Loading...
HomeMy WebLinkAbout13.B.1. Approve Plans, Specs and Advertising for Bids for Providence Pointe-Westchester Park-Res. No. 6635 /3.6. L CITY OF SHAKOPEE R t, V is c- i) MEMORANDUM To: City Council, Mayor, and City Administrator From: Andrea Weber, Paiks and Recreation Landscape Designer Meeting Date: August 8, 2007 Subject: Approving Plans and Specifications for Providence Pointe- Westchester Park and Authorization to Advertise for Bidding, Resolution No. 6635 (Revised 8-6-07) INTRODUCTION The City Council is asked to offer Resolution No. 6635, A Resolution of the City of Shakopee Approving Plans and Specifications for Providence Pointe-Westchester Park and Authorize to Advertising for Bidding. DISCUSSION Park Design The site for this park was dedicated for park use in both the Providence Pointe 15t Addition Plat with 5.78 acres along 1 th Avenue, with an adjacent 6 acre parcel in the Westchester Estates Development Plat. Staff held neighborhood open houses on December 12, 2006 and on January 9, 2007 to select and gather input on the final design, which was Option B "Meadow." This design was strongly preferred because it located the playground area further away from 1 th Avenue. The two youth ball fields are adjacent to 1 th Avenue, and hockey and pleasure skating between those two. In addition, a full basketball court will be located either inside the hockey rink, if paved, or else south of the play area next to a sand volleyball court, by Valley View Road. There is a 33-space parking lot along Valley View Road, and on- street parking is also available on Valley View Road, and Basenji Curve. The construction drawings have been modified slightly to accommodate ball field grading, and there have been reductions in site furnishings and sidewalks to try to better accommodate the budget, but the final plan is otherwise similar to the concept plan, see attached drawings. The plans have been submitted to SPUC and will be submitted to the MPCA for a NPDES permit to monitor erosion control. The contractor will be responsible for all permits required. The play equipment, which was selected at a neighborhood open house on February 15, 2007 and has been approved by the PRAB and City Council earlier this year. There were two manufacturers selected; EFA/ Landscape Structures for the 2-5 age play area, and Clearwater Recreation/Burke for the 5-12 play area. Budqet The current CIP allocation for this project is $1,087,500. The main components of this budget include: a restroom/warming building, play equipment, earthwork, trails, hockey/basketball, and parking paving, utility connections to the building pad, and improvements for two 240' youth ball fields. Site furniture includes benches, pedestrian lighting, picnic tables and bike racks. Other amenities include hockey boards and lighting, basketball court, volleyball court and horseshoe pitches. Trees, shrubs, perennials and three small native planting areas complement the park. Staff time (Engineering designed the parking lot and utilities, and will be in charge of the Construction Administration) consultant for surveying and staking, testing, contingency, and Trunk Water Charges (estimated) are all included in the estimate as part of the 25% staff design and CA. There is also a 5% project contingency. The CIP total includes $250,000 in costs for building construction for the restroom/warming building. This total included bringing utilities to the site (the preliminary estimate was $50,000 for sanitary sewer and water connections and stubs to the pad). The current proposed project does not include the construction of the park building but utility stubbing is included in the budget. Earlier in the year, discussions on budget and staff workload caused the building design to be deferred until 2008. Construction of the building in 2008 would also allow for