Loading...
HomeMy WebLinkAbout7.B. Award a Contract for the Southbridge Community Park Development and Lion'spwtA SHAKOPEE TO: Mayor and City Council Mark McNeill, City Administrator General Business FROM: Jamie Polley, Parks, Recreation & Natural Resources Director DATE: 04/29/2014 SUBJECT: Award of Contract for the Southbridge Community Park Development and Lion's Park Tennis Court Improvements Project, Project No. PR2014 -1 & 2014 -6 - Res. No. 7443 (A) Action Sought The City Council is asked to offer Resolution No. 7443, A Resolution of the City of Shakopee Accepting Bids for Construction of Southbridge Community Park and Lion's Park Tennis Court Improvements to K.A. Witt Construction, Inc. and provide direction to staff on project alternates. Background On February 18, 2014 the City Council approved the final design for Southbridge Community Park and authorized the advertisement for bids. The base bid estimate for the park was at $998,100 including the construction of the shelter /warming house and hockey rink board /fencing by the City, reusing lights donated by Valleyfair for the hockey rink, and the oversizing of the fire lane ($40,000) to be funded outside of the Park Reserve Fund. The base bid for the park includes the parking area, dog park fencing with maintenance gates, aggregate trails within the dog park, drinking fountain, paved trail along the parking lot, preparation of the hockey rink, aggregate interior trail (as recommended by the PRAB), utilities to the building area and the emergency connection to the town homes. A 5% contingency is typically added to the base bid. The City Council directed staff to reduce the size of the dog park to 10 acres and directed staff to include the following alternates to be part of the bid document (numbering is how the items were numbered on the bid tab): Al. Construct the exterior trail of the park A2. Stockpile Excess Soils at Quarry Lake Park A3. Soils corrections beneath the alternate exterior trail A4. Paving the interior asphalt trail A5. 6" concrete pavement for hockey rink A6. Dog Park shelter structure AT Interior park shelter A8. Additional all -breed dog trail (SW corner) A9. Boardwalk through wet area A 10. Aggregate for small dog area A 11. Stabilization for dog park trails A 12. Native Landscape 5 -year maintenance & enhancement plan In addition, on March 4, 2014, the City Council approved the plans and specifications for improvements to Lion's Park tennis courts. The City Council authorized staff to bid the Lion's Park Tennis Court Improvement Project with the Southbridge Community Park Development. The tennis court improvements is a project planned on the Park Asset CIP and reduces the courts from 4 to 2 and adds an accessible parking lot to the the site. Recommendation The bids for Southbridge Community Park and the Lion's Park Tennis Courts Improvements were opened at 1:00 p.m. on Tuesday, April 22, 2014. A letter from the consultant and the bid tabulation is attached. There were five bids submitted and the low bidder is K.A. Witt Construction, Inc. with a total base bid for the park of $582,845.00 and $212,232.10 for the Lion's Park Tennis Courts. There are three items that will be completed or organized by City Staff. The amount of each item was included in the base bid estimate but was not included in the contract bid. The Parks Department has agreed to take on tasks 1. & 2. below. These items will be completed as time and staffing allows. 1. Hockey boards and hockey fencing to be installed by the City's Public Work's Department 2. Shelter /Warming house to be constructed by the City's Public Work's Department 3. Utilize donated lights from Valleyfair for hockey rink Staff is recommending awarding the contract for Southbridge Community Park and Lion's Park Tennis Courts to K.A. Witt Construction, Inc. with alternates A1, A3, A4, A6, A8 -A9 and A10. The Parks and Recreation Advisory Board has not made a recommendation on this bid as they have not yet seen the results. K.A.Witt Construction, Inc has successfully completed projects in the past for the City of Shakopee including the site work for Huber Park. Budget Impact The City Council has directed staff to keep the park total under $1 Million. The current estimated balance of the Park Reserve CIP is $1.3 Million with an estimated $1.1 Million in park dedication to be received in 2014. The main components of this budget include: earthwork/site restoration, trails, paved parking, fencing, hockey rink, park structures and utility connections to the building pad. Other amenities include hockey lighting, pedestrian lighting, and potential pay station. $15,000 is budgeted for staff time (Engineering/Public Works will provide some of the Construction Administration), testing, and Trunk Water Charges (estimated). A 5% project contingency is also factored into the budget. The Engineer's estimate of the base bid for the park was $998,100 which includes all of the amenities in the City Council approved plan but not the 5% contingency. The low bid of $582,845 by K.A.Witt Construction, Inc. plus the work to be completed by the City and not including the 5% contingency totaling $791,495 is under the project estimate. The second low bid by Northwest Asphalt, Inc. of $681,532.50 plus the work to be completed by the City and not including the 5% contingency totaling $899,432.50 was also under the project estimate. Adding any of the alternates to the base bid will not change the low bidder. The project was bid with twelve alternates to try to ensure it would be awarded within budget. Since the base bids came in so favorable and under budget, staff is recommending the addition of several of the alternates to the base bid. The Council is asked to review the total bid, as well as the bid alternates and determine which, if any alternates should be approved. As per City Standard Specifications, quantities may be reduced before or after the award of the bid. Alternates K.A. Witt Al. Asphalt Paving with Base for 8' Wide Standard Trails (Exterior Loop) $40,690 A2. Not Applicable (Soils will stay on site) A3. Import Granular Borrow for Soils Corrections beneath pavements $51,200 ' A4. Asphalt Paving for 8' Wide Standard Trails (Interior Loop) $13,300 A5. 