SHAKOPEE PUBLIC UTILITIES
MEMORANDUM
TO: SHAKOPEE PUBLIC UTILITIES COMMISSSION
FROM: JOHN R. CROOKS, UTILITIES MANAGER
SUBJECT: LONG TERM INFRASTRUCTURE INVESTMENTS FOR
FUTURE EXTENSIONS OF WATER AND ELECTRIC UTILITIES
DATE: MAY 2, 2014
Over the past 15 years as Shakopee has seen a tremendous influx of
development. Shakopee Public Utilities has been well positioned to address the
utility needs of that growth. Whether it was the residential growth of the early
2000's or the recent large commercial /industrial electric load required to serve
new businesses, SPUC was and continues to be able to meet the water and
electric needs of our present and future customers.
Attached to this memo is information to assure that SPUC is again well
positioned to address proposed developments and expansion in the all areas of
our service territories.
WATER
For review and discussion are the following
Water 5 year CIP schedule
Map of 3 different water pressure zones require to serve Shakopee
Map of present and proposed production and storage facilities.
ELECTRIC
For your review and discussion are the following
Electric 5 year CIP schedule
Map of current substation locations
Map of electrical service territories
LONG TERM PLANNING
Beyond the 5 year CIP, planning is in place to address potential annexations of
Jackson Township. Water service will be provided along with sewer. Electric
service territories are defined by service areas.
Long term planning for the water utility is provided in the 2004 Comprehensive
Water Plan. Long term planning for the electric utility is provided in the 2009
Ultimate Electric System Load Analysis.
55
56 Over Sizing - Non -SPUC Projects (Completed by Others)
57 12" WM C.R. 17 from St. Francis Ave to VV Road 000 %saucmet- ,teteo
SC
2013
-
-
-
-
39
Item Description Reason
Carryover 2014
2015
2016
2017
2016
40
CP
- 69,000
-
-
-
-
41
Reconstruction Fund
- 68,500
-
-
-
-
42
Development
- 40,000
-
-
-
-
43
Reconstruction
- -
121,000
-
-
-
44
Reconstruction City Street Recon
- 675,000
312,000
389,000
377,000
82,000
45
Correct Deficient Services As Needed
- 40,000
40,000
40,000
40,000
40,000
46
Total Reconstruction
- 715,000
352,000
429,000
417,000
122,000
47
Street Project
- -
-
1,710,000
-
-
48
Total Recontruction Fund
- 715,000
352,000
429,000
417,000
122,000
49
- -
-
30,100
-
-
50
Trunk Fund
- -
-
-
45,000
47,000
51
-
-
-
43,680
-
52
Trunk Water Mains - SPUC Projects (Completed by SPUC)
40,000
12 Projects to be determined
Projects to be determined
- 64,000
66,000
68,000
70,000
-
b-
Total Trunk Water Mains - SPUC Projects
- 64,000
66,000
68,000
70,000
-
55
56 Over Sizing - Non -SPUC Projects (Completed by Others)
57 12" WM C.R. 17 from St. Francis Ave to VV Road 000 %saucmet- ,teteo
SC
- 101,700
-
-
-
-
58 18" WM CR 16 (Ridge Creek)
Development
- 90,000
-
-
-
-
59 18" WM C.R. 16 - Zoschke's Addition
CP
- 69,000
-
-
-
-
60 12" WM Valley View Rd, from Evergreen Ln. to Sarazin (eetaseed & SFRMC)
CP
- 68,500
-
-
-
-
61 12" WM Crossings Blvd thru Areas E & F (Ridge Creek)
Development
- 40,000
-
-
-
-
62 12" WM from Foothill Trail South to Muhlenhardl Rd (4800 ft)
- -
121,000
-
-
-
63 12" WM on CR 18 (2400 ft)
- -
61,000
-
-
-
64 16" WM Krystal Addition (800 ft)
- -
57,000
-
-
-
65 12" WM from Area K to Wood Duck Trail (1680 ft)
- -
42,000
-
-
-
66 18" WM CR 16 from Dean Lake Trail to CR 21 1.5 miles
Street Project
- -
-
1,710,000
-
-
67 12" WM CR 78 from VCX to CR 77 via High School 1.5 miles
Development
- -
-
208,000
-
-
68 12" WM West from CR 17 North of Wood Duck Trail (1200 ft)
- -
-
30,100
-
-
69 12" WM C.R. 16 from C.R. 15 west to C.R. 69 - Area X (DR Horton)
Development/CP
- -
-
-
45,000
47,000
70 12" Wm Bluff of Marystown (1600 ft)
-
-
-
43,680
-
l1 12" WM Thrush Street from CR 83 to 0.25 miles West
Development
40,000
12 Projects to be determined
- 64,000
66,000
68,000
70,000
72,000
73 Total Over Sizing - Non -SPUC Projects
433,200
347,000
2,016,100
156,680
159,000
N
75 Total Trunk Fund
497,200
413,000
2,084,100
228,680
159,000
r6
Note: When an area is referenced it is a designated parcel on the map of
the service area, there are no streets in those areas yet.
Page 2 of 3 11/2212013
Page 3 of 3 11/22/2013
2013
78
Item Description
Reason
Carryover 2014
2015
2016
2017
2018
79
80 Connection Fund
81
82 Wells
83 2 -HES Well Site
Location TBD
- -
-
250,000
-
84 2 -HES Jordan Well
Location TBD
-
-
-
680,000
-
85 Total Wells
250,000
680,000
-
86
87 Water Treatment
88 NES Jordan Well #22 Submersible (Pump House No. 3 modifications)
Radium Remediation
- -
798,000
-
-
-
89 Water Treatment Plant
Water Quality
- -
-
-
-
4,654,135
90 Total Water Treatment
- -
796,000
-
-
4,654,135
91
Note: The Water Treatment Plant is not currently needed, It is put Into
the budget as a placeholder as a contingency In the event It becomes
92 necessary.
93
94 Pump House Additions /Expansions
95 2 -HES Pump House
Location TBD
- -
-
-
1,111,000
-
96 Total Pump House Additlons /Expansions
-
1,111,000
-
97
98 New Tanks and Transmission Water Main
99 1 -HES District Storage (2.0 MG, Ground Tank) - Wood Duck Trail
System Needs
- 2,730,000
-
-
-
100 16" WM C.R. 17 South from Area K to Wood Duck Trail
C.R. 17 Projecl/Syslem Needs
- -
773,000
-
-
-
101 2 -HES District Storage (0.5 MG, Elevated Tank)
Location TBD
- -
-
2,010,000
-
102
103 Total New Tanks and Transmission Water Main
2,730,000
773,000
-
2,010,000
-
104
105 Booster Stations
106 2 -HES Bluffs of Marystown Booster Station Site Acquisition
Development
- 150,000
-
-
-
-
107 Booster Station @ Bluffs of Marystown
- -
-
-
1,312,110
-
108 Booster Station @ Tanks 5 & 6 Site
Savage Agreement Expiration
- -
1,100,000
-
-
-
109 12" WM in Jacked Casing Across CR 16
- -
482,000
-
-
-
110 Total Booster Stations
- 150,000
1,582,000
-
1,312,110
-
111
112 Auxiliary Facilities
113 Auxiliary Facilities
- -
-
-
-
-
114 Total Auxiliary Facilities
- -
-
-
1 t Total Connection Fund
Ill
- 2,880,000
3,153,000
250,000
5,113,110
4,654,135
118 Total Water
- 4,470,800
4,599,924
4,049,564
6,987,254
5,150,135
Page 3 of 3 11/22/2013
1HES District -825'-
1HS District -825'
1HES Distract -II25'
i 9 5'
f
I �
is I
i
Proposed Land Use
- 1 HES_District -825'
-- -� — 2HES District -915'
i
i
i � i
W,
sptrc
""r service
center
TANK
1'5 MCI
CITY twq W.'"DAIZ TANK I
TANK 2
NE�,
PH, 4
WEE 4
2 0 IIAIG' 6
20 MIS PH
NES
N S 'qPH
Mill 16
C
Nff P" Id, I
PH 15
F.'L 15 —
/MS RWlt
PH 9 BOOSTER ------- PH
"R&FT A
ELI 21
0 STATION n ,mi
-PH 20
4
NA:" P'Wn"[
V.(_C
imfs
TANK 4
BOOSTER - __O 5 tic,
STATION �J__ 1 HES
w. err evi — — - - -- - - ^--1
N" PW1111
0
CI TY Lw onuNw
TANKS
B
--PH 12
5 & 6
zws P&w" I zwzs &'W'f I#" p1l"ll
, )
NES
FUTURE
W GOUNDW
TANK(S)
AIZAT nirtricJ
Cffl L.1-
spue Water Facilrdes Map
A
MUMMY
SHAKOPEE PUBLIC UTILITIES
SHAKOPEE MN.
jT8
7
6 5 4
3
2 1
2013
49
Item Description
Reason
Carryover
2014
2015
2016
2017
2016
51 Local Area Projects
53 New UG Cables & Related Cost (Net of Contribution)
Load /Development
100,000
110,000
120,000
130,000
140,000
54 Total New UG Cables & Related Cost (New of Contribution)
-
100,000
110,000
120,000
130,000
140,000
55
56 Replace UG Cable Projects
57 Eaglewood Addition
Rellability /Replace Problem Cable
35,000
-
-
-
58 Replace UG Cable Eagle Creek Blvd & CR 18
Reliability/Replace Problem Cable
20,000
-
-
-
-
59 Valley Park Drive & Pump House 4 & 5
Reliability/Replace Problem Cable
-
10,000
-
-
-
-
60 CR 14 & 17
Reliablllly /Replace Problem Cable
-
81000
-
-
-
61 Replace UG Cable - Projects Yet To Be Determined
As Needed
-
551000
55,000
55,000
60,000
60,000
62 Total Replace UG Cable Projects
-
128,000
55,000
55,000
60,000
60,000
64 Rebuild OH Lines
65 SS -34 CR 17 from St. Francis Ave to CR 78 0.75 Ckt. miles
Street Project
44,500
-
-
-
-
-
66 SS -31 CR 17 from Valley View Rd to Dominion Ave 0.50 Ckt. miles
Street Project
39,750
-
-
-
-
-
a7 SS -34 CR 78 from CR 17 to Barrington Or 0.5 miles
Street Project
11,750
-
-
-
-
-
SS -31 CR 78 from CR 17 to Barrington Or 0.5 miles
Street Project
11,750
-
-
-
-
-
bo SS-34 CR 17 from CR 16 to St. Francis Ave 0.25 miles
Street Project
7,500
70 BL -22 CR 101 Frontage Road 0.75 Ckt. miles
Street Project (City Delayed Project to 2014)
-
75,000
-
-
-
71 DL -43 CSAH 17 north of Hwy 169 0.5 Ckt. miles
Street Project
-
43,000
-
-
-
-
72 PL -74 CR 16 from Foothill to Muhlenhardt 0.5 mile
Street Project
43,000
73 Pike Lake Trl S of 42 OH to UG
-
15,000
-
-
-
-
74 SS -33 CR 79 @ Vlerting Drive
Street Project
-
5,000
-
-
-
75 SS -31 CR 17 from Dominion Ave to Wood Duck Tr 0.6 miles
Street Project
43,000
-
-
-
76 PL-73 Oak Circle 0.25 mile
Re-Development
30,000
77 PL -74 CR 16 Pike Lake Road to East 0.25 mile
Development
21,500
78 PL -72 CR 16 from Dean Lake Trail to CR 21 1.25 miles
Street Project
-
-
-
107,500
-
-
79 SS -32 CR 15 from Hwy 169 to 17th Ave 0.5 Ckt. miles
Street Project
-
-
47,000
-
-
80 SH -09 Levee Drive
Street Project
_
_
_
10,000
81 SH -10 Levee Drive
Street Project
_
-
-
-
15,000
82 Rebuild OH lines - as needed RP3
Pole Inspection & Change Out
-
75,000
75,000
75.000
75,000
75,000
83 Total Rebuild OH Lines
115,250
256,000
169,500
229,500
75,000
100,000
84
85 Major System Projects
00
87 Feeder Extension Projects
88 SS -31 CR 17/ VV Road /Sarazin Street 1.0 mile
Load Growth (@ SFRMC)
130,000
-
-
-
-
-
89 East Shakopee Sub Exit Circuits 4.0 miles
Load Growth
290,000
300,000
90 PL -76 CR 21/VV Road to CR 83 New Feeder 2.0 miles
Load IDeveoopmenl (SMSC)
-
290,000
-
-
-
91 PL -75 Hansen Ave CR 21 to Stagecoach Road 0.75 mile
Load Growth
108,750
92 SS -32 Taylor StreeWierling Drive 0.50 mile
Load Growth
-
75,000
-
-
-
93 DL -42 OL Blvd CR 83 to Conellower 0.5 mile
Load Growth
-
-
-
77,500
-
-
94 SS- 3217th Ave Ext, from CR15 to CR691.0 miles
Street Project & Development (Bluffs)
-
_
_
_
160,000
-
95 DL-54 New Feeder DL Sub to 4th Ave 1.25 miles
Development (VVSP)
_
-
-
-
170,000
SS-83 New Feeder SS Sub to CR 17 0.75 mile
Load Growth
_
_
_
_
-
123,750
Projects Yet to be Determined 1.0 mile
As Necessary
140,000
145,000
150,000
155,000
160,000
165,000
98 Total Feeder Extension Projects
270,000
833,750
525,000
232,500
320,000
458,750
100 Assumed Cost per mile unless noted otherwise
140,000
145,000
150,000
155,000
160,000
165,000
Page 2 of 4
11/22/2013
Page 3 of 4 11/2212013
2013
101
Item Description
Reason
Carryover
2014
2015
2016
2017
2018
102
103 Shakopee Substation
104 Land Purchases
Reliablliy /Replacement
-
500.0()o
-
-
-
-
10 5 Planning/Deslgn/Project Management
Reliability /Replacement
150,0 00
400,000
240,000
-
-
-
106 Construction
Reliability /Replacement
-
1,01)0,000
2,300,000
-
-
-
107 Total Shakopee Substation
150,000
1,900,000
2,540,000
-
-
108
109 East Shakopee Substation
110 Land Purchases
Load Growth
-
250,000
-
-
-
111 Planning/Design/Project Management
Load Growth
-
500,000
300,000
-
-
-
112 Construction
Load Growth
-
1,000,000
2,300,000
-
-
-
113 Total East Shakopee Substation
-
1,750,000
2,600,000
-
114
115 Pike Lake Substation
116 Add Circuit Breakers and Relays
Load Growth
-
250,000
-
-
-
-
Total Pike Lake Substation
-
250,000
-
-
-
a Territory Acquisition
120 Territory Acquisition
475,120
121 Total Territory Acquisition
475,120
-
-
-
122
123 Upgrade Projects
124 Projects yet to be determined
150,000
155,000
160,000
165,000
170,000
175,000
125 Total Upgrade Projects
150,000
155,000
160,000
165,000
170,000
175,000
126
127 ADVANCED METERING INFRASTRUCTURE(AMI)
128 Planning/Deslgn/Project Management
Project Planning/Design
-
-
100,000
100,000
100,000
-
129 Constmclionl Implementation /Hardware /So0ware /Training
Customer Service
-
-
530,000
1,700,000
1,700,000
-
130 Total ADVANCED METERING INFRASTRUCTURE (AMI)
-
630,000
1,800,000
1,800,000
-
131
132 Service Center
133 Replace Back Gate Opener
Replace Problem Gale
-
15,000
-
-
-
134 Landscaping In Courtyard Area
-
15,000
-
-
-
-
135 Front Sign Refurbish
6,000
-
-
-
-
136 Outside Painting/Wood Beam
Mainl. Of Exterior
-
5,000
-
-
8,000
-
137 Service Center Roof Maintenance
Maintenance of Roof
-
-
10,000
-
-
-
138 Storage Yard Lighting and Security
Update Lighting and Security
10,000
-
-
-
139 Miscellaneous Building Improvements/Replaoements
Maktt. & Requested Changes
-
30,000
45,000
45,000
45,000
45,000
140 Total Service Center
71,000
65,000
45,000
53,000
45,000
141
142 Total Operating Fund
605,250
6,712,570
7,741,500
3,564,000
3,474,000
1,911,750
Page 3 of 4 11/2212013
,., i Total Relocation Fund
162
163 Total Electric
97,500 108,750 109,750 195,000 42,500 143,760
782,750 8,821,320 7,851,250 3,759,000 3,516,500 2,055,500
Page 4 of 4 11/22/2013
2013
143
Item Description
Reason
Carryover
2014
2015
2016
2017 2018
144
Relocation Fund
145
146 Relocation Projects
147
140 SS -34 CR17 from St. Francis Ave to CR78 0.75 Ckt. Miles
Street Project
30,000
-
-
-
- -
149 SS 31 CR17 from Valley View Rd to Dominion Ave 0.50 Ckt. Miles
Street Project
30,000
-
-
-
- -
150 PL -74 CR 16 from Foothill to Muhlenhardt 0.50 Miles
Street Project
-
45,000
-
-
- -
151 SS -33 CR 79 @ Vlerling Drive
Street Project
-
25,000
-
-
- -
152 DL -43 CSAH 17 north of Hwy 169 0.50 Ckt. Miles
Street Project
-
-
38,750
-
- -
153 SS -31 CR17 from Dominion Ave to Wood Duck Tr 0.50 Mlles
Street Project
-
-
31,000
-
- -
154 PL -72 CR 16 from Dean Lake Trail to CR 21 1.25 Miles
Street Project
-
-
-
112,500
-
155 SS -32 CR15 from Hwy 169 to 17th Ave 0.50 Ckt. Miles
Street Project
-
-
-
41,250
- -
156 SH -09 Levee Drive
Street Project
-
-
-
-
- 50,000
157 SH -10 Levee Drive
Street Project
-
-
-
-
- 50,000
158 Projects Yet to Be Determined 0.50 Ckt. Miles
As Necessary
37,500
38,750
40,000
41,250
42,500 43,750
Total Relocation Projects
97,500
108,750
109,760
195,000
42,500 143,750
,., i Total Relocation Fund
162
163 Total Electric
97,500 108,750 109,750 195,000 42,500 143,760
782,750 8,821,320 7,851,250 3,759,000 3,516,500 2,055,500
Page 4 of 4 11/22/2013
7 6 5 4 3 2
MV( tw MOM
JS
0,—..
PP L J1
D
MVEC Xce I
D
J
101"
,,Xcel
xce I . l�
spu
C
MVEC
C
ewxuwr
W_ T-1-Y WK
spu
B
MVEC
MVEC :MVEC
SF1U
SrDu
MW MVEC
MAW
spu MVEC
A
A
SPUC Electric Service Territory
SHAKOPEE PUBLIC UTILITIES
SHAKOPEE, MN.
JIB
4 3 2
6 5 4 3 2
MAMPE E SUB MVEC
SPL)
D
MVEC Xce(
PE4.tV L4AT �".Xcet
spu xce'�
SbB' 1&0 M11-f L4A--
.-I SPB\Sp[j
t
MVEC
PIAT L4AE
SUB AE
I
spu
r
B
MVECS-• c y
sol'rff
B
I MVEC
SUB 1&-9 S P U
rj
sf mlu
Ll spu—"j
i m uw, MVEC
Im"m
i
i spu MVEC
A
SPUC Electric Service Territory
A
SHAKOPEE PUBLIC UTILITIES
SHAKOPEE, MN.
I
MVEC —j%
MI: m
8 7 6 5 4 3 2