a concurrent design, bidding and construction with the Greenfield East -Park Meadows Park building, which will allow for cost efficiencies for both buildings. Subtracting $200,000 for the building as well as the $65,000 for the already quoted playground equipment, leaves an amended CIP Total Budget of $822,500 for park, parking lot and utility connections. From that amended total, 25% Staff Design and CA and 5% contingency produces a $575,750 construction bid total. This is the number that bids must be within to stay in budget. PARK CIP $1,087,500 BUILDING COSTS L.S. $200,000.00 PLAYGROUND L.S. $65,000.00 AMENDED CIP $822,500 STAFF DESIGN AND CA 25.0% $205,625.00 CONTINGENCY 5.0% $41,125.00 CONSTRUCTION BUDGET $575,750.00 The estimate total is $618,922, which is $43,172 over budget. Several deduct alternates included can bring the estimate under budget by $42,829. The deduct alternates, which were discussed during the PRAB and Council approvals process include: . A). not paving the hockey rink and moving the full basketball rink adjacent to the volley ball court, -$7,594. . B) reducing the size of the hockey rink from regulation 202' x 86' to recreational size186' x 86' -$2,924, and . C) eliminating all improvements for the northern youth ball field -$75,483. Additional bid items are included in the bid proposal for purposes in order to have a bid unit price in the event that they are needed. They would be covered under the 5% contingency if they are needed. This could allow for unit price reductions of up to $15,000. If this turns out to be the case, the north ball field deduct could possibly fit in the budget, depending on how the bid pricing comes in. Overall Park Reserve Budqet This project will serve two primary developments which were platted in 2001 and 2003, so these residents have been "waiting" for several years. The only other parks within safe walking distance, are a private tot lot in Providence Pointe and Valley Creek Crossing Park, which is currently under construction. Tot lots are designed to primarily serve parents and younger children. Amenities that serve older children, teens, and adults are not available in this area within safe walking distance. In addition, due to the timing of the Providence-Westchester project, we have set the proposed completion date at June 15, 2008. This is due to the fact that there is limited time remaining this year that bituminous wear course can still be installed. We had a similar situation happen at Tahpah, and if the bituminous can not be completed by November 1 st, it may have to wait until mid May for road weight limits to be taken off and for bituminous plants to begin production. The site grading, concrete work and dormant seeding (which is best done in the fall) can be completed this year. Since it still appears to be a favorable bidding climate, we may get good pricing from a contractor who sees this project as one which can carry them through the late fall and early spring. This project will then be partially complete at the end of this year and the remaining funds will not be used until 2008. The only additional park CIP project still planned for 2007 is the 2nd outdoor rink at Lions Park. This project has a proposed donation by the Hockey Association of materials and labor to construct the concrete surface, but would require a publicly bid board system. The board system planned is the same as Providence Westchester, which we have a quote for $56,000, installed. Timeline The proposed timeline for this park is to have advertisements run in the Shakopee Valley News on the 9th and 16th, and in the Construction Bulletin on the 13th and 20th. The Bid Opening is scheduled for August 31,2007 and Award of Contract will be presented at the September 4th City Council meeting. This timeline, has been coordinated wit the City Hall Parking Lot