Action Sought
The City Council is asked to approve quotes and award a contract for the construction of the open air shelter at
Huber Park.
Background
The construction of an open air park shelter at Huber Park was included on the 2014 Park Reserve CIP. The original
preliminary estimate for the shelter was$90,000.On July 15,2014 the City Council authorized staff to utilize the
$150,000 intergovernmental grant from the Shakopee Mdewakanton Sioux Community for the construction of the
shelter. The shelter will be 38'X 50'with a 12'concrete apron on the south and west sides. The shelter will
contain steel columns that will match the steel columns of the amphitheater. The shelter will also contain a half wall
on the east side as a backdrop to the shelter,which will increase the separation from the playground.
Discussion
The addition of an open air shelter in Huber Park will benefit the entire community. The shelter will provide park
users with a covered area to meet for events such as wedding receptions,birthday parties,family reunions, etc. The
shelter will also provide the City with an additional revenue source as a rental facility.
The construction of this shelter will be similar to the construction of the last three park shelters that were
constructed in the City. The City will be the general contractor of the project and will coordinate the construction
process. In previous shelter projects the City obtained separate quotes for concrete/masonry work,utilities,and
carpentry. For the Huber Park shelter the City obtained two quotes for the concrete/masonry/carpentry work for the
construction of the shelter. The following quotes were obtained:
A. R.W. O'Brien Contracting,LLC $99,410.00
B. Greystone Construction Company $162,000.00
Staff has verified with the City Attorney that the project can proceed with two or more quotes versus a formal bid
because the original construction estimate was under$100,000,and a quote was received which was less than
$100,000.
Budget Impact
The construction of the Huber Park shelter will be funded by the$150,000 intergovernmental grant received from
the SMSC in 2012. In addition to the contract amount, electrical installation and City staff time for excavation,
painting and administration of the project will be charged to the project fund. The grant of$150,000 is anticipated
to be adequate to fund the project.
Relationship to Vision
A.Keep Shakopee a safe and healthy community where residents can pursue active and quality lifestyles.
Requested Action
If the City Council concurs,award a contract to R.W. O'Brien Contracting,LLC for the construction of the Huber
Park open air shelter.
Attachments: Shelter Plans 1
Shelter Plans 2
O'Brien Estimate
Greystone Estimate
6Legg NY( 'azdOMVIIS aaidONVHS Xtliallil1.019-541-9511
61995 NW 3.10YVHS .i,W.-1,4"
ISHHIS HZIONITII3 OgT 30 IMO SRL 13 ONOWV111 L691 4.4a,..4,
NOIIIAVd )1HVd ENE[f1H :Hai Skancl 'OM.NOIS30 I orauvna MEN
:AS NMV1:10 NI 9N
i
"'I
Nae
Pil i;'
A 0
WPIM
. iriFiA
4 1'gl
Ec ' I It=--------- :12rNil Or.. — ID 6 V
'Ala r: 161
4IP:.b
I 1 i It.0.16
1 1 I 6
7 I 1 i lk ',.' 1110/R1
i 1 i 4
li I:
. ....
11 25
ig
. 2
VA L
a 1 1
ige -n
c4 —8
...1
u_
6 t.
--------- -- ------------- nib.' --------I.Ab..
L ■___
'r ,P
1....NO"
VI .91/5 1-.91 41/5 1,91 .01
k
L- -sir 1s ---11 ? 1 '
1 ! I 1 1
1 I
7 1
ii 1 11 .7.
I 1
11" i
119
' --I li I 1
1 1
1 1 1 1
. I
6
il
> I I
i 7
I 1 "-=il 1
El- i I n
HI
11 II i 1 11-
1 1
1 1
■
_ E1 -11
r,,T,I L_____ _______ ____1 117 _1 rcil,L ___3 ITI i
ii
144.tr------------Lt='_1------ I I
I I I I
I i i i
H .91/5 1,91 .91/5 1,91 91/5 1,91 .5, I
6
I I I i
1 1 il
1 1
Wel.1.10 11”
I I
i --------------------- ------------------------ ___________i
1 I
,n1 .. ii8rL,�rr9f�4T9♦[�NNI 'aTad�i0NVHST rb�s�e� ��
warn W�aus d23urnia 091 3adONVHS 11£55 NIl]]aONVHN opmQ N
_ L
NOI'IIAVd >IHVd 2IJ f1H 30 I oQi ow Id ONI'MJ.99NLLAV9.3.M9N0 RH O
V.a ':o
i
VP
�oP
Pill
em 1 1 1 dhIp
11111 1
Ij1j�
11.1.1.1.1.1.
111
1!1!1!1!1!1!1
1111 �
0
Ell 1iil 11 a' _w
11!1!1!1!!1!o 1111 �w R—
H 1111
V I 1111 CL s-
�, 1■!■.