6" thick Concrete Pavement for Hockey Rink $83,950 A6. Dog Park Shelter Structure $20,500 AT Internal Park Shelter Structure $19,000 A8. Alternate All -Breed Dog Trail $6,400 A9. 36" Wide Dog Park Boardwalk $11,000 A10. 9' wide X 6" depth Class 5A Aggregate (small break area $4,736 Al 1. Stabilized Aggregate Dog Park Trail $135,000 Al2. Native Landscape 5 -year maintenance & Enhancement Plan $35,400 Staff is recommending the approval of alternates A1, A3, A4, A6, A8 -A9 and A10 to construct the park within budget while including the greatest number of amenities for the users. The bid total for K.A. Witt Construction, Inc. with the alternates is $730,671 if the hockey rink is unpaved and the stabilized aggregate is not used. The total park estimate is $939,321 plus 5% contingency totals $986,287.05. This estimate is $13,712.95 under budget. If the Council chooses to accept any or all of the alternates the low bidder does not change. The City Council should consider the addition of the stabilized aggregate for the dog park trails. This aggregate would enhance the quality and durability of the trails in this very sandy site. The additional cost for the stabilized aggregate is $135,000. The Lions Park Tennis Court Improvements will be funded from the Park Asset Fund. The current estimate for this project from the Park Asset Fund CIP is $350,000.00. The low bid from K.A. Witt Construction, Inc. of $212,232.10 is $137,767.90 under the estimated budget. Alternatives 1. If desired, offer Resolution No. 7443, A Resolution of the City of Shakopee Accepting Bids for Construction of Southbridge Community Park and Lion's Park Tennis Courts to K.A. Witt Construction, Inc. or 2. Offer Resolution No. 7443, A Resolution of the City of Shakopee Accepting Bids for Construction of Southbridge Community Park and Lion's Park tennis courts to K.A.Witt Construction Inc. with desired alternates as follow: a. A 1 - Exterior asphalt trail loop b. A3 - Soils corrections c. A4 - Paving interior trail segment through the park d. A6 - Dog Park shelter structure e. A8 -A9 - Alternate dog park trail with boardwalk f. A 10 - Aggregate surfacing for the small breed dog park trails 3. Reject the low bid and award the bid to another qualified bidder. 4. Reject all bids. Relationship to Vision A. Keep Shakopee a safe and healthy community where residents can pursue active and quality lifestyles. Requested Action If Council concurs, Offer Resolution No. 7443, A Resolution of the City of Shakopee Accepting Bids for Construction of Southbridge Community Park and Lion's Park Tennis Court Improvements to K.A. Witt Construction including alternates A1, A3, A4, A6, A8 -A9 and A10, and move its adoption. Attachments: Resolution 7443 Consultant Letter SCP Bid Tab Lions Park Bid Tab RESOLUTION NO. 7443 A Resolution Accepting Bids for Construction of Southbridge Community Park and Lion's Park Tennis Court Improvements Project No. PR2014 -1 and 2014 -6 WHEREAS, pursuant to an advertisement for bids for Construction of Southbridge Community Park and Lion's Park Tennis Court Improvements Project No. PR2014 -1 and 2014 -6, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: K.A. Witt Construction, Inc. Northwest Asphalt, Inc. Sunram Construction, Inc. Blackstone Contractors, LLC. Fitol Hintz Construction, Inc. Southbridge Park Lions Park $582,845.00 $212,232.10 $681,532.50 $246,954.45 $704,337.75 $276,109.00 $841,669.74 $306,351.52 $899,907.50 $283,637.25 AND WHEREAS, it appears that K.A. Witt Construction, Inc., 1530 West 280th St New Prague, MN 56071 is the lowest responsible bidder. AND WHEREAS, the contract shall include the alternates as listed; Alternate 1; Exterior asphalt trail loop $40,690.00 Alternate 3; Soils corrections $51,200.00 Alternate 4; Paving interior trail segment through the park $13,300.00 Alternate 6; Dog Park shelter structure $20,500.00 Alternate 8 -9; Alternate dog park trail with boardwalk $17,400.00 Alternate 10; Aggregate surfacing for the small breed dog park trails $4,736.00 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA: 1. The appropriate City officials are hereby authorized and directed to enter into a contract with K.A. Witt Construction Inc. in the name of the City of Shakopee for the Construction of Southbridge Community Park, Project No. PR2014 -1 and Lion's Park Tennis Court Improvements, Project No. 2014- 6, according to the plans and specifications ordered by the City Council and on file in the office of the City Engineer. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted in adjourned regular session of the City Council of the City of Shakopee, Minnesota, held this day of '2014. Mayor of the City of Shakopee ATTEST: City Clerk WSB & Associates. Inc. Engineering ■ Planning ■ Environmental ■ Construction April 25, 2014 City of Shakopee Attn: Jamie Polley 1255 Fuller Street Shakopee, MN 55379 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 -541 -4800 Fax: 763- 541 -1700 Re: Recommendation to accept bid for the Southbridge & Lions Park Project A total of 5 bids were received for these park improvement projects resulting in a low bid from a reputable company. Three bids came in under the engineer's estimate and two bids came in higher than the engineers estimate. WSB & Associates, Inc. has reviewed the submitted bids and made corrections to any mathematical errors. Changes in math did not affect the outcome of the overall low bidder. We recommend that the City execute a contract with K.A. Witt Construction for the Base Bid of Lions Park Tennis Courts, the Base Bid of Southbridge Community Park, plus any of the Add Alternate bid items that the City feels are of importance due to the highly favorable bid numbers that came in. We also recommend setting aside a minimum construction contingency of 5% of the construction budget to allow for any unknowns on the sites that may require changes during construction. Lions Park Tennis Court: The final Base Bid amount is as follows: K.A. Witt Lions Park Base Bid Total: $212,232.10 Southbridge Park: The final Base Bid amount and select Add Alternates to consider, along with additional project fees and deductions, are as follows: Minneapolis ■ St. Cloud Equal Opportunity Employer K.A. Witt Southbridge Base Bid Total: $582,845.00 Additional Project Fees (hockey rink lighting, boards, warming house): $225,000.00 A1: Exterior asphalt trail loop $40,690.00 A3: Soils Corrections (used only as needed) $51,200.00 A4: Paving the interior trail segment through the park $13,300.00 A6: Dog park shelter structure $20,500.00 A8 — A9: Alternate Dog Park Trail with Boardwalk $17,400.00 A10: Aggregate surfacing for the small breed $4,736.00 Minneapolis ■ St. Cloud Equal Opportunity Employer Page 2 dog park trails Potential Project Deductions ($36,350.00) Southbridge Total Project Budget: $919,321.00 It has been a pleasure working with the City on this project and I eagerly look forward to seeing this project move ahead into construction. If you have any questions or concerns, please call me at (763)231 -4848. Sincerely, WSB & Associates, Inc. Candace C. Amberg, RLA Senior Landscape Architect BID TABULATION DETAIL SOUTHBRIDGE PARK DEVELOPMENT CITY OF SHAKOPEE, MINNESOTA OWNER: City of Shakopee 129 South Holmes Street Shakopee, MN 55379 SUBMIT TO / BID OPENING LOCATION: Attn: City Engineer City of Shakopee 129 South Holmes Street Shakopee, MN 55379 I hereby certify that this is an exact reproduction of bids received Landscape Architect: Candace Ambers, Protect Manager PROJECT CONSULTANT: WSB & Associates, Inc. 701 Xenia Ave. South -Suite 300 Minneapolis, MN 55416 BID SUBMITTAL TIME: Time: 1:00 Am Date: April 22, 2014 Denotes Corrected Figure Units Lenard: LS = Lump Sum, SF = Square Feet, BY = Square Yard, EA = Each, LB = Pound, PAIR = Pair LF = Lineal Feet, FSF = Facial Square Feet, CY = Cubic Yard (in place measure), TN = Ton, GAL= Gallon Northwest Asphalt, Sunram Construction, Blackstone Fitol Hintz LA -E Estimate KA Witt Construction Inc. Inc. Contractors, LLC Construction, Inc. BASE BID SCHEDULE: No. Section 1 - Earthwork and Utilities Estimated Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid (In In Dollars In Dollars In Dollars (In Dollars In Dollars)In Dollars In Dollars In Dollars In Dollars In Dollars In Dollars)In Dollars On -site Earthwork - complete, including: l) stripping. stockpiling, respreading, and fine grading all topsoil to required minimum depths indicated; 2) common excavation and placement of all soil and subsoil materials to subgrade elevations in all work areas including any nunining and placement of suitable on-site soils for soils corrections; 3) subsoil compaction beneath trails, concrete. pavements, etc.; 4) grade maintenance as necessary for duration of construction period: 5) 1.01 temporary emsion control measures as noted on plan sheers to prevent migration of g,000 CY $8.00 $64,000.00 $9.65 577.2UU.ou $12.00 $96,000.00 $5.25 $42.000.00 $21.50 5172,000.00 $17.00 S136,000.00 soils to down -slope locations, including maintenance during construction period - NOTE: this item does NOT include emsion control silt fencing but DOES require the Contractor have a certified emsion / sediment inspector / installer on staff for the duration of the project for installations and weekly inspections of all emsion control methods to meet the NPDFS requirements. 102 MobilizationhaTraffic Control for oft hepmject- complete of (NOTE: this shall not exceed 5 % of the total Contract amount). 1 LS $30.000.00 $30,000.00 $12,000.00 $12,000.00 $30,000.00 $30,000.00 $33.600.00 $33,600.00 $35,000.00 $35.000.00 $35,000.00 $35,000.00 Vegetative Corridor Clearing for dog park hags (approx. 2,200 If x 14' wide) - 1.03 complete, including removal of brush tae fall piles. and existing trees with 2" 1 LS $3,000.00 $3,000.00 $3,300.00 $3,300.00 $3,500.00 $3,500.00 $2385.00 $2,385.00 $9,000.00 59,000.00 $4,290.00 $4,290.00 caliper or less as indicated on plans Vegetative Corridor Clearing for heavy duty trail, interior loop trail and dog park fence along interior loop trail (approx. 2,2001E x 14'-20'width) - complete, 1.04 including removal of bmsh and existing trees with 2" caliper or less as indicated on 1 LS $5,000.00 $5,000.00 $3,300.00 $3,300.00 54,000.00 $4,000.00 $2,385.00 $2,385.00 $13,115.00 $13,115.00 $4,290.00 $4,290.00 fans Tree mid Vegetation Clearing - mass vegetative removal, complex, including 1.15 amoval ofb aw, and existing trees (all give calipers), including removal of 1 LS $6,000.00 $6,000.00 $3,300.00 $3,300.00 $8,000.00 $8,OO2U0 $2.500.00 $2,500.00 $24,5WOO $24,500.00 $5,365.00 55,365.00 rootballs for new work as indicated on plmu Southbridge Park Bid Form 00600 Page- J of 6 Northwest Asphalt, Sunram Construction, Blackstone Fitol Hintz LA -E Estimate KA Witt Construction Inc. Inc. Contractors, LLC Construction, Inc. T 1.06 Curb and Pavement Removal/ Milling as indicated on plans for new -work- I LS $1,500.00 51,500.00 $1,000.00 $1,000.00 $800.00 5800.00 $1,750.00 $1,750.00 $3,000.00 $3,000.00 $265.00 $265.00 complete, including saw cutting pavements as necessary Unit Bid Aggregate Construction Access Drive- complete, including maintenance mid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Qty. 1.07 removal and restoration at project completion I LS $1,200.00 $1,200.00 $1,200.00 $1,200.00 $1.200.00 $1,200.00 $1,200.00 $1,200.00 $1,500.00 $1,500.00 $950.00 $950.00 BioRolls - complete, including nainlenance and remocaVrestora[ion at project log co mpletion co 1,500 LF $8.00 $12,000.00 $3.10 $4,650.00 $2.50 $3,750.00 $4.25 $6,375.00 $4.00 $6,000.00 $4.25 $6,375.00 Import and Place Topsoil / Compost Mixture as indicated on plans aid details - complete, minding loading, transporting, miloading, placement aid compaction. 1.09 Payment shall be based on actual quantity (CV compacted veto=) of material. 