Loading...
HomeMy WebLinkAbout5.C.3. Ordering Feasibility Report for 2008 Street Improvements Project-Res. No. 6680 6, c. 3 . CITY OF SHAKO PEE CO~JSEr;T Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Jeff Weyandt, Assistant City Engineer SUBJECT: Ordering Feasibility Report for 2008 Street Improvements Project DATE: November 7,2007 INTRODUCTION: Attached is Resolution No. 6680, which orders the feasibility report to be prepared for the following streets: . Norton Drive . Sycamore Circle . Mulberry Circle . All of the streets in the Eaglewood Additions . All of the streets in the Timber Trails Addition . Stonebrooke Drive BACKGROUND: Staff has completed the review of the proposed 2008-2012 Capital Improvement Program which includes street preservation projects on the streets listed above. The above streets have deteriorated and are candidates for bituminous reclamation or overlay. Attached is the CIP sheet identifying the proposed study area for the 2008 Street Improvements Project. In the feasibility report, staffwill investigate street rehabilitation. AL TERNA TIVES: 1. Adopt Resolution No. 6680. 2. Deny Resolution No. 6680. 3. Table for additional information. RECOMMENDATION: Staff recommends Alternative No.1, so that the proposed 2008 Street Improvements Project feasibility study can be initiated for possible construction. ACTION REOUESTED: Offer Resolution No. 6680, A Resolution Ordering a Feasibility Report for the 2008 Street Improvements Project and move its adoption. ~Wr Jeff Weyandt Assistant City Engineer JW/pmp ENGRl2008PROJECTS/2008STREETIMPROVEMENTS/WORDIMEM6680-0RDERING-FEASmILITY RESOLUTION NO. 6680 A Resolution Ordering The Preparation Of A Report On An Improvement To The 2008 Street Improvements Project WHEREAS, it is proposed to improve Norton Drive, Sycamore Circle, Mulberry Circle, all the streets in the Eaglewood Additions, all the streets in the Timber Trails Addition and Stonebrooke Drive by bituminous reclamation and bituminous overlay and all appurtenant work and to assess the benefitted property for all or a portion of the cost of the improvement, pursuant to Minnesota Statutes, Chapter 429. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA, that the proposed improvement be referred to Bruce Loney, Public Works Director, for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvement is feasible and as to whether it should best be made as proposed or in connection with some other improvement, and the estimated cost of the improvement as recommended. Adopted in session of the City Council of the City of Shakopee, Minnesota, held this day of , 2007. Mayor of the City of Shakopee ATTEST: City Clerk ENGRl2008PROJECTS/2008STREETIMPROVEMENTS/IWORDIRES6680-0RDER-FEASmILlTY CIP Projects 2003 - 2008+ City of Shakopee Capital Improvement Program 2008-2012 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2008 Pavement Preservation $770,000 A. Ex enditure Items: 2008 2009 2010 2011 2012 Land & ROW Construction 620,000 Improvements En ineerin IAdmin. 150,000 Total 770,000 - - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 230,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Lev 540,000 Total 770,000 - - - - tf' DescriDtion: .r Bituminous reclamation for Norton Drive, Sycamore Circle and Mulberry Circle in ~ Deerview Acres and the streets in Eaglewood Additions and the Timber Trails Addition. And a bituminous overlay of Stonebrooke Drive. Justification: To rehabilitate bituminous street pavements that have severely deteriorated or are in need of resurfacing. Other Comments: Sewer may be available to the Timber Trail Addition in the next 5 years. Staff has not had any indication that the property owners are interested or are willing to pay for the extension of sewer and water. The proposed project will add 15 years of life to the existing streets. The extension of utilities can be evaluated again around 2023. ODerating Costs: PROJECT LOCATION