I1;;1;;1;1;
�!!!!!1
wiiiritii r j�jl
INN yi
ill i]II ;
1�llilililialil. thwthhh
it I'iiiiiiii!
�1111111yyl
l Illlll;lllll ;1;11 Ih!1!144!'!I 11 1111 1
1111 rniiiiiipi L
O
F.
Q
�i�i�ili�i�i�'� �1!'!'!'!1!1!1! 11-11111.1-2?O tt
CL
111 loll�Fj 1!1!1!1!1!1!1
goin
u aL
1!1!1!1!1!1!1
Page 1 of 1 Page(s)
Proposal
R W O'Brien Contracting, LLC
940 Bluebill Circle
SHAKOPEE, MN 55379
612-916-5159
robrien5205(ajyahoo.com
Attention: Bill Egan
PROPOSAL SUBMITTED TO PHONE FAX
City of Shakopee 952-233-9555 952-233-3807
STREET JOB NAME
129 Holmes street Huber Park Shelter
CITY,STATE AND ZIP CODE JOB LOCATION
Shakopee,MN.55379 Same
ARCHITECT DATE OF PLANS CITY,STATE AND ZIP CODE DATE
N/A N/A _ 8/13/2014
Build New Park Shelter
Excavate and install Footings and foundation Block
Furnish and install above grade break-face block
Furnish and install column block and brick
Furnish and install column and wall cap block
Furnish and install steel columns
Furnish and install wood roof stucture
Furnish and install Roof facia and soffit steel
Furnish and install rough sawn ceiling
Install interior slab and aprons
Does not include the following
Building Permit or bond
Building pad prep
Class V under slab
Sod or seeding repair
Painting or staining
We Propose hereby to furnish material and labor-complete in accordance with above specifications,for the sum of:
Ninety-Nine Thousand Four Hundred Ten and no/100--------------- ------ dollars($ 99,410.00 ).
Payment to be made as follows'
Upon completion
All material a guaranteed to be as specified All work to be completed in a workmanlike
manner according to standard practices.Any atteraton or deviation from above specdica- Authorized Rob O'Brien
bons involving extra costs will be executed onty upon written orders,and will become an Signature
extra charge over and above the estimate.All agreements contingent upon stokes,accidents Title President
or delays beyond our contra. Owner to carry ere,tornado and other necessary insurance. Note' This proposal may be
Our workers are fully covered by Workmen's Compensation Insurance withdrawn by us if not accepted within 30 days.
Acceptance of Proposal-The above prices,specifications and
conditions are satisfactory and are hereby accepted. You are authorized Signature
to do the work as specified. Payment will be made as outlined above.
Date of Acceptance: Signature
City of Shakopee Park shelter
gip &bfA14
500 S,Marschall Road Suite 300
Shakopee,MN 55379
GREYSTONE (952)496-2227 (888)742-6837 Proposal Sheet No.1 of 1
CONSTRUCTION
Date July 2,2014
Work Submitted To: I Work To Be Performed At:
Name City of Shakopee Job Name Huber Park Pavilion
Street 129 olmes Street South Street 150 Fillmore Street
City/State Shakopee, MN Zip 55379 City/State Shakopee MN Zip 55379
Phone Number 952.233.9555 Fax Date of Plans 5/10/13
Attention: Bill Egan Architect Krebs Drafting&Design
E-mail
We hereby propose to furnish all the materials and perform all the labor necessary for the completion of the following:
Huber Park Pavilion per plans by KREBS Drafting and Design, Inc.dated 5/10/13.
Plan No. 13-11 consisting of 3 sheets.
EXCLUDES:
Appraisal Costs Park Dedication Fees
Asbestos Abatement Perc Tests
Bedrock Excavation & Backfill Private Underground Utility Locates
Builders Risk Insurance SAC/WAC fees
Building Permit Soil Correction Work
Closing Costs Soil Export
Contaminated Soil Clean up& Disposal Security Monitoring Systems
Dewatering Site Surveys
Environmental Investigation &Remediation Subsurface Investigation
Frost Ripping Telephone Systems
Furniture, Fixtures& Equipment Unforeseen Subsurface Conditions
Lead Based Paint Removal Utility Hookup Charges
Methane Gas Monitoring Wet Land Remediation
Winter Conditions
All material is guaranteed to be as specified, and the above work will be performed in accordance with the
drawings and specifications listed above and completed in a substantial workmanlike manner for the sum
of:One Hundred Sixty Two Thousand and 00/100 dollars.
Respectfully submitted by:Greystone Construction Company
$162,000.00
Project Manager-
This proposal may be withdrawn by Greystone Construction Company if not accepted within 15 days.
Upon acceptance of this Proposal,all notations as stated above shall be incorporated
as part of the contract documents unless otherwise noted.
L:\A-Estimate-Bids-Proposals\Huber Park-Pavilion 2014\Proposal Form O7o214P o os 1 Form o7o214Sheetl