''''''"' ~ ~ ~ specified. All work is to be completed in a workmanlike manner according to specifications Authorized , . / submitted per standard practices, All agreements contingent upon strikes, accidents, or delays Signature. I. f . V beyond our control. Owner to carry fire, tornado and other necessary insurance, Our workers are fully covered by Workman's Compensation Insurance, See Additional Contract Terms N t Th' . b On The Back. 0 e: IS proposa may e withdrawn No FINANCE CHARGE made on accounts paid within 30 days, Past due invoices will be by us if not accepted within FIFTEEN ( 15) days. charged 11/2% per month FINANCE CHARGE (18% annual percentage rate), Acceptance of Proposal - The above prices, speCifications and conditions are satisfactory and are hereby accepted, The general provisions on the back of this contract are made a part of this contract and incorporated herein by this reference. You are authorized to do the work as specified, Payment will be made Signature as outlined above. Date of Acceptance: Signature .- . . .... White Copy (Return to Office) . Yellow Copy (Customer) - Pink Copy (File)