project. REQUESTED ACTION 1. If Council concurs, offer Resolution No. 6635, A Resolution of the City of Shakopee Approving Plans and Specifications for Providence Pointe- Westchester Park and Authorization to Advertise for Bidding 2. Move to authorize the bid opening on August 31, 2007 at 10 a.m. Note: Attached is a revised Memo and Estimate for the Providence Westchester Park Approval of Plans and Specifications and Authorization to bid. Late Friday, I found that I had made an error on the profile of the hockey pavement and it was not included in the correct bid item. Also, Engineering informed me that I had not included the correct numbers for the parking lot bituminous quantities. Attached are the correct numbers. The overall effect on the project appears to be minimal in terms of the staff estimate. The project still estimates slightly over budget, but the proposed deduct alternates would still bring the project under budget. I apologize for the error and the need to revise this memo. Andrea Weber No. Estimated Estimated RUNNING Item Units Qty, Unit Price Total Price Total Price PARK CIP $ $1,087,500.00 BUILDING COSTS L.S I $200,000.00 $200,000.00 $887,500.00 PLA YGROUND L.S. I $65,000.00 $65,000.00 $822,500.00 Rev CIP STAFF DESIGN AND CA 25.0% I $205,625.00 $205,625.00 $616,875.00 CONTINGENCY 5.0% 1 $41,125.00 $41,125.00 $575,750.00 $575.750.00 CONSTRUCTION BUDGET $575,750.00 PARK IMPROVEMENTS -Providence Westchester-SCHEDULE A I MOBILIZATION (5% Max) L.S. I $28,787.50 $28,787.50 $546,962.50 2 TRAFFIC CONTROL L.S 1 $1.00000 $1,00000 $545962.50 3 SA WCUT BITUMINOUS (ANY DEPTH) L.F. 65 $4.00 $260.00 $545,702.50 4 REMOVE CURB AND GUTTER L.F. 105 $5.00 $525.00 $545,177.50 5 SILT FENCE L.F. 800 $3.00 $2,40000 $542,777.50 6 COMPOST BERM I' HIGH x 2' WIDE L.F. 1500 $5.00 $7.500.00 $535,277.50 7 COMPOST LOG 8" L.F. 700 $3.50 $2.450.00 $532.827.50 8 STRAW BLANKET SY 100 $2.00 $200.00 $532,627.50 9 COMMON EXCA V A nON (P) CY 12,300 $8.50 $104,550.00 $428 077.50 10 SUBGRADE EXCA V A TION CY. 260 $10.00 $2,600.00 $425,477.50 11 GRANULAR BORROW CY. 960 $10.00 $9.600.00 $415,877.50 12 WASHED SELECT GRANULAR BORROW C.Y. 170 $12.00 $2,040.00 $413,837.50 \3 TOPSOIL BORROW CY. 500 $12.00 $6,000.00 $407,837.50 14 SUB GRADE PREP ARA TION SY 2000 $2.00 $4,00000 $403,837.50 IS CLASS 5 AGGREGATE BASE (100% CRUSHED LIMESTONE) TON 2095 $15.00 $31,425.00 $372,412.50 16 AGLlME CY. 220 $30.00 $6,600.00 $365,812.50 - ~ TYPE LV NON-WEAR COURSE (LVNW35030B) TON 345 550.00 $17,250.00 $348.562.50 ~ TYPE LV WEAR COURSE (L VWE45030B) TON 305 $60.00 $18,300.00 $330,262.50 ~ 3" THICK TYPE MVWE45035B, WEAR COURSE S.Y. 1475 $10.00 $14,750.00 $315,5t2.50 20 BITUMINOUS MA TERlAL FOR TACK COAT GAL. 154 $3.00 $462.00 $315.050.50 - 21 GEOTEXTILE, TYPE V SY 880 52.50 $2,200.00 $312,850.50 22 4" PERFORATED PE PIPE (STORM) DRAIN WITH FABRIC AND DRAINAGE ROCK, COMPLETE L.F 530 $1200 $6,360.00 $306,490.50 23 FINE FILTER AGGREGATE (2"deep) CY. 50 520.00 $1,00000 $305,490.50 24 CONCRETE CURB AND GUTTER, DESIGN B612 L.F. 870 $20.00 $17,400.00 $288 090.50 25 CONCRETE UNIT RETAINING WALL, COMPLETE INSTALL WITH DRAIN, BASE SF FACE 120 $20.00 $2,400.00 $285,690.50 26 10" CONCRETE PAVEMENT S.Y. 25 $60.00 $1,500.00 $284,190.50 27 CONCRETE SIDEWALK SY. 800 $2500 $20,00000 $264,190.50 28 TRUNCATED DOME PANEL FOR PEDESTRIAN RAMP S.F. 45 $4500 $2,025.00 $262,165.50 29 CONCRETE PLA Y BORDER- 8" W x 12" DEEP L.F. 643 $20.00 $12.860.00 $249,305.50 30 CONCRETE EDGE- 8" W x 4" DEEP L.F. 263 $1500 $3,945.00 5245,360.50 31 SEEDING TURF GRASS-MNDOT 270 AC. 6 $800.00 $4,800.00 $240,560.50 32 SEEDING NATNE MIX -PRAIRIE MIX-MNDOT 350-90% AND MESIC FORB 10% AC. 0.7 $2,000.00 $1,400.00 $239,160.50 33 SEEDING ATHLETIC TURF GRASS AC. 2.1 $2,500.00 $5,250.00 $233,910.50 34 SODDING LAWN TYPE S.Y. 1400 $2.50 $3,500.00 $230,410.50 35 BB TREE 2", INSTALLED EA. 40 $300.00 $12,000.00 $218,410.50 36 ORNTREE, 1-112" INSTALLED EA. 24 $225.00 $5,400.00 $213,010.50 36 BB EVERGREEN TREE, INSTALLED EA. 65 $250.00 $16250.00 $196760.50 37 SHRUB, INSTALLED, #2 EA. 60 $30.00 $1,800.00 $194,960.50 38 PERENNIAL, INSTALLED EA. 100 $20.00 $2,000.00 $192,960.50 39 HOCKEY BOARD SYSTEM for 202'x86' RINK, installed EA I $56,250.00 $56,250.00 $136,710.50 40 HOCKEY BOARD coordination fee L.S. I $2,812.50 $2,812.50 $133,898.00 41 HOCKEY LIGHTING, 2 POLE WIlli CONTROLS L.S. 1 $30,000.00 $30,000.00 $103,898.00 42 ELECTRICAL CONNECTION, WIRING TO PANEL, PANEL, WEATHERPROOF CABINET L.S. I $3,500.00 $3,500.00 $100,398.00 43 12' PEDESTRIAN LIGHT FIXTURE AAL PROV COMPLETE , INSTALLED EA. 4 $4,000.00 $16,000.00 $84398.00 44 IRRIGATION, PER 240' YOUTH BALLFIELD L.S. 2 $12,000.00 $24,000.00 $60,398.00 45 IRRIGATION CONNECTION, METER, RPZ, CONTROL, PANEL WEATHERPROOF CABINET L.S. 1 $3,000.00 $3,000.00 $57,398.00 46 ADDITIONAL IRRIGATION HEAD EA. 10 $10.00 $100.00 $57,298.00 47 ADDITIONAL IRRIGATION LATERAL/BRANCH LINE L.F. 50 $10.00 $500.00 $56,798.00 48 5' OUTFIELD FENCING-PER 240' YOUTH FIELD, WITH GATES L.S. 2 $7,500.00 $15,000.00 $41 798.00 49 2' GALVANIZED MARKER POSTS WITH BALL FINIALS EA 32 $3.50 $112.00 $41,686.00 50 5' CHAIN LINK FENCING, INSTALLED L.F. 50 $12.00 $600.00 $41,086.00 51 BACKSTOP, INSTALLED L.S. 2 $4 500.00 $9000.00 $32086.00 52 3 BASES, HOME PLATE AND 3 PITCHING RUBBERS SET 2 $350.00 $700.00 $31 386.00 53 20' ALUMINUM IN GROUND PLAYER'S BENCH, EA 4 $800.00 $3,200.00 $28 186.00 54 BASKETBALL HOOPS, EXTENDED 6' CANTILEVER, .. INSTALLED PAIR I $1,500.00 $1,500.00 $26,686.00 55 VOLLEYBALL POSTS AND NET, INSTALLED SET I $150.00 $150.00 $26,536.00 56 HORSESHOE IRON STAKES, INSTALLED PAIR 2 $100.00 $200.00 $26,336.00 57 6'HERITAGE SERIES BENCH Willi BACK; WABASH HR310 WIlliHR315,INSTALLED EA 6 $1,400.00 $8,400.00 $17 936.00 58 46" SHADELAND SERIES PICNIC TABLE WITH CANOPY, MODIFIED TO BE ADA; WABASH SHIOOP, INSTALLED EA. 1 $5,600.00 $5,600.00 $12,336.00 59 36" BIKE LOOP, WABASHBLlOO, INSTALLED EA 2 $150.00 $300.00 $12,036.00 TOTAL SCHEDULE A $563,714,00 $12,036.00 SCHEDULE B STORM SEWER IMPROVEMENTS I 12" RC PIPE SEWER DESIGN 3006 CLASS V L.F. 81 $35.00 $2,835.00 2 CONSTRUCT DRAINAGE STRUCTURE DESIGN 2'X3' EA I $2,000.00 $2,000.00 3 CONSTRUCT DRAINAGE STRUCTURE DESIGN 4022-48 EA I $2,500.00 $2,500.00 4 RECONSTRUCT STORM MANHOLE V.F. I $800.00 $800.00 5 CONNECT TO EXISTING SEWER (STORM) EA. 1 $900.00 $900.00 TOTAL SCHEDULE B $9,035.00 $3,001.00 SCHEDULE C W ATERMAIN IMPROVEMENTS I CONNECT TO EXISTING WATERMAIN EA. I $1,000.00 $1,000.00 2 6" W ATERMAIN - DUCTILE IRON PIPE CL 52 L.F. 347 $25.00 $8,675.00 3 6" GATE VALVE AND BOX ASSEMBLY EA. 2 $1,100.00 $2,200.00 4 HYDRANT EA. 1 $2,000.00 $2,000.00 5 I" CORPORATION STOP EA. 1 $70.00 $70.00 6 I" CURB STOP AND BOX EA. I $150.00 $150.00 7 I" TYPE K COPPER PIPE L.F. 141 $20.00 $2,820.00 8 WATERMAINFITTINGS LB. 150 $2.00 $300.00 TOTAL SCHEDULE C $17,215,00 - 1$14,214.00\ SCHEDULE D SANITARY SEWER IMPROVEMENTS I CONNECT TO EXISTING SANITARY SEWER EA. 1 $800.00 $800.00 2 CONSTRUCT INSIDE DROP YF. 17 $50.00 $850.00 3 6" PVC SEWER PIPE, SDR 26 L.F. 619 $30.00 $18,570.00 4 TELEVISE SANITARY SEWER L.F. 619 $2.00 $1,238.00 5 48" SANITARY MANHOLE EA. 3 $2,500.00 $7,500.00 TOTAL SCHEDULE D $28,958.00 (S43,t72,OO) over budget TOTALSCHEDULEA+B+C+D $618,922.00 ALTERNATE A-Hockey rink unpaved, basketball adjacent to Volleyball al DEDUCT wear course paving MVWE45035B DIFFERENCE IN BB-Hky S.Y. -619 $10.00 -6, I 90.00 $ a2 ADD turf seeding AC. -0.13 $800.00 -104.00 $ a3 DEDUCT extended BB goal posts, installed PAIR -I $1,500.00 -1,500.00 $ a4 ADD standard BB goal posts, installed PAIR 1 $1,200.00 1,200.00 $ a5 DEDUCT HOCKEY BOARD installation cost for paved surface EA. -1 $5,500.00 -5,500.00 $ a6 ADD HOCKEY BOARD installation cost for turf surface EA. 1 $4,500.00 