HomeMy WebLinkAbout13.F.2. Awarding a contract for the City Hall HVAC Unit Replacement/Ventilation Revisions-Res. No. 6653 I~.F.~, CITY OF SHAKOPEE Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Duane Toenyan, Facilities Supervisor SUBJECT: Consider awarding a contract for the City Hall rooftop HV AC unit replacement and ventilation revisions project. DATE: September 4, 2007 INTRODUCTION: Attached is Resolution No. 6653, which accepts the bids and awards a contract for the 2007 City Hall roof top HV AC unit replacement and ventilation revisions. BACKGROUND: On August 8, 2007, City Council approved the plans and specifications provided by M. & E. Engineering and authorized staff to advertise for bids for the 2007 City Hall roof top HV AC unit replacement and ventilation revisions. The project includes: replacement of the unit (more than 30 years old) with one that offers higher efficiency and reliability, and revisions to the ventilation system making it compatible with the new unit, offer higher efficiency and better distribution of air flow in the building. The unit replacement would relieve some heating service from our present, aging boiler since the new root top unit utilizes a much more efficient gas fired furnace. On August 28, 2007, a bid opening was held for the 2007 City Hall HV AC project, in which there were three bids opened for this improvement. The bids are summarized in the attached resolution. The preferred unit is manufactured by Aaon Corp. An alternate was included which would normally offer a deduction for a unit manufactured by Trane. Below is a price comparison of the three bidders: Biddin~ Contractor With Aaon With Trane Associated Mechanical $193,500.00 $196,300.00 Owens Companies $198,676.00 $192,576.00 Pearson Mechanical $266,300.00 No bid In the Building Fund plan for 2007, $110,000 was shown as the estimate for this project. Originally, the estimated cost of the project by M. & E. Engineering was approximately $125,000. The bids ,have corne in at approximately $67,500.00 higher. Some of this difference is attributed to the fact that labor, supplies, and materials prices have gone up since our estimate date. The Aaon unit is preferred over Trane since it offers overall higher quality and can use the refrigerant R-41OA which is the most 'green' for the environment. AL TERNA TIVES: 1. Accept the bid from Associated Mechanical with the Aaon unit since that offers a higher quality, maintenance friendly and environmentally friendly unit at the lowest price. 2. Accept the bid from Owens Companies with the Trane unit since this is the lowest bid, but offers a lower quality unit that doesn't use environmentally friendly refrigerant. 3. Table for further discussion. RECOMMENDATION: Staff recommends alternative number 1 which awards the project to Associated Mechanical and uses the better unit at a cost of $924.00 higher than the lowest bid. ACTION REQUESTED: Offer' Resolution Number 6653, A Resolution Accepting Bids for City Hall Heating, Ventilation, and Air Conditioning Unit Replacement, and move its adoption. Duane Toenyan Facilities Supervisor RESOLUTION NO. 6653 A Resolution Accepting Bids For City Hall Heating, Ventilation, and Air Conditioning Unit Replacement WHEREAS, pursuant to an advertisement for bids for replacing the City Hall heating, ventilation, and air conditioning unit, bids were received, opened on August 28, 2007, and tabulated according to law, and the following bids were received complying with the advertisement: Bidder Aaon Unit Trane Unit Associated Mechanical $193,500.00 $196,300.00 Owens Companies $198,676.00 $192,576.00 Pearson Mechanical $266,300.00 No Bid and, WHEREAS, the Aaon unit offers a higher quality, maintenance friendly and environmentally friendly unit than the Trane unit; and, WHEREAS, it appears that Associated Mechanical, 1257 Marschall Road, Shakop,ee, MN 55379 is the lowest responsible bidder for the HV AC project with the AAON unit. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA: 1. The appropriate City officials are hereby authorized and directed to enter into a contract with Associated Mechanical, in the name of the City of Shakopee for the HV AC Project with the Aaon unit, according to the plans and specifications therefore approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted in session of the City Council of the City of Shakopee, Minnesota, held this day of ,2007. Mayor of the City of Shako pee ATTEST: City Clerk