Loading...
HomeMy WebLinkAbout5.B.5. Authorize Preparation of Plans for 2008 Cured-In-Place-Pipe (CIPP) Project, Project No. 2008-3 ~ • V ~ CITY OF SHAKOPEE ~ Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Jeff Weyandt, Assistant City Engineer SUBJECT: Authorize Preparation of Plans for 2008 Cured-In-Place-Pipe (CIPP) Project, Project No. 2008-3 DATE: January 15, 2008 INTRODUCTION: This agenda item is to direct staff to prepare plans and specifications for the 2008 CIPP Project, Project No. 2008-3. BACKGROUND: The 2008 Capital Improvement Program (CIP) includes $250,000.00 for the annual cured-in-place pipe project. Staff will evaluate the existing sanitary sewer system and determine which lines should be included in the 2008 project. Over the past two years the City has successfully lined 9,700 feet of sanitary sewer pipe. ALTERNATIVES: 1. Authorize staff to prepare plans and specifications for the 2008 CIPP Project. 2. Do not authorize staff to prepare plans and specifications for the 2008 CIPP Project. 3. Table for additional information. RECOMMENDATION: Staff recommends Alternative No. 1, to authorize the preparation of plans and specifications in order to proceed with the 2008 CIPP Project, as outlined in this memo. ACTION REQUESTED: Authorize staff to prepare plans and specifications for the 2008 CIPP Project, Project No. 2008-3. Jeff Weyandt, P.E. Assistant City Engineer JW/pmp ENGR/2008ENGINEERING-PROJECTS/2008CII'P/ W ORD/MEM-AUTHORIZE-PLANS