4,500.00 $ TOTAL BID ALTERNATE A -7,594.00 estimate with deduct A 611,328.00 ($35.578.00) over budget ALTERNATE B-Hockey rink paved, recreational size (186'x86') bl DEDUCT DIFFERENCE IN wear course paving MVWE45035B S.Y. -160 $10.00 -1,600.00 $ b2 ADD turf seeding AC. 0.033 $800.00 26.40 $ b3 DEDUCT HOCKEY BOARD cost for 202'x86' RINK EA. -I $56,250.00 -56,250.00 $ b4 ADD HOCKEY BOARD cost for 186'x86' RINK EA. I $54,900.00 54,900.00 $ TOTAL BID ALTERNATE B -2,923.60 $ estimate with deduct A+B 608,404.40 ($32,654.40) over budget ALTERNATE C-north ball field un-improved cl DEDUCT OUTFIELD FENCING, INSTALLED L.S. -I $7,500.00 -7,500.00 $ c2 DEDUCT BACKSTOP, INSTALLED L.S. -1 $5,000.00 -5,000.00 $ c3 DEDUCT BASES AND PITCHING RUBBERS, INSTALLED SET -1 $350.00 -350.00 $ c4 DEDUCT PLAYER'S BENCHES EA. -2 $800.00 - 1,600.00 $ c5 DEDUCT COMMON EXCAVATION EAST OF TRAIL C.Y. -3137 $8.50 -26,664.50 c6 DEDUCT AGLIME (I field) C.Y. -110 $30.00 -3,300.00 $ c7 DEDUCT IRRIGATION FOR BALLFIELD L.S. -1 $14,000.00 -14,000.00 $ c8 DEDUCT EVERGREEN TREES BY FIELD EA. -21 $250.00 -5,250.00 c9 DEDUCT DECIDUOUS TREES BY FIELD EA. -9 $300.00 -2,700.00 e10 DEDUCT BALLFIELD TURF SEEDING AC. -1.05 $2,500.00 -2,625.00 $ cll DEDUCT NATIVE SEEDING AC. -0.46 $2,000.00 -920.00 e12 DEDUCT GAL V. MARKER POSTS EA. -16 $3.50 -56.00 e13 DEDUCT 3" BITUMINOUS S.Y. -362 $10.00 -3,620.00 $ cl4 DEDUCT CLASS 5 AGGREGATE TON -114 $15.00 -1,710.00 cl5 DEDUCTCONC. WALK S.Y. -7.5 $25.00 -187.50 $ TOTAL BID ALTERNATE C -75,483.00 $ estimate with deduct A+B+C 532,921.40 $42,828.60 UNDER BUDGET BID WITH ALL DEDUCT ALTERNATES $532,921.40 budget $575,750.00 under budget $42,828.60 -$12,200.00 ITEMS THATARE NOT ANTICIPATI RESOLUTION NO. 6635 A Resolution Approving Plans and Specifications and Ordering Advertisement For Bids For Providence Pointe- Westchester Park Construction Project No. PR2007-3 WHEREAS, Andrea Weber, Park and Recreation Landscape Designer, has prepared plans and specifications for improvements for the Providence Pointe- Westchester Park Construction, and any appurtenant work, and has presented such plans and specifications to the Council for approval. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA: 1. Such plans and specifications, a copy of which is on file and of record in the Office ofthe City Engineer, are hereby approved. 2. The City Clerk shall prepare and cause to be inserted in the official paper and in the Construction Bulletin an advertisement for bids upon the making of such improvement under such approved plans and specifications. The Advertisement for Bids shall be published as required by law. Adopted in session of the City Council of the City of Shakopee, Minnesota, held this day of ,2007. Mayor of the City of Shakopee ATTEST: City Clerk LEGEND PROVIDENCE POINTE- vVESTCHESTER PROPERTY LINE f) A]RK CO NSTR1J Cl'l () N GOVERNING SPECIFICATIONS RIGHT-OF-WAY THE GREENFiELD WEST NEiGHBORHOOD PARK CONSTRUCTION PROJECT SPECIFiCATiONS SETBACK S RAK: 0 PEE M' N AND mE 2005 EDITION OF THE MINNESOTA DEPARTMENT or TRANSPORTATION " .... 1. "STANDARD SPECiFICATiONS FOR CONSTRUCTiON". CENTERliNE ' C' I T"'v P' R 0 J"E' C rI~ N' 0 P R 20 0 ....) 3 ALL TRAFFIC CONTROL DEVICES AND SIGNING SHALL CONFORM TO THE MN MUTCD _ _ _ EX'.STINC CONTOUR MAJOR i . ( - INCLUDING THE FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. . AI I TRAFFIC CONTROL DEVICES SH~,LL HAVE RETROREFLECTIVE SHEETiNG. EXiSTiNG CONTOUR MINOR -- e'ROPOSED CONTOUR MAJOR P ARK CONSTRUCTION & APPURTENANT YV-ORK ,_.. PRO,'OSED CONTOUR MINOR PR^~O~-D ~IT,.,..,,^,.m 1 ' I"" ..".."...,..-'^,. \'(::;/!;/T ",'-......,,' -.." "..m' \\~~ """",,///' ,_J,.....::.;::. 