Loading...
HomeMy WebLinkAbout4.C.1. Approve Overhead Power Relocation on Spencer Street (CR 79) and Vierling Drive Mini-Roundabout Project Consent Business 4. C. 1. SHAKOI'EE TO: Mayor and City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director DATE: 06/17/2014 SUBJECT: Approve Overhead Power Relocation on Spencer Street (CR 79) and Vierling Drive Mini-Roundabout Project(D) Action Sought Approve a motion determining the existing overhead power lines on CR 79 that are to be relocated on the mini roundabout project, shall be placed underground. Background Shakopee Public Utilities Commission (SPUC)has reviewed the relocation costs of overhead power lines along CR 79 for determination by City Council to go underground or remain overhead. Scott County has awarded a contract for the reconstruction of CR 79 &Vierling Drive for a mini roundabout. The reconstruction of the County road will require the relocation of overhead power line facilities owned by SPUC. Per City Ordinance, the City Council can decide if the power lines can be relocated overhead or to be placed underground. Attached is a memo from Joe Adams on the power lines in the project area as well as maps showing the power lines. SPU has adopted an Underground Relocation Fund to pay the additional cost of undergrounding overhead facilities. Mr. Adam's memo does show the extra cost to underground per the segment on CR 79. Recommendation Staff recommends approving a motion determining that the existing overhead power lines on CR 79 that are to be relocated on the Mini Roundabout project shall be placed underground. The power relocation would be on the east side of County Road 79 and undergrounding the line would improve the sight lines of the intersection. Budget Impact No budget impact to City funds. However, it impacts the SPU's Underground Relocation fund. Relationship to Vision This supports Goal D: Maintain, improve and create strong partnerships with other public and private sector entities. Requested Action Approve a motion determining the existing overhead power lines on CR 79 that are to be relocated on the mini roundabout project, shall be placed underground. Attachments: SPUC Memo with location map SHAKOPEE PUBLIC UTILITIES MEMORANDUM TO: John Crooks, Utilities Manage?/ FROM: Joseph D. Adams, Planning& ngineering Director , # SUBJECT: CR 79/Spencer Street Overhead Facilities Relocation DATE: June 10,2014 ISSUE The City of Shakopee and Scott County are re-constructing the intersection of CR 79/Spencer Street and Vierling Drive into a mini-roundabout. The planned improvements to this section of the roadway will require the relocation of approximately 700 feet of the overhead three phase electric utility feeder line designated SS-33 and various service taps. BACKGROUND SS-33 runs along the east side of CR 79 in the project area, and consists of standard overhead three phase construction with 336 all aluminum phase wire and a 1/0 neutral. DISCUSSION Staff has reviewed the construction plans for the right of way improvements and has determined: This section of SS-33 must be relocated due to the planned road improvements. The estimated cost to construct replacement overhead facilities and to remove the existing lines and power poles that have to be relocated is$25,000 including removal. The cost for construction of new overhead facilities plus removal and retirement of the existing overhead facilities that have to relocated would be absorbed as an operating expense. The estimated cost to relocate this section of SS-33 underground would be approximately$44,500, including removal. The removal cost would be absorbed as an operating expense. Should the City Council, under their right of way management authority, order the relocated facilities be placed underground the additional cost of$19,500 ($44,500-$25,000), per Commission policy, would be funded out of the Underground Relocation Fund. RECOMMENDATIONS Staff recommends: 1. The Commission accepts the estimated costs to relocate overhead facilities due to the planned 2014 CR 79/Spencer Street and Vierling Drive intersection road improvement project. 2. The Commission directs staff to forward the estimated costs to the Council to aid the Council in making their determination under the City's Right of Way Management Ordinance whether or not to order the overhead facilities to be relocated underground. REQUESTED ACTION Staff requests the Commission adopt the recommended actions. 8 I 7 I 6 I- 5 j 4 I 3 I 2 I 1 Minnesota Sitriet i _. i ! \ I I 3.3"loaniuta for 500 MCM — I -100ft Bore — 1/0 15kV Splice I 1 1/0 15kV Splice - I I C 3.500 MCM URD 15kV — 20 I 3 00 MCM URD 15kV Slack Span tt-i/O URD 15kV ( I 2-1/0 URD 15kV 20-A&B C j i 5f1 Inside ROW 5fl Inside ROW #2 ACSR ........... F. --- 85T Q10125 I) __ 115ft Span ` .f J to Spent et Street \ ar MGR 791 no sr Y m v--`- Riser Pole 1/0 15kV Splice -Exlsfing 4011 Pole B Riser Pole New Riser Pole -3 Blade Disconnects -Existing 40(t Pole -Existing 4011 Pole r ., '�.... -(2)Cutout Arrester B -Existing In Riser -3e Gang Switch - Assemblies -1 New Cutout Arrester -Double Anchor Guy , -125 Puce on B0 Assembly -125T Fuse on new •12ST Fuse on A0 1 e riser C1 / -Double Anchor Guy I > A w - •�•—CR19SVifWp Or-Me.Rantl•bwt A Rabe.eG Electric 1� Stewopee PeBMC 011Lnl5S kA 8 I 7 I 6 I 5 1. 4 1 1 I ss 3 ,9oPeM I 2 �..: may' �. ;. N' m i W $i F E j II I g !' —— 1 I 1 I a N IN c o n tn _ S — 8 M > M amid V — — F o * ase4d 8 1- les :00 a„,0 6U e-, v aw ill 4 .. .. I ase4d V <. MI • 41 ?1 to ^ri! y - _ ii m N a m N O di f I b' co m ° I o ? m 1 a