HomeMy WebLinkAbout13.C.2. CR 101 Reconstruction Project-Undergrounding of Power and Street Lights
/3.c.;L.,
CITY OF SHAKOPEE
Memorandum
TO: Mayor & City Council
Mark McNeill, City Administrator
FROM: Bruce Loney, Public Works Director
SUBJECT: C.R. 101 Reconstruction Project - Undergrounding of
Power and Street Lights Update
DATE: June 6, 2006
INTRODUCTION:
This memo is intended to update the Council on the future undergrounding of overhead
power on C.R. 101, from CSAH 17 to the Mill Pond Bridge and also street lighting
design for this segment.
BACKGROUND:
At the April 18, 2006 City Council meeting, City Council did approve plans and
specifications for the C.R. 101 reconstruction, as well as the sanitary sewer
reconstruction for the East River District Trunk Line. This project is being done
cooperatively with Scott County, as the City has a need to reconstruct its trunk sewer line
~and the County can reconstruct C.R. 101 with Stateturnback funds. At this meeting, City
Council did review the future undergrounding of overhead power lines on this segment of
road and also discussed the street lighting design and asked staff to bring back
information on these issues in the future.
Staff has met with Shakopee Public Utilities Commission's (SPUC) staff and would have
these comments in regard to the street lighting and the undergrounding of overhead
power:
1. Currently, the City has three street lights in this corridor, in addition to the street
lights at the traffic control signal at CSAH 17 and C.R. 101. Staff would
recommend that the street lighting standards of this corridor and the downtown
area be reviewed by various stake. holders, including, but not limited to the
Economic Development Advisory Committee, City Council and business owners
along the corridor to see what type of streetscape and street lighting standards
should be incorporated in the overall desigil. In 2007, the Mill Pond Bridge is
proposed to be reconstructed and sidewalks, bridge treatment and other
enhancements should be decided on in late 2006 or early 2007. At that time, the
City will need to have selected. street lighting. standards for the bridge and the
corridor in this area for installation. For the portion of C.R 101 being
reconstructed this summer, staff would propose that temporary lights be installed
on the existing power poles. Currently, a rough estimate would be approximately
$1,000.00 per light or $3,000.00 total for the three lights to be replaced.
2. 1 ~ inch inter-duct conduit for street lighting would be installed on both sides of
the roadway, approximately three feet behind the curb, from CSAH 17 to the Mill
Pond Bridge. . This would allow flexibility to install the street lighting standards,
whatever is selected in the future, and also be connected to the Mill Pond Bridge.
3. SPUC's staffwill investigate the future undergrounding of power lines along C.R
101, and perhaps the removal of this overhead power system, if the security lights
can be removed that are currently on the system and Fajita Republic can be served
from another power line system. It is proposed by City staff and SPUC' s staff to
provide three locations of (3) 3-inch conduit crossings on C.R 101 in order to
provide underground power in the future.
City staff has reviewed this corridor and also reviewed other City's lighting styles and
overall streetscape for major commercial corridors, such as Savage, Burnsville, Apple
Valley, Rosemount, Prior Lake, Chaska and Eden Prairie and would suggest to Council
that a consultant that is specialized in this area be hired to assist in what future streetscape
improvements should be included in the C.RIOI corridor, including street lights. Staff
would propose to bring this item back at the June 20, 2006 City Council and Economic
Development Authority meeting.
Scott County has taken bids for the C.R 101 project on May 26,2006, and an acceptable
bid was received from S.M. Hengtes & Sons, Inc. It is proposed to begin construction in
June for reconstruction of this segment of . road and staff would recommend that the
existing street lighting system be removed in its entirety, as the system has many faults
and its age is such that it warrants removal. New conduit should be installed for future
street lighting purposes. Temporary street lights can be installed on the existing overhead
power lines and future undergrounding crossings. can be made under C.R. 101 for future
undergrounding of power, as needed in this area. Staffis working with SPUC's staff to
obtain a cost estimate for this work. Staff estimates the cost at $22,000.00. Staff would
recommend that funds be allocated from the Capital hnprovement Fund for the future
street lighting and futureundergrounding of power in this area.
ALTERNATIVES:
1. Provide staff direction to staff s proposal on future street lighting and future
undergrounding of power on C.R. 101, from CSAH 17 to the Mill Pond Bridge.
2. Do not provide staff direction at this time.
3. Table for additionalinformation.
RECOMMENDATION:
Staff recommends Alternative No.1, to provide staff direction on its proposal to provide
temporary street lighting, provide the future street lighting conduit and future conduit for
undergrounding of power on C.R. 101, from CSAH .17 to the Mill Pond Bridge corridor.
ACTION REQUESTED:
Provide staff direction to staff s proposal on future street lighting and future
undergrounding of power on c.R. 101, from CSAH 17 to the Mill Pond Bridge.
~Lone
BUpmp
ENGR/2006PROJECTfC.R.IOlfWORDfSTREET-POWERLINES
Sta. 107+53
ii'X4'WYE
75' - 4~ PVC
CONNECT TO
EX. SERVICE
~
12'X4"WYE
75' - 4' PVC ~
CONNECT TO
EX. SERVICE
I !l
I ~
I lV ~Mg.... i
,~~a~5 ~
~, 1. RES ORE:AREAOISTURSEDWITH :t:..c:ln~.b .lj
0 S"X4'WYE o .E'''~M i
5{)'-4"PVC 6" OPSOII.., -J:::i::,o.o
MN OT 308 SEED MIX AND CAT. 3 ; '5:f~~
~~~~;Z~I ER ION CONTROl BLANKET. ~~~~M~
Sta. 103~15 2. REST RE MAINTAINED AREAS WJlH
i 15"X4'WYE I 6' T PS01L AND SOD.
\ \ 50'-4" PVC (') 3. REST REGRAVELDRlVEWAYSAND I CI1 ~~6:ll.. ~
i Sta. 100+36 CONNECT TO PAR NG LOT PER DETAIL I
- \ 4. extS G SEWER MAINS AND SERVICES
818. 99+80 12'X4"WYE _J EX. SERVICE rrii'J ARES OWN BY GENERAL lOCATION. ~
2EA 50' - 4" pvc THE NTRACTOR SHAll.. VERIFY
12" X 6" WYE CONNECT TO I ~~T .aCATIONSOFEACHSEWER r
70' - 6" PVC EX, SERVICE I
CONNECT TO Sta.100+36 (')
EX. SERVICE 12" X4" WYE 0
5{)' - 4' PVC (') I
CONNECT TO
EX. SERViCE
0 " 100
lo....__
SCllle in feet
I-
Z
W
:::<
w
0
"OJ' .'. :g; ~ ...... "::w:3:i. :5
::~: :~: :,i ",,(::PRO ",:o\l8l (L
:::~:g:' :0: ~ :OStp: IN ~:q~TO :::=ti~t-; W
740 ~:ij: r: i-i::~~:-:- 740 a::
... + .. ~ 01'>(0....<:'4 iS~
.... ..,,,. ::rn)>>~ ~;i~~e
~ Nt.-:.: :l~i 5: :::-1: 0<
u ~~: 15 '" :-:~r:--:r;-~
":Ew~ 0<(::1':>./.->. (f):::<
>: ....... ~~~:~~ 735 WeJ
< 735 :t:.(
~ ":~!I?~. Zt;;;:
~ Z3=
0\ ::::;:0
730 R 730 z
~ : ; :$TP 1>1 ~~q~~INq STORM: C u..i<(
Wa::
725 725 a..~
'" On..
{t': :6i-w ......... : 24' :~C ::LW
'" :~~~~~ : : ... <([E
. -.... i~..,,<c:S ~1F:
" :: :i$i1': : :<!~O%:, i'?~Gi '.i R: ~~ : :r;W
~ 720 ..... . . . . . . . . ... :;: 2,6~':":j ... 720 (f)~
a::
~ w
715 715 >
;;::
!?' tii
~
." L:5
d 710 710
u
/
I :~m: ::+.~;: :.m, ::9.:g:: .,,;::::. ~og:: ;~~: ........ ::9.~:: :~t: :~~~ii :~~: :~~; :0*: ~~;
:;};;i :~~ :r:-:~:
J~~~ ~:8~~~ ~8~~ ~~8~~~ j~~: ~8~ ~ :':'r:-: ~~8~;~ ~88~ :8~~ ~~~ ~~~~
98+00 99+00 100+00 101+00 102+00 10.3+00 106+00 107+00 108+00
:<