0 .u:v:;:~vu::' I EXiSTING CONCRETE CURB .L"""", ::se INDEX -oc- OVERHEAD ELECTRIC LINE ""'" r --, I I \ /! I \ :~;~"'-""" -v'- UNDERGROUND ELECTRIC LINE """"//// . " r' DESCRIPTION SHEET NO, -N- UND.ERGROUND TELEVISin.,N liNE ;::r~lilTj>:::;)t:] PRO J E C I ;( COVER COVER SHEET 'JN~ER~~O"ND __, "~, ,^"" ".,_ lO,1 SURVEY/EXISTING SITE """""",,"""'~"" """ v", 1""-'" ,," "'," .",," LOCATION -;0- U~'~ERG~O\;N[) F:;~ ~~T:C ";'I:F / . . A t~:~ ~~~~~S~I~L~IT~R~:~ETAIl, -,.- UNDERGROUND G"S LINE 'IN A'( '\ 69 -~~-~I)/ ""'", l1.2 SO UTI; FIELD AR~A DETAil "'""." "''''''>>'''''''' EXISTiNG. STORM SEWER H \ G H /' l1 ,3 HOCKt,Y AREf, Dt,TAiI" > FLARED END SECTION """,:::::::::::::~~::"~'::~~~=:::~:~::..::;, L 1.4 PLAY AND COURTS AREA DETAIL , ".". ( l2,Q PROPOSED GRADING AND EROSION CONTROL PLf\N -0--0--- SILT FENCE liNE r---. ,,,me 'fiji" ! L3,O PROPOSED TREE PLANTING PLAN ----0---<>- FENCE LINE / ;2J"",:,,"'''''/'' "..~",;p;::;;l \!T~\ \n'~ \Et;\ \CEt~E\.\ Imi~! " L3,1 PLANTING DETAIL SOUTH AREA .,.",v~vvv,,' :::~~"'~:E WALL ~ "''''''''':''~..::~:",,_ / \~r}\ \lf~\\ \m) ltt lr\\ ~H\. \\tl\ IU:.\} \EH1::\ ! I] 8" t~:; ~~~~:~~ ~:~~ U 1m m1 ~~l! f"'i'!';'l h:"'i';'di:::ii:iiT"1~!" ! j L4..3 DETAiLS SITE CONCRETE SURFA.,.CE \ '-----'" !i'i'T'f":"i! ! '(iiN!' )\!1lii\ili;!:!i\illtJhIilli'L"J 0::].1 L4.4 DETAILS 51:E . ;l:,i;T:.J2JJ ct. l4.5 PLANTiNG lJETAILS BITUMINOUS SvRFACE\ W,,, /;:~\\\[Tr;! Ii''?'fni IfYi';'ii i, i H !! !!! I! 1 I I ; '--=J ", l4.6 F'LANTING DETAILS ~o~o~o"c'ovovov, "'R"'"" '"NTRANC''' >T'Tn"i"i"I'n c;;::.r.::;':::;II.g::J;JJc!.1 ' LO,";,e"e':;'':;"~ec.,e;:, ~,"'~C u, ~ I.::: <( mD! ,= '''~~4.~~\~;~';~~\;\\\~' .//i''f'FiI Vcri'i'!1 !,~1,.,.,.". ::1: I 01 C-1 PARKiNG LOT At~[I UTILITY PLAN WA0'~ FIBER BLANKET""" IrYffrn !I=:: ,ic: rZ~-<';:::2\ illJ), t~j ,1..,,1; <CI" """""""'" LL [DIB] I:: ;'-":0 v I: <~:;;'" f f . 17TH ,A-VEN 1I E ~"" THIS PLAN CONTAINS 17 SHEETS ,,^-,''V'',,/,,/VV'v- COMPOS], BERM """""""." ~2 'm" F= ~~;\;;: ",,,'-!., I 0::::"-.,, = m." I.C::: ~ " i ~ Cm,WOST LOG """"",,,.,, - frttESi ,,::: "-':::: ~'~>:""" ,,;~; 0:"//l['f]; jU ~I - -.J! ,,,,,,,., :;::::;:", " , , I."i ". I';;,:; -.J I , """"""." ::: :::::; , ";,:0,,, I x: ":~" ,~, - ~m!J] co ~ ..~~ ~ .' II' bJ II iBfB] </~! ~~i~~~3 ~""" 1\ o;,vN / POLE ,~ iTTU:ITJ' \~,"p' ,,'. ' . \ I, !rITIE li'fh"i: 1--" i r ,v::"" I :- :T' ~ !.:::::LIL": :r;;J;;;::Pi - U1 -$ BORING. LOCATION II T \ I I [TJUlI] \ ;. " ?""ffi [("if! i '!:fil""" iQ I A;-L ,APPLlC:\BLE ~:D~,R~L. ,STATE AND LOCAL LAWS AND ORDINANCES ~~LL BE COMPLIED ;;; TELEVISiON BOX ' ," " " " " ' , , , 1';';;,LtJj [iF] l:iL.\j 1 ,f~j <C Vi,It. IN TH~ CON~,RwCdON 0, THIS PROJECT. '" ., ^. m__",,_ 17TH AVENUE " , III ,E...EP,',C,NE B"X m "",,- """'- """-""" ~{~~"~! ;(F.'....: ~" ,I I 21 Ij] ELECTRIC BOX I'" , ~ ' : ,,'"'' I"" ! ~-:~ "", ""~" ",t"- ,:, \ """,,""" ' I""""'" ,,', ' . , ,,_ i<l""'''- , ."""""'" """\ ' ,,' '" " " ",-,"-."." I f---; ...~ ~~ ' - -,,"" , , ~ ,,,"" ."""""",," ' ~~~ EXiSTiNG DECIDUOUS TREE """"- ,,,,,,,,,,,,,m"''''''''''''i "," , '/.- """""" """".",,,,,,,,,, I,"'"'''''''''' """,,""'" """"".,," : J DESIGNER: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER '<J"" ,*- EXi"'T,NG '^ON.IFEROUS TRE, ,," 1--" ~~~i~;~ ~ ,"r::r::!""r-T)~~ """_ I.."""L" MY DIRECT SUPERViSION AND THAT I AM A DULY REGiSTERED LAND'SCAPE ARCHITECT ~ c:~ "~"'v ^r" D e,"'"c:= 1-">"""'" ~~::::Jj!~;;;Z0 T '; VJF:VCE~ i,m,,,,,,, "'" := UNDER THE LAWS OF THE STATE OF MINNESOTA. ANDREA S. WEBER ~REE't~~~O:~;' F"" ,R"P".,ED f?~ );/LI .. .~ r.iil\~!~3~ ~ I "IT 2007 ~G.No43729 7/7; \~<~;/: I ! '77"'7/"':~::: \ " CITY OF SHAKOPEE, MN ! , , \ \ 'Z/ I / / / / ! \ . . 129 SOUTH HOLMES ST SIIAKOPEE, MN 55379 THE L,OCATIONS OF [XiSTI~G UNDE:RGROUND, U TI!.i'l2ES THA T _ARE SHOWN" ARE ~OWN I~J r "-----...__ PLAN REVISIONS . (952) 233-9300 phone AN APPROXIMATE WAY ONLY, IT IS NOT GUARANIEED THAI ANY OR ALL EX!SilNG '(''7: PROjC:CT LOCATION DATE SHEET NO, APPROVED BY ,..,,,,.,,. (952) 233-3801 fax UTI!. TIES ARE SHOWN, THE CONTRACTOR SHALL DETERMiNE THE EXACT LOCATION OF ~ // (<"'\''''IT ' " !::' "l'/';/{"-'i' "~'ll"j'I[ "i ALL EXISTING UTILlT!ES BEFORE COMMENCING WORK. HE AGREES TO BE FULLY COUNTY: SCOTT ,,"':0 [ !