1.300 CY $35.00 $45,500.00 $36.65 $47,645.00 $24.00 $31,200.00 $30.50 $39.650.00 $54.18 $70,434.00 $42.60 $55,380.00 Quantity, most be verilicd and approved by the Engineer. Stockpile Excess Soil to a location identified by file Owner in close proximity to to proposed hockey rink (soils to be removed off-site by owner) complete, 1.10 including keeping the stockpile stabilized throughout the construction period and placing 8" bio tells around perimeter (bio rolls not included in this bid item). 7,000 CY $5.00 $35,000.00 $2.75 $19,250.00 $2.00 $14,000.00 $9.60 $67,200.00 $5.25 $36,750.00 $10.50 $73,500.00 Payment shall be based on actual quantity (LV Loose Veto=) of material. Quantity onto be verified and approved by the Engineer. 1 11 Erosion Control Fencing as indicated on plans, includes removal and restoration at p rojem completion - complete 1500 LF $3.00 $4,500.00 $1.80 $2,700.00 $2.20 53,300.O0 $2.50 $3,750.00 $2.50 $3,750.00 $2.65 $3,975.00 Tree Protection Fencing as indicated on plans, includes removal and restoration 1.12 at project completion - complete 600 LF $3.00 $1,800.00 $0.75 $450.00 $3.00 $1,800.00 $2.75 $1,650.00 $7.00 $4,200.00 $4.25 $2,550.00 Catch Basin Inlet Protection as indicated on plans, includes removal at project 119 completion - complete 4 EA $300.00 SL200.00 $150.00 $600.00 $125.00 $500.00 $150.00 $600.00 $150.00 $600.00 $170.00 $680.00 Abandon Existing Water Line & Hydrant along Windsor Drive as indicated on plans, details and specifications - complemmdrepi including all rerching, filling 114 abandoned line with sand, sod restoration and replacing/patching bituminous and I LS $6,000.00 $6,000.00 $9,250.00 $9,250.00 $2,450.00 $2,450.00 $10,300.00 $10.300.00 $3,500.00 $3,500.00 $5,860.00 $5,860.00 curb & gritter as necessary Sanitary Sewer Service for future waning house building as indicated on plans, 1.15 details and spec cations- complete, including 48" manhole with lid, 4" PVC lines l LS $18.000.00 $18,000.00 $8,125.00 $9,125.00 $7.460.00 $7,460.00 $12,700.00 $12.700.00 $7,525.00 $7,525.00 $33,100.00 $33,100.00 and riser, FERNCO connection of existing stub, elements, and MH sign Water Service for future warming house building and drinking fountain as indicated on plans, details and specifications - complete, including connection to 1.16 existing stub, 4"DIP, V HDPE pipe, reducers, RPZ backflory preventer, blowout, 1 LS $24.000.00 $24.000.00 524.815.00 524,815.00 $24,675.00 $24,675.00 $40,000.00 $40.000.00 $14,000.00 $14.000.00 $52,900.00 $52,900.00 meter, all bends, connections and appurtenances, and enclosure Storm Water Service as indicated on plans, details and specifications - complete, 1.17 including (2) 27" catch basin structures with grates, 12" RCP lines, and connection 1 LS $8,500.00 $8,500.00 $8,050.00 $8,050.00 57,950.00 $7,950.00 $27,125.00 $27,125.00 $9,440.00 $9,440.00 $15,350.00 515,350.00 to existing catch basin Site Electrical Work as indicated on plans, details and specifications - complete 1.18 for service to the wamdng House building, hockey rink lighting & parking lot I LS 540.000.00 $40,000.00 149,500.00 $49,500.00 $76,000.00 $76,000.00 563,000.00 $63.000.00 $61,700.00 $61,700.00 $64,400.00 $64,400.00 lighting Section 1 Toted: ti3o7,2on.00 $276,335.00 $31fi 5145.00 5358,1711,110 5.076,1114.00 $5011,230.00 Nn. Section 2 - Pavement &Surfacing Estimated Unit Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Qty. (In Dollars) (In Dollars) (In Dollars) (In Dollars) ([n Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) ([n Dollars) (In Dollars) Southbridge Park Bid Form 00500 Page -2 of6 Northwest Asphalt, Sunram Construction, LA -E Estimate KA Witt Construction Inc. Inc. Blackstone Fitol Hintz Contractors. LLC Construction. Inc. No. Heavy Duly Asphalt Paving with Base for Parking Lot -complete, including 1.5" Estimated Unit Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid 1vh1DOT SPWEB 2408 wearing course mixture over tack coat over 2.5" MnDOT Qty. (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) In Dollars) (In Dolh -) 2.01 SPNWB 2308 turn- wearing course over 8" thick compacted MnDot 3139 Class SA 3,300 SY $28.00 $92.400,00 $22.05 $72,765.00 524.35 $90,355.00 $21.25 $70,125.00 $28.56 $94,248.00 $30.00 $99,000.00 or 7 Aggregate Base. The 2' wide aggregate shoulder along the parking lot in areas not contained by curb is considered incidental to parking lot paving. Asphalt Paving with Base for Heavy Duty Dog Park Access Trail - complete, 202 including 1.5" MnDOT SPWEB 240B wearing course mixture over tack coat over 2.5" MnDOT SPNWB 230B non - wearing course over 8" thick compacted MnDot 350 SY $28.00 $9,800.00 $23.50 $8,225.00 $36.10 $12,635.00 $22.25 $7,787.50 $35.70 $12,495.00 $38.00 $13,300.00 3138 Class SA or 7 Aggregate Base Asphalt Paving with Ban for Heavy Duty Fire Lane Trail - complete, 2.03 including 1.5" MaDOT SPWEB 240E wearing course mixture over tack coat over 2,000 SY $28.00 $56,000.00 $2300 $46,000.00 $28.25 $56,500.00 $22.25 $44.500.00 $28.56 $57.120.00 $30.00 $60,000.00 2.5" NfaDOT SPNWB 2308 non- wearing course ver 8" thick compacted MaDot o 3138 Class 5A or 7 Aggregate Base Asphalt Paving for 8' -]0' Wide Standard Trails as indicated on plans, details 2.04 and specifications - complete, including 2.5" thick MnDOT SPWEB 240B over 6" 950 SY 528.00 $26,600.00 $15.6D $14,820.00 $25.15 $23,892.50 522.25 $21,137.50 $25.50 524,225.00 $27.00 $25,650.00 thick compacted MnDOT Class 7 aggregate base 2.05 10' Wide x Depth Class Aggregate Trail for tnrental park loop as ed itdicated on plain, details attd specifications - complete p d s 2,200 SY $13.00 $28,600.00 $4.80 $10,560.00 $10.35 $22,770.00 $7.15 $15,730.00 $7.75 $17.050.00 $8.15 $17,930.00 2.06 9 wide Depth Cl SA Aggregate for all -breed dog park trails as indicated on details ass ails and specifications - complete 2,200 SY $13,00 $28,600.00 $4.85 $10,670.00 $10.35 $22,770.00 $7.15 $15,730.00 $7.75 $17,050.00 $8.15 $17,930.00 plans, , 207 6" Depth Limestone Aggregate for Hockey Rink as indicated on plane, details 1,700 SY $15.00 $25,500.00 $4.45 $7,565.00 $6.50 $11,050,00 $9.25 $15325.00 $7.75 $13,1750) $8.15 $13,855.00 and specifications 208 Line Striping for the Parking Lot - Paint as indicated on plans. details and specifications - complete I LS $3,000.00 $3,000.00 $1,150.) $1,150.00 5450.) $450.00 S1,500.00 $1,500.00 $2,$$0.(1(1 $2,550.) §1,560.00 51,560.00 2,119 Cast Iron Detectable Warning Plates as indicated on plans, details and specifications •complete 96 SF $50,00 $41800.00 $38.00 $3,648.00 $50.00 $4,800.00 $42.00 $4,032.00 $47.94 $4,602.24 $50.00 54.800.00 2.10 10" thick Concrete for ApronNalley Gutter as indicated on plaits, details and specifications - complete. including 8" Compacted Class 5A aggregate base 650 SF $12.) $7,8).00 $8.50 $5,525.00 $7.50 $4,875.) $12.50 $8,125.00 $6.78 $4,407.) $7.00 $4,550.) 6" thick Heavy Duty Concrete Pavement for Pedestrian Ramps as indicated on 2.11 plans, details and specifications - complete, including G' thick compacted Class 5A 850 SF $7.00 $5,950.00 $6.60 $5,610.00 $6.00 $5,100.00 $7.15 $6,077.50 $5.45 $4,632.50 55.75 $4,887.56 aggregate base 2.12 4" thick Concrete Pavement for standard pads. etc. as indicated on plans, details and specifications - complete, including granular bedding base. 1,600 SF $6.00 $9,600.00 $4.75 $7,6).) $5.) $8.000.00 $6.65 $10.640.) $4.95 $7,920.) $5.25 $8,400.00 2.13 6616 Conercte Curb & Gutter as indicated on plans, details and specifications - complete 160 LF $25.00 $4,000.00 $27.50 $4,400.00 518.50 $2,960.00 $22.00 53,520.00 $17.85 $2,956.00 $19.00 53.040.00 214 Bmplete erete Curh &Gutter as indicated on plans, details and specifications complete 670 LF $22.) $14,740.(1(1 $16.) $10,720.00 $17.00 $11,390.00 $17.85 $11.959.50 $16.27 $10,900.90 $1700 $11,390.00 Section 2 Total: $317,390.00 1 2og.258.00 1 5267,547.50 1 Q36,589.001 5273,231.61 8286,292.511 No. Section 3 - Site Amenities & Miscellaneous Estimated Unit Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Qty. (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) In Dollars) (In Dolh -) Southbridge Park Bid Form 00500 Page - 3 of 6 Northwest Asphalt, Sunram Construction, LA -E Estimate KA Witt Construction Inc. Inc. Blackstone Fitol Hintz Contractors, LLC Construction, Inc. 3 01 H.C. Parking, Do Not Enter, No Tom & No Motor Vehicle Signs as indicated I I EA $300.00 $3,300.00 $170.00 $1,870.00 $175.00 $1,925.00 $200.00 $2,200.00 S150.00 $1,650.00 $200.00 $2,200.00 No. on plans. details and specifications - complete Qty. Unit (In Do[[..) (In Dollars) (lo Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) 3.02 Dog Park Perimeter Post and Wire Fencing as indicated on plans, details and 3.7(K) LF $25.00 $92,500.00 $8.80 $32.560.00 $9.50 $35,150.00 $8.25 $30.525.00 $9.66 $35.742.00 $11.50 $42,550.00 specifications - complete 3.03 Dog Park Perimeter Comer Bracing for post and wire fencing as indicated on 40 EA $160.00 $6,400.00 $220.00 $8,800.00 $55.00 $2.200.00 5300.00 $12.000.00 $56.01 $2,240.40 $215.00 $8,600.00 plans, details and specifications - complete 104 4' High Chain Link Fence as indicated on plans. details and specifications - 80 LF S40.W 53,200.00 $27.50 $2,200.00 542.00 S3.360,00 $73.50 $5,880.00 542.84 $3.427.20 $21.50 51,72010 complete, including all attachments, hardware and concrete fominngs 4.04 4' High x 4' Wide Chain Link Self - Closing Gates as indicated on plam. details 5 AC S1.000.W 54.750.00 54,320.00 $20.520.00 52,400.00 $11.400.00 $4.425.00 $21,016.75 $3.930,00 $18,667.50 $2,580.00 $12,25500 1.05 and specifications - complete, including all attachments. hardware and corcmte 3 EA $150.00 $450.00 $550.00 $1,650.00 5625.00 $1,875.00 $325.00 2975.00 $638.00 $1,914.00 $860.00 $2.580.00 4.05 footings 6 EA S4W.00 $2,400.00 $545.00 $1.27(.00 $400.00 $2,400.00 $525.00 53,15000 $250.00 51,5011.00 $430.00 $2Sxu.b( 4' High x 12' Wide Chain Link Double Maintenance Gates as indicated on 3.06 plan, details and specJcations - complete, including all alaclunents .hardware. 3 EA $600.00 $1,800.00 $990.00 $2,970.00 $1,350.00 54,050.00 $525.00 $1,575.00 $1,377.00 $4,131.00 $1,075.00 $3,225.00 Section 4 Total: locks, and commic footings 1 $37,172.00 1 538,340.00 1 545,223.75 $29,810.50 1 $41,3110.011 3.07 ADA Picnic Table as irdicded on plans, details and specifications - complete, 2 EA $1,600.00 $3,200.00 $2,890.00 $5,780.00 $2.500.00 $5,000.00 $1,050.00 $6,100.00 $2,975.00 $5.950.00 $2,940.00 55,880.00 including all attachments 3,08 Drinking Fountain - complete, as indicated on plans, details and specifications. I EA $7,00000 $7,000.00 S4.250.W $4.25000 $5.500.00 $5.50000 $5.100.00 $5.10000 S7.559, 00 %7.559 00 $5.330 W $5.330.00 including all atachmems and ,rater line hookup, Smtiun 3 Total: 1 $117,85U,00 1 560,080.00 1 S59,060.00 1 $64,355.1111 S62 .1, 13.60 172,065.00 TOTAL BASE BID: $793,190.00 $582,845.00 S681,532.501 I 5704,337.75 $841,669.7) 119899,907.50 ADD ALTERNATE SID SCHEDULE: S- thbiidge Park Bid Form 00500 Page -4 of Estimated Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid Unit Bid Total Bid No. Section 4 - Site Restoration & Landscaping Qty. Unit (In Do[[..) (In Dollars) (lo Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollars) 4.01 Type I Turr Seed with cover amp as indicated on plans, details and specJ ns catio 1.60 AC $4,000.00 S6.400.00 51,070.00 51.712.00 34,100.00 $6,560.00 $1.575.00 f2,520.00 $950.00 $1.520.00 $4,400.00 57,040.00 complete i acluding mainlema ee, until establishment 4.02 Type If Native Seed with corer crop as indicated on plans, details and 400 AC $6,000.00 $24,000.00 $750.00 $3,000.00 $2,800.00 $11,200.00 $2,350.00 $9,400.00 $128.00 $512.00 $3,000.00 $12,000.00 specJcalims - complete, including maintenance until esablislunenl 4.03 Categoq 3 Wood Fiber 2S Erosion Control Blanket made with all tatunl 4.200 SY $3.00 $12,600.00 $1.75 $7.350.00 $1.40 $5.880.00 $1.80 $7,560.00 $1.58 $6,636.00 $1.50 $6.300.00 natertals as indicated on plans, details aMspecifications - complete 4.04 Hydraulic (Hydromulch) Soil Stabiliter for seeded areas as indicated on plans. 5 AC S1.000.W 54.750.00 54,320.00 $20.520.00 52,400.00 $11.400.00 $4.425.00 $21,016.75 $3.930,00 $18,667.50 $2,580.00 $12,25500 details and specifications - complete 4.05 2-12 " cal. B&B Deciduous Tree- complete, as per plans, details and 6 EA S4W.00 $2,400.00 $545.00 $1.27(.00 $400.00 $2,400.00 $525.00 53,15000 $250.00 51,5011.00 $430.00 $2Sxu.b( specificalm. 4.06 8' B &B Deciduous Tana - complete, m per plans_ details and specificatorm 3 EA F $200.00 5600.00 5440.00 $1.320.00 $300.00 $90000 $525.00 51.575.00 ,$325.00 $975.00 $375.00 51.125.00 Section 4 Total: 550,7511.1111 1 $37,172.00 1 538,340.00 1 545,223.75 $29,810.50 1 $41,3110.011 TOTAL BASE BID: $793,190.00 $582,845.00 S681,532.501 I 5704,337.75 $841,669.7) 119899,907.50 ADD ALTERNATE SID SCHEDULE: S- thbiidge Park Bid Form 00500 Page -4 of Northwest Asphalt, Sunram Construction, LA -E Estimate KA Witt Construction Inc. Inc. Blackstone Fitol Hintz Contractors, LLC Construction, Inc. No. Add Alternate Bid Description Estimated Unit Unit Add Bid Total Add Bid Unit Add Bid Total Add Bid Unit Add Bid Total Add Bid Unit Add Bid Total Add Bid Unit Add Bid Total Add Bid Unit Add Bid Total Add Bid Qty. (In Dollars) (In Dollars) (In Dollars) (ht Dollars) (In Dollars) (In Dollars) (In Dollars) (In Dollare) (Is Dollars) (In Dollars) (In Dollars) ([n Dollars) Asphalt Paving with Base for 8' Wide Standard Trails (Exterior Loop) as indicated on plans, details and specifications - complete, including 2.5" duck Al MnDOT SPWEB 2408 wearing course mixture over 6" depth of Class 5A or 7 2.600 SY $30.00 $78,000.00 $15.65 $40.690.00 $28.50 574,100.00 522.25 $57.850.00 $26.75 $69.550.00 $24.70 $64.220.00 aggregate base as per plans, details and specifications Stockpile Excess Soil to a location identified by the Owner in close proxidty to the proposed hockey rink (soils to be retnovrd off-site by owner) complete, A2 including keeping the stockpile stabilized throughout the construction period and placing 8" bin rolls around perimeter thin rolls not included in this bid item). 700 CY $5.00 $3,500.00 $16.00 $7,000.00 $5.00 .83,500.00 $9.60 $6,720.00 $51S $3,675.00 $I0.50 $7.350.00 Payment shall be based on actual quantity (LV Loose Volume) of material. Quantity must be verified and approved by tine Engineer. Import Granular Borrow for Soils Corrections beneath pan emcnts - complete, including transporting, unloading, import, placement and compaction. Payment A3 shall be based on actual quantity (CV compacted volume) of material of imported 4,000 CY $20.00 $80,000.00 $ 12, a(, $51,200.00 $18.00 $72,000.00 $18.95 $75,800.00 $20.15 $80,600.00 $17.00 $68,000.00 material. Quantity most be verified and approved by the Engineer. NOTE: this item does not include utilizing mired on site soils. Asphalt Paving for 8' Wide Standard Trails (interior loop) as indicated on plans, details and specification- complete, including 2.5" thick MnUOT SPWEB A4 2406 which shall include a price adjustment to allow for use of 2,200 SY of Class 1,400 SY $25.00 $35,000.00 $9.50 $13,300.00 $24.50 $34,300.00 $22.25 $31.150.00 $16,60 $23.240.00 $13.45 $18,830.00 7 base in lieu of class 5 limestone aggrogate. A5 6" thick Concrete Pavement for Hockey Rink Surface as indicated on plan, 14,600 SF $9.00 $116,800.00 $5.75 $83,950.00 $7.00 $102,200.00 $7.35 $107,310.00 $12.00 $175,200.00 - $10.00 $146,000.00 details and specifications - complete Dog Park Shelter Structure - complete as per plans, derails and specifications. A6 including con-to footings as per nnanufacturer's specifications, all testing I LS $25.000.00 $25,000.00 $20,500.00 $20,500.00 $23,500.00 $23,500.00 $23,250.00 $23150.00 $23,000.00 523,000.00 $22,000.00 $22,000.00 requirements and internal light as indicated on electrical plats. Refer to plans and specifications for additional information. Internal Park Shelter Structure - complete as per plats, details and Spectficatlons, including concrete footings as per malufaciater's specifications and A7 all testing requirements. Refer to plan and specifications for additional 1 LS $30.000.00 $30,000.00 $19,000.00 $19,000.00 $31,500.00 $31,500.00 $31,400.00 $31.400.00 $23,000.00 $23,000.00 $22,000.00 $22,000.00 indonnetioa Alternate All -Breed Dog Trail - Complete, including all vegetative clearing of a 12' wide corridor (including removal of tree piles), installation of 8' wide x 6" AS depth Class 5 aggregate tmil mud restore with Type 11 seed restoration. (Note: this t.000 LF $15.00 $15,000.00 $6.40 $6,400.00 513.50 $13,500.00 $35.00 $35.000.00 $10.77 $10,770.00 $13.45 $13,450.00 item does NOT include boardwalk or trail stabilization) 36" Wide Dog Park Boardwalk as needed for wet areas in the dog park area, A9 complete including all materials, footer plates and fabrication 100 LF $30.00 $3,000.00 $110.00 $11,000.00 $100.00 $10,000.00 $100.00 $10.000.00 $185.00 $18.500.00 $315.00 $31,500.00 9' Wide X 6" Depth Class 5A Aggregate for small breed dog park trails as A10 indicated on plans, details and specifications 740 SY $15.00 $11,100.00 $6.40 $4,736.00 $12.00 $8,880.00 $7.15 $5,291.00 $11.66 $8,628.40 $9.25 $6,845.00 ADDENDUM M3: Stabilized Aggregate Dog Park Trails - complete, to include 3" depth of decomposed granite (pewter color) with Stabiltrauon Bider, The All Original Natural Bider, which shall include a price adjustment to allow for 430 TN $300.00 $129,000.00 $31395 $135.000.00 $200.00 $86,000.00 $125.00 553,750.00 $300.00 5129,000.00 $245.00 $105,350.00 utilizing 4,000 sy of Class 7 base at a 4" depth in lieu of 4,000 sy of Class 5 limestone aggregate at a 6" depth. Al2 Native Landscape 5 -year Maintenance & Enhancement Plan 12 AC $2,000.00 524,000.00 $2,950.00 $35,400.00 $2,600.00 $31,200.00 $2,500.00 $30,000.00 $13,750.00 $165,000.00 $3,400.00 540,800.00 Southbridge Park Bid Form 00600 Page -5 of6 Northwest Asphalt, Sunram Construction, Blackstone Fitol Hintz LA -E Estimate KA Witt Construction Inc. Inc. Contractors, LLC Construction, Inc. A M...."te total: $550,400.00 $428,176.00 1 $490.680.00 $730,163.40 2546,345.00 END OF 01D SCHEDULES Southbridge Park Bid Form 00500 Page - 6 of 6 WSB & Associates, Inc. WSB Project Bid Abstract Project Name: SHAK - Southbridge Park Contract No.: Development Client: City of Shakopee Project No.: 01756 -11 Bid Opening: 4122/2014 1:00 PM Owner: Minneapolis 4/24/2014 Project: 01756 -11 - SHAK - Southbridge Park Development Engineers Estimate K. A. Witt Contruction, Inc. Northwest Asphalt, Inc. Sunram Construction Item No. I Item JUnits Quantity Unit Price Total Price I Unit Price JTotal Price I Unit Price JTotaIPrice Unit Price Total Price LION'S PARK TENNIS COURT IMPROVEMENTS 1 2021.501 MOBILIZATION LUMP SUM 1 $32,200.00 $32,200.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $14,200.50 $14,200.50 2 2101.502 CLEARING TREE 12 $500.00 $6,000.00 $200.00 $2,400.00 $180.00 $2,160.00 $160.00 $1,920.00 3 2101.507 GRUBBING TREE 12 $300.00 $3,600.00 $84.00 $1,008.00 $75.00 $900.00 $110.00 $1,320.00 4 2104.501 REMOVE CHAIN LINK FENCE LIN FT 464 $10.00 $4,640.00 $3.90 $1,809.60 $4.00 $1,856.00 $5.75 $2,668.00 5 2104.501 REMOVE CONCRETE CURB AND GUTTER LIN FT 70 $3.00 $210.00 $6.00 $420.00 $3.00 $210.00 $12.00 $840.00 6 2104.503 REMOVE CONCRETE WALK SO FT 210 $3.00 $630.00 $1.50 $315.00 $1.00 $210.00 $2.50 $525.00 7 2105.501 COMMON EXCAVATION (P) CU YD 3125 $11.50 $35,937.50 $6.75 $21,093.75 $11.00 $34,375.00 $14.70 $45,937.50 8 2105.507 SUBGRADE EXCAVATION (EV) CU YD 100 $16.00 $1,600.00 $8.00 $800.00 $20.00 $2,000.00 $20.00 $2,000.00 9 2105.522 SELECT GRANULAR BORROW MOD 12% (CV) CU YD 1145 $8.00 $9,160.00 $15.25 $17,461.25 $18.50 $21,182.50 $18.95 $21,697.75 10 2105.525 TOPSOIL BORROW (CV) CU YD 260 $50.00 $13,000.00 $22.85 $5,941.00 $24.00 $6,240.00 $32.00 $8,320.00 11 2105.604 GEOTEXTILE FABRIC TYPE V SO YD 1520 $2.00 $3,040.00 $1.00 $1,520.00 $1.50 $2,280.00 $2.50 $3,800.00 12 2211.501 AGGREGATE BASE CLASS 5 (100% CRUSHED LIMESTONE) TON 1410 $20.00 $28,200.00 $14.70.$20,727.00 $16.70 $23,547.00 $21.00 $29,610.00 13 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 310 $5.00 $1,550.00 $3.85 $1,193.50 $3.50 $1,085.00 $3.70 $1,147.00 14 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) - TRAIL TON 35 $135.00 $4,725.00 $94.00 $3,290.00 $80.00 $2,800.00 $84.00 $2,940.00 15 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) - PARKING LOT TON 110 $130.00 $14,300.00 $88.00 $9,680.00 $84.70 $9,317.00 $84.00 $9,240.00 16 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) - TENNIS COURT TON 135 $170.00 $22,950.00 $88.00 $11,880.00 $85.00 $11,475.00 $84.00 $11,340.00 17 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE (3,B) - PATCHING TON 5 $130.00 $650.00 $190.00 $950.00 $250.00 $1,250.00 $350.00 $1,750.00 18 2360.503 TYPE SP 9.5 NON WEARING COURSE MIX (2,B) - TENNIS COURT TON 135 $170.00 $22,950.00 $96.00.$12,960.00 $85.00 $11,475.00 $84.00 $11,340.00 19 2360.503 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,B) - PARKING LOT TON 145 $130.00 $18,850.00 $82.50 $11,962.50 $81.20 $11,774.00 $84.00 $12,180.00 20 2360.503 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B) - PATCHING TON 15 $130.00 $1,950.00 $190.00 $2,850.00 $200.00 $3,000.00 $350.00 $5,250.00 21 2502.541 4" PERF PE PIPE DRAIN LIN FT 330 $11.00 $3,630.00 $12.55 $4,141.50 $10.00 $3,300.00 $20.00 $6,600.00 22 2503.541 12" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 84 $50.00 $4,200.00 $45.00 $3,780.00 $38.00 $3,192.00 $46.00 $3,864.00 23 2503.603 6" HDPE PIPE SEWER LIN FT 83 $22.00 $1,826.00 $15.D0 $1,245.001 $38.001 $3,154.00 $27.00 $2,241.00 24 12506.5021CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL (2'X3') 1EACH 1 $2,000.001 $2,000.00.$1,540.00, $1,540.001 $2,200.001 $2,200.001 $3,200.00 $3,200.00 Project: 01756 -11 - SHAK - Southbridge Park Development Engineers Estimate K. A. Witt Contruction, Inc. Northwest Asphalt, Inc. Sunram Construction Item No. Item Units Quantity Unit Price ITotal Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 25 2506.522 ADJUST FRAME & RING CASTING ( CATCH BASIN) EACH 2 $400.00 $800.00 $450.00 $900.00 $550.00 $1,100.00 $500.00 $1,000.00 26 2506.602 CONNECT INTO EXISTING CATCH BASIN EACH 1 $750.00 $750.00 $1,750.00 $1,750.00 $500.00 $500.00 $900.00 $900.00 27 2521.501 4" CONCRETE WALK SQ FT 150 $10.00 $1,500.00 $5.20 $780.00 $5.00 $750.00 $5.25 $787.50 28 2521.501 6" CONCRETE WALK SQ FT 120 $18.00 $2,160.001 $6.25 $750.00 $6.00 $720.00 $6.30 $756.00 29 2531.501 CONCRETE CURB & GUTTER LIN FT 661 $13.00 $8,593.00 $16.00 $10,576.00 $16.95 $11,203.95 $14.75 $9,749.75 30 2531.603 TENNIS COURT 12" RIBBON CURB LIN FT 464 $14.00 $6,496.00 $14.50 $6,728.00 $16.25 $7,540.00 $14.50 $6,728.00 31 2531.604 10" CONCRETE VALLEY GUTTER SQ YD 50 $64.00 $3,200.00 $66.50 $3,325.00 $62.00 $3,100.00 $95.50 $4,775.00 32 2531.618 TRUNCATED DOMES SQ FT 16 $45.00 $720.00 $38.00 $608.00 $50.00 $800.00 $42.00 $672.00 33 2540.602 TENNIS COURT POSTS AND NETS COMPLETE EACH 2 $1,050.00 $2,100.00 $1,650.00 $3,300.00 $1,400.00 $2,800.00 $1,600.00 $3,200.00 34 2557.602 TENNIS COURT GATE - 10' HEIGHT x 10' WIDE EACH 1 $900.00 $900.00 $1,210.00 $1,210.00 $1,560.00 $1,560.00 $1,350.00 $1,350.00 35 2557.602 TENNIS COURT GATE - 7' HEIGHT x 3'4" WIDE EACH 1 2 $350.00 $700.001 $605.00 $1,210.00 $640.00 $1,280.00 $650.00 $1,300.00 36 2557.603 TENNIS COURT CHAIN LINK FENCING - 10' HEIGHT LIN FT 460 $35.00 $16,100.00 $49.50 $22,770.00 $44.10 $20,286.00 $44.75 $20,585.00 37 2563.601 TRAFFIC CONTROL LUMP SUM 1 $2,500.00 $2,500.00 $500.00 $500.00 $2,500.00 $2,500.00 $2,000.00 $2,000.00 38 2573.601 SITE STORMWATER MANAGEMENT / EROSION CONTROL LUMP SUM 1 $1,500.00 $1,500.00 $750.00 $750.00 $9,500.00 $9,500.00 $1,500.00 $1,500.00 39 2575.605 HYDROSEEDING AND MULCH ACRE 0.5 $8,000.00 $4,000.00 $4,730.00 $2,365.00 $10,000.00 $5,000.00 $6,000.00 $3,000.00 40 2582.501 PAVEMENT MESSAGE (HANDICAPPED SYMBOL) PAINT EACH 2 $400.00 $800.00 $125.00 $250.00 $12.00 $24.001 $400.00 $800.00 41 2582.502 4" SOLID LINE WHITE -PAINT ILIN FT 8801 $2.001 $1,760.00 $0.651 $572.00 $0.35 $308.00 $3.75 $3,300.00 42 12582.601,TENNIS COURT COLOR COAT SYSTEM ILUMP SUM 1 $7,650.001 $7,650.001 $9,920.001 $9,920.00 $9,000.001 $9,000.00 $9,775.00 $9,775.00 Total LION'S PARK TENNIS COURT IMPROVEMENTS: 1 1$300,027.501 $212,232.10 $246,954.45 $276,109.00 Total LION'S PARK TENNIS COURT IMPROVEMENTS: 1$300,027.501 1 $212,232.101 1$246,954.451 $276,109.00 Totals for Project 01756 -11 1$300,027.501 1 $212,232.101 1$246,954.451 $276,109.00 of Estimate for Project 01756 -11 1 1 1 - 29.26% - 17.69% - 7.97% Project: 01756 -11 - SHAK - Southbridge Park Development I I lEngineers Estimate I Fitol -Hintz Construction, Inc. IBlackstone Contractors LLC Item No. I Item jUnits I Quantity I Unit Price ITotal Price jUnit Price ITotal Price I Unit Price ITotal Price LION'S PARK TENNIS COURT IMPROVEMENTS 1 2021.501 MOBILIZATION LUMP SUM 1 $32,200.00 $32,200.00 $12,000.00 $12,000.00 $25,000.00 $25,000.00 2 2101.502 CLEARING TREE 12 $500.00 $6,000.00 $175.00 $2,100.00 $250.00 $3,000.00 3 2101.507 GRUBBING TREE 12 $300.00 $3,600.00 $120.00 $1,440.00 $250.00 $3,000.00 4 2104.501 REMOVE CHAIN LINK FENCE LIN FT 464 $10.00 $4,640.00 $4.25 $1,972.00 $6.65 $3,085.60 5 2104.501 REMOVE CONCRETE CURB AND GUTTER LIN FT 70 $3.00 $210.00 $4.25 $297.50 $10.00 $700.00 6 2104.503 REMOVE CONCRETE WALK SQ FT 210 $3.00 $630.00 $2.10 $441.00 $1.00 $210.00 7 2105.501 COMMON EXCAVATION (P) CU YD 3125 $11.50 $35,937.50 $16.00 $50,000.00 $18.25 $57,031.25 8 2105.507 SUBGRADE EXCAVATION (EV) CU YD 100 $16.00 $1,600.00 $16.00 $1,600.00 $25.00 $2,500.00 9 2105.522 SELECT GRANULAR BORROW MOD 12% (CV) CU YD 1145 $8.00 $9,160.00 $17.00 $19,465.00 $19.00 $21,755.00 10 2105.525 TOPSOIL BORROW (CV) CU YD 260 $50.00 $13,000.00 $18.00 $4,680.00 $55.00 $14,300.00 11 2105.604 GEOTEXTILE FABRIC TYPE V SQ YD 1520 $2.00 $3,040.00 $2.25 $3,420.00 $1.10 $1,672.00 12 2211.501 AGGREGATE BASE CLASS 5 (100% CRUSHED LIMESTONE) TON 1410 $20.00 $28,200.00 $23.65 $33,346.50 $19.50 $27,495.00 13 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 310 $5.00 $1,550.00 $3.25 $1,007.50 $3.06 $948.60 14 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) - TRAIL TON 35 $135.00 $4,725.00 $118.00 $4,130.00 $112.00 $3,920.00 15 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) - PARKING LOT TON 110 $130.00 $14,300.00 $107.50 $11,825.00 $102.00 $11,220.00 16 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) - TENNIS COURT TON 135 $170.00 $22,950.00 $107.50 $14,512.50 $120.00 $16,200.00 17 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE (3,B) - PATCHING TON 5 $130.00 $650.00 $160.00 $800.00 $153.00 $765.00 18 2360.503 TYPE SP 9.5 NON WEARING COURSE MIX (2,B) - TENNIS COURT TON 135 $170.00 $22,950.00 $107.50 $14,512.50 $102.00 $13,770.00 19 2360.503 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,B) - PARKING LOT TON 145 $130.00 $18,850.00 $107.50 $15,587.50 $102.00 $14,790.00 20 2360.503 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B) - PATCHING TON 15 $130.00 $1,950.00 $160.00 $2,400.00 $153.00 $2,295.00 21 2502.541 4" PERF PE PIPE DRAIN LIN FT 330 $11.00 $3,630.00 $11.00 $3,630.00 $11.25 $3,712.50 22 2503.541 12" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 84 $50.00 $4,200.00 $43.00 $3,612.00 $46.96 $3,944.64 23 2503.603 6" HDPE PIPE SEWER LIN FT 83 $22.00 $1,826.00 $38.00 $3,154.00 $25.00 $2,075.00 24 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL (2'X3') EACH 1 $2,000.00 $2,000.00 $3,200.00 $3,200.00 $2,400.00 $2,400.00 25 2506.522 ADJUST FRAME & RING CASTING ( CATCH BASIN) EACH 2 $400.00 $800.00 $270.00 $540.00 $300.00 $600.00 26 2506.602 CONNECT INTO EXISTING CATCH BASIN EACH 1 $750.00 $750.00 $530.00 $530.00 $900.00 $900.00 27 2521.501 4" CONCRETE WALK SQ FT 150 $10.00 $1,500.00 $5.00 $750.00 $4.59 $688.50 28 2521.501 6" CONCRETE WALK SQ FT 120 $18.00 $2,160.00 $5.50 $660.00 $5.20 $624.00 29 2531.501 CONCRETE CURB & GUTTER LIN FT 661 $13.00 $8,593.00 $17.25 $11,402.25 $16.27 $10,754.47 30 2531.603 TENNIS COURT 12" RIBBON CURB LIN FT 464 $14.00 $6,496.00 $17.50 $8,120.00 $16.58 $7,693.12 31 2531.604 10" CONCRETE VALLEY GUTTER SQ YD 50 $64.00 $3,200.00 $65.00 $3,250.00 $61.00 $3,050.00 32 2531.618 TRUNCATED DOMES SQ FT 16 $45.00 $720.00 $51.00 $816.00 $47.94 $767.04 33 2540.602 TENNIS COURT POSTS AND NETS COMPLETE EACH 2 $1,050.00 $2,100.001 $ 350.001 $2,700.00 $1,428.001 $2,856.00 34 2557.602 TENNIS COURT GATE - 10' HEIGHT x 10' WIDE EACH 1 $900.00 $900.001 $1,720.001 $1,720.00 $1,592.00 $1,592.00 I hereby certify that this is an exact reproduction of bids received. Certified By: License No. Date: Project: 01756 -11 - SHAK- Southbridge Park Development Engineers Estimate Fitol -Hintz Construction, Inc. Blackstone Contractors LLC Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 35 2557.602 TENNIS COURT GATE - 7' HEIGHT x 3'4" WIDE EACH 2 $350.00 $700.00 $540.00 $1,080.00 $653.00 $1,306.00 36 2557.603 TENNIS COURT CHAIN LINK FENCING - 10' HEIGHT LIN FT 460 $35.00 $16,100.00 $35.00 $16,100.00 $44.98 $20,690.80 37 2563.601 TRAFFIC CONTROL LUMP SUM 1 $2,500.00 $2,500.00 $1,800.00 $1,800.00 $1,500.00 $1,500.00 38 2573.601 SITE STORMWATER MANAGEMENT / EROSION CONTROL LUMP SUM 1 $1,500.00 $1,500.00 $11,000.00 $11,000.00 $5,000.00 $5,000.00 39 2575.605 HYDROSEEDING AND MULCH JACRE 0.5 $8,000.00 $4,000.00 $7,000.00 $3,500.00 $5,000.00 $2,500.00 40 2582.501 PAVEMENT MESSAGE (HANDICAPPED SYMBOL) PAINT EACH 2 $400.00 $800.00 $48.00 $96.00 $225.00 $450.00 41 2582.50214" SOLID LINE WHITE -PAINT ILIN FT 880 $2.00 $1,760.00 $0.50 $440.00 $0.50 $440.00 42 2582.601 ITENNIS COURT COLOR COAT SYSTEM LUMP SUM 1 $7,650.00 $7,650.00 $10,000.00 $10,000.00 $9,150.00 $9,150.00 Total LION'S PARK TENNIS COURT IMPROVEMENTS: $300,027.50 $283,637.25 $306,351.52 Total LION'S PARK TENNIS COURT IMPROVEMENTS: $300,027.50 $283,637.251 1 $306,351.52 Totals for Project 01756 -11 [$300,027.501 1 $283,637.251 1 $306,351.52 of Estimate for Project 01756 -11 1 1 1 -5.46%1 1 2.11% I hereby certify that this is an exact reproduction of bids received. Certified By: License No. Date: