HomeMy WebLinkAbout5.C.2. Electric Light Panel Safety and Code Upgrades for Schleper Stadium s. C. L~ CITY OF SHAKOPEE MEMORANDUM CO' ~~.,... ~\'-~ . ~.~~~~r~ I TO: Mayor & City Council Mark McNeill, City Administrator Bruce Loney, Public Works Director FROM: Michael Hullander, Public Works Superintendent DATE: October 16,2007 SUBJECT: Electric Light Panel Safety and Code Upgrades for Schleper Stadium. INTRODUCTION: Public Works is requesting Council to accept the low quote from Gunnar Electric, Inc. for $17,500.00 and direct staff to proceed with the upgrades to the Light Panels at Schleper Stadium. Public Works budgeted $6,000.00 for this upgrade. BACKGROUND: Staff identified a need in the 2007 Park Maintenance Budget to upgrade the Electric Panels for the Light System at Schleper Stadium. This request is to address safety and code issues with the old existing panels. Public Works has contracted with Gunnar Electric, Inc. for many years to provide general electrical maintenance activities at Tahpah Park and Schleper Stadium involving the Field Lighting. In 2006 Gunnar Electric, Inc. was asked to provide us with an informal dollar amount to replace the light panels at Schleper Stadium so we could include the work in the 2007 budget. Without knowing the extent of the project and all the code upgrades needed, Gunnar Electric, Inc. believed $5,000.00 would be enough to cover the upgrades, staff requested $6,000.00 in the 2007 Budget. Due to Public Works not having an electrician, staff asked Mark Houser from Choice Electric to look at the electrical panels and provide us with a recommendation and quote for the replacement and upgrades of the panels. Mark contacted Shakopee Public Utilities and together they came to a consensus on what was needed to address the safety and code issues. Because of the need for more than one quote, Mark was kind enough to share with Gunnar Electric, Inc. the recommendations resulting from the work that he, S.P.U.C and Choice Electric's consultant had done, knowing Choice Electric may not have the lowest quote and be awarded the work. We would like to thank Mark Houser for his time and commitment to this project. The completion of this project will provide a safer, more reliable and user friendly light system for Schleper Stadium. Staff received two quotes for this project and has attached both to this memo. Choice Electric quoted $18,500.00 and Gunnar Electric, Inc. submitted the low quote of $17,500.00. Staff is requesting council to accept the low quote from Gunnar Electric, Inc. for the price of $17,500.00 and direct staff to proceed with the replacement and upgrades to the Electric Light Panels at Schleper Stadium. Staff believes there should be enough funding in the existing park maintenance budget to cover the cost of the project. Should the budget be short at the end of the year, staff will bring back to council a budget amendment for this project. AL TERNA TIVES: 1. Accept the low quote from Gunnar Electric, Inc. for the price of $17,500.00 and direct staff to proceed with the replacement and upgrades to the Electric Light Panels at Schleper Stadium. 2. Deny the request. 3. Table for additional information. RECOMMENDATION: Staff recommends alternative number one. ACTION REOUESTED: Accept the low quote from Gunnar Electric, Inc. for the price of $17,500.00 and direct staff to proceed with the replacement and upgrades to the electric Light Panels at Schleper Stadium. 4~ Michael Hullander Public Works Superintendent Gunnar Electric Inc. 7960 Eden Prairie Rd. Eden Prairie, MN. 55347 (952) 937-9262 (952) 937-1034 fax September 26, 2007 City of Shakopee 400 Gorman St. Shakopee,MN.55379 (952) 233-9555 (952) 233-3807 fax Attn: Bill Egan Re: Electrical quotation for Tapah Park service. Dear Mr. Egan I am pleased to submit the following quotation for your consideration. The following is included: . The electrical permit is included. . Remove the existing 400 amp CT can and associated items. . Install a new 400 amp service entrance switch and CT compartment, manufactured by AMP. . Install 1 lighting control cabinet, manufactured by AMP, with the following installed: . 1-400 amp main circuit breakers . 2-200 amp branch circuit breakers . 5-100 amp branch circuit breakers . 10-20 amp a pole branch circuit breakers . 1-100 amp 10 pole contactor . I-Time clock . 1-100 amp load center w/9-30 amp 1 pole circuit breakers. Price: $17,500.00 Thank you for the opportunity to provide you with this quotation. Sincerely, Laura Karow Master Electrician . .~ep-26-07 05:36A Choice Electric .. .. .. . 9524039220 P.Ol 3080 4th Ave E Shakopee, MN 55379 Phone (952) 445-2625 FaI (952) 403-9220 PROPOSAL To: Bill Egan Company: City of Shakopee Phone: 952-233-9555 Fax Number: 952-233-3807 From: Mark Houser Date: 9/20/2007 Number of Pages: 1 Subject: Tahpah Electric Service Install new 400-amp service Install new main disconnect switch Install new contactors for ball field lights Install new circuit breakers Demo existing panels and contactors Provide permit Our price for the work listed above is $18,500.00 All work to be performed between 7:00 AM and 3:30 PM Please feel free to call with any questions