/ ,\~" I, / iI"l" [\ ~ESPONSIBLE FOR ANY AND ALL DM-IrAGES WHICH MIGHT BE OCCI''sIONED 8Y HIS '~'ISTRICT' MflRO ",~,Y", ,-M\" ,,"", .";''''' d" , ." " r AlLURE TO EXACTLY LOCATE AND PF~ESEF<VE ANY AND ALL UNDERGFWUND UTILITIES, \ J, ,,, .. - 4w'l NOTIFY GOPHER STATE ONE-CALL 651-454-0002 .-.-,,--- SHEET NO. ~ OF .....1LS\lEETS ..-<) " ,0" ~ ~ w WW f- ./0' ~ <r:0 g~zI tf) /' ~ tn f- --l ~ ;::: - tf) f-' 0::: <r: --<1 0::: <r: ~Zw<r: wOS I UJ ~ ~O ~ 0~u~0~0W w ~ ~ /~ w~ w 2<r:Wf-Z<r:f- er::wer:: S ~ ~~ ~ ~ ~~~~er::~ oOtf)~ 0 0 "'" ~ <( C'J o '2 0 rnf- Z Zs >- ~ ~ ~N ZWz ~ zU COW W. 'm' '" o 0 -0::: WOZ Z W ,~O " 0 er::OOI <r:~ ~f-O . f-~~~er::W 0.. ~~OZ~<r: <r:Zer::tf)OOWtf)OX~O<r:O , '" :;: ;! 'i' I ~ ~ ~ 8 ~ 8 0 6' .o!Q g! I" W is iC :> ::J--- '" UJ is ~::: z Z ~: U :1; " w 'S ~::J . ~ :> :;' Ii! W " 0 Y' z W z ""'" "'" >- 11 () "' ~ ro~ZOf-O<r:~ OWO~Oer::er::oorn ~ l,; ~ ::J~I.C i"I~OU~~X ~OWU ~ (1 w ~ C"\j '" f.;: '" ~~. ZW C w - ~~ O~ '" "- :::f CW_~~~O~O~ . ~ ~wU"Z - "' I~~~ ~~ :> WZ~mc O~W - ~ ~ v'~ '" ~c<o~w,>~I~Sw8~~~ ~W[ij~U ' '" (;1 ~ ~N F!:(fl~ ~~~ ~~ :;,~~~ooo:>::J~mo~Z C:i er::<r: w W<r: w Z-W ",>- Of-~Of-zrnser:: ~w~er::~<r:ooer::~~ 01- OZCl Vl~ z~iB 'i- ~0C~000~WC~~~ wc~U~W~' 0 5~~ .U~~ ~ LO ~~~ ~~~. _ wC ~~~~~ ~ ZI~ ~W~Z~ ~~~~ UCWO~W~<<~ ~ UOOO " ~g~ ~~~ o~;!o~w"I~i"O~OW~OOCZ~~Z ' a ~~~ ~~~ zzu~zo~~ucz~odC~~OWOUY' - o er::o<r:f-tf)zz w f-<r:w~w~' ~ow<r:oer::tf)f-00~2f-~tf)~>er::f-f-er::w _ .Zf- oz_o~<r:er::z~<r:x~0~<r:f-0 ii tf)~otf)Ntn8~ .WI~<r:<r:ww~ tn~Otf) Z ~ !im l~i! ~no(f)(f)~Ier:: .0 w OZ <r: 8 tfl<r:LOrner:: .zoer:: ,/ " .. ; (~. ~^''"~c"'~ T ! l <0 ~-~~< ~ '''. """..,.,,~ , - .' ~'_. ~ ~,.~"., ' '-"" Hiri> l~ : I ---. ---- -,,'- --,- i!~ Ifi.l , , ~~ . ~ I"' I ~ 0;\' ~ \ \ _ -':;:.: i..-i6! \\ "\o......j \ \ \ \ ~~"~- ..,'~~- ,&~ ' 'n . .-r ~,,/ <fll !! I '.---. ~ " 'tf ,."" '--., .- -'-. .' = -~ --.., , \ - '-' .....~ . ~I i; I - . . ~..... . _ ~ S~ .--.---- · ' ,r - "00 . . "'H ' ,... .' . j]; ;; ; , ~- ---;..-# .-- -- .' -_. . . . \ ",\w'-- --0<> oW >I.)! j I lJ 1/1) . ....' : : '-" 'C", er::: !: ! \ ~ ;::: __ 0,"' . -' . " I I ~ _____ 0.00 IE'" '..1 " " ::: ,'a .\ " UJ [;: 01li 11 ' "'" ..J"- ..J'" ~U "a <::> CD>- I \ ~~ && \ \ 0.'" I- ~~ \ Ulc! -5';, 01<- w i , ~ IO ~ U : I- . // ~)- UlLll ~ i~ \/~ ::: ~~ w G: ..J"- ..J'" <::> " '" Z : m>- ~ >- III oZo ~ ~ "' "' ~~ ~ 0... i~ '//~' '0 ~~25~ w Ii er:: ! !i ~~~ "m'':;/!~)' , // "'-, W ' o : " C\[ ~<( / 0 < '" .......................~.... 8::Z z 0 '" ....... u ::> '" ~ ~"\I\..\\'( i'-1l:<i'G\ i':~\< ,-?\..i'"\ . ~st\J>tl:< \ () , ~ " " Lr) SHEET NO. " W WW 0 0 W Uz 0 2 0'" ~ o~o Z 2 W ~~t 0::: ~ O~ ~ S <CO ~<c~ <c <C~I O:::<c<c WOW ~ W ~20::: ~ ~~ ~ ~~O 0 W ~ ~ W m <c >~ <C<CO Z ~ <c 2 0 ~ 0 -~ i 0::: - ~ - 0::: W ~ ~ 0 0 I 0::: <c ~ ~ rv 2 2 0.. lL. L......... ...... c 0::: 0 <c 0.. ~ ~ ~ ~ .2 ~ W ~ ~ '-'- 2 . '" ~Q W :20.. <c <c W<C5I 2<c~~ 0..<C W U~ 0 ~ 0::: ~ ~ ~. I 01- O~ I- '" 0... I O:::w~ z .. i Io.. <C <C <C 2W~I W-(?O::: U I~W <C~ 0:::00...2 t; :C i 0.. ':22WO~ .(f)Q~ S 0:::~20lL. ~8~~m WlL.~W ,Oi ;1 " w ............... 0 ~ N _ 0::: 2 2 ~ . W ~ - 0 0 0::: lL. 0::: 0.. :2 ~RNESE PLACE ~ i.i' :', ~ 00:::go~<C<C:;ig~:50;;;:~ ~<C~(f)2 ~~~I::Jci--t5 01~~-' 0 co.", ~ i ::J6'T~~lL.8Ui:5::J:;i~00 5~:56Q b~~S:i~~6 ~~(f)::i ;:: ~ ~ ~ 0I~(?W~0(f)~<C<C~8~~ W~o..~~ ZU~~(f)U<C~~ m3~8 00 U~W~ I O:::~ m- ,~O::: W':2 <C ~rv <l. .......... .q- 2 <C <C ~ (f) 2 W <C WO:::O::: '-' ~ ~ 2 - ~ 0 ~ ~ - '-'- j ~ ::J~I~~ .~_(f) ->~~~~O:::W5~ ~m2WOo(f)2 O:::I-~ z <C ~0:::0..~00:::2(f)0- ~~~<c~ 0 <C~~W-~ IW 0 0 ~ I t15LO<c ~O:::W-2~cdW6~<C ~W .I~0:::0:::0 00 (f)W~~ LO ~ ~ . 0 I<CtOo..W:2O"~OO I:2<CI2 o:::WO~<C~~ ~2W I2~ ........................ :z t I . ~ ; ~W,/ ~~W~~~O:::O~ m(f)O~~~O IW ~<C<C>000:::0~:52 : ~ I ..:; \':: .. 01:: 0::: ~ -'-- 0::: <C m ~ <C 0 (f) I 0.. ~ (f) ;:;;: I ~ 00 ,., <C ~ ij . w..... I-- .........w "'''' 0::: 0 ~ 2 0::: - 0 ~ ~ ~ ~ W 2 '-'- U I 2 0::: :2 2 lL. W '-'- ~ ~..:; ~ ~~il:' 2 ~ 0 ~ 0 ~ ~ 0 g g:: i: ~ ~ 0 ~ ~ W ~ ~ ~ 0 ~ ~ g:: 0 ~ W ~ woo.. ~ ~:~ Viu<C5:~2~:;i<CO:::~ :5:;i ~<C::J~0lL.~~~0~~00:::0:::~;::;(f)2~ is:;:!=! W<C~lL.o::: UI~O"~Oo...~~ ~wg~(?~ 2<C2w5:W~~6<C<C ~<'i !:I8:; b g:: :;i 0 ~ t5 ~ ~ 0.. ~ 2 ~ (f) lL. 0.. ~ :2 2 2 0 ~- ~ W 8 W m 0.. W Z ~ 2 ~~ ~gg: 2 02 0 ~ 6 <C ~ ~ ::J ~ :5 0 ~ ~ 8 0 ::J 0 ~ 8 ~ ~ g ~ ~ ~ :5 W ~ ~ 0::: W ~ :::! g "'i:l 0::: 0::: (f) ~ U 0::: ~ ~ W 0 2 '-'- :> 2 <C - 2 '-'- ~ W ~ 2 <C - iO;J;>; WOW <C U 0 2 - <C 0... 0.. <C ~ W 0.. <C :2 0 W <C 0::: :> ~ 0 0::: ~ <C ~ <C ~ 0 6i:l3 - ~ z ~ . ~ 0:2 . ~ . 0.. . 0 W 0 ':2 2 W ~ <C . 0::: 0 0 .. ~ . I lL. 0 ~ W 0 ~"'~ ~ ~ 0 ~ N ~ U ~ n m .q- <C LO 2 I ~ to _ <C 2 0.. 5: ['. ~ N W 00 <C OJ ~ <C ~ 0.. 0 <C a:9~ ~i;!~ BASENJI CURVE .____._ ............... on...mm... m. ..._. 00 ~ ~ N 0 o N n ~ ro ro ro ro ro / o en -"> L..I 0:: " ~ WM ,'" ~ I E?@ 0::: w ~ (j) w 10 :r: .. j1 () ~ 9 ~ r- r- w i)\ (j) Z 5~ w ~ ~~ 5 ~ W~ W i l- 0::: w I ~ <C ~ ~ I 00... ~~~ 0... 8 ~x w U1 ~~ 9 U ~ , .. iO~ !!! Z 0 ~ 6~ j~ W 0::: / ,... "':::> 0 0... /_ (Ill-- - / ~ > ~'1)- ~ .. 0... V> I-- " ::; ~ p:l!il G3~ ~~;;; i ~~~ ~I ' ~ / \. tJC ~ ' ~ "" f(ff;, '- \. '- " SHEET NO. \. \.\. L 3.0 '- CONSTRUCTION NOlES I "' '" - ~ !lye LEGEND " ..... 0 " " 1) TRANSI110N CURB TO TIP OUT '" - w EXISTING CONTOUR " 2) TRANSI110N CURB TO TIP IN -841- ;;S EXISTING WA TERMAIN -I-I- e; " 3) WA lERMAIN AND WA lER SER\4CE PIPING SHA\.L HAVE A MINIMUM EXISTING SANITARY I- COVER OF 7.5' u EXISTING STORM -)>->)- i!! ~ I- 0 l:l 4) REMOVAl liMITS MUST BE MARKED BY THE ENGINEER PRIOR TO EXISTING GAS -G-G- '" '" " " "- VI CONSTRUCTION. A\.L DlSlURBEO AREAS OUTSIOE OF THE APPROVED ~f~pS~~7~~ EXISTING CABLE -TV-lY- '" REMOVAL liMITS SHA\.L BE RESTORED AT THE CONTRACTORS EXPENSE '" ~ w w INY 831.55 0 0 5) PARKING LOT SUBGRADE MUST PASS A lEST RO\.L PRIOR TO THE PROPOSED WA TERMAIN -1-1- PLACEMENT OF CL V AGGREGA lE BASE PROPOSED SANITARY 845 PROPOSED STORM eo 0 50 6) WHERE PAVEMENT TO BE REMOVED ADJOINS EXISTING PAVEMENT THAT IS -))-)>- ~--- . >' >' TO REMAIN INPLACE. THE PAVldENT SHA\.L BE SAYlCUT. PROPOSED BIT REMOVAL _~"d III ;; III f;J <D e SCALE: 1"=50' '" ~ "" 7) THE CONTRACTOR SHA\.L BE RESPONSIBLE FOR THE PROlECTlON OF A\.L " [;J TREES AND SHRUBS UNLESS OTHERWISE NOlED. in '" :I: THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES THAT ARE SHOW, ARE SHOWN IN AN APPROXIMATE WAY ONLY. 0 0 " B) THE CONTRACTOR SHA\.L LOCAlE AND PROlECT A\.L SPRINKLER SYSlEMS IT IS NOT GUARANTEED THAT ANY OR ALL EXISTING UTILITIES ARE SHOWN. THE CONTRACTOR SHALL DETERMINE THE >-::1.... I- (INCIDENTAL) ~9'& EXACT LOCATION OF ALL EXISTING UTILITIES 8EFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR "''''j!O 0 ANY AND ALL OAMAGES WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND z s;::~ ;" ALL UNDERGROUND UTILITIES. ~<.... 846 SAN MH 2 NOTIFY GOPHER STATE ONE -CALL fuF!:~ ~ 1-80D-252-1166 OR 651-454-0002 ceo TOP B45,5O a."", -; INV 833,93 VI<1:l >- INV B33.B3 THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY LEVEL B. THIS QUALITY LEVEL WAS ;!t5~ w '" . DETERMINED ACCORDING TO THE GUIDELINES OF Cf/ASCE 38-02. ENTILED "STANDARD GUIDELINES FOR ~~i5~ ,,-0 "-Z THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA," ~~~8 w '0 ~ffi~2 :J DETAILS :~~~ ~~f~ ~I<Dl<llW>[ FINISHED GRADE ~Sm~ ~~~~ 9yB 6~~~ l:! ~~5~ '" _:::s:<:3 0 - 1S LVWE-450JOB anUMINOUS WEARING COURSE (2350) 2.5- BlTUUINOUS WEARING COURSE BITUMINOUS TACK COI\T (2357) (LWiE4S03OB) (2350) 2.0" LVNW35030B BIlUMiNOUS BAse: COURSE (2350) 6~ AGGREGATE SASE ClASS 5 , , S- AGGREGATE BASE. CLASS 5. 100~ CRUSHED LIMESTONE (2211) ~:~~~~u:v.~iSi(~~~2~2211) APPROVEO SUBCRADE (/) Z ~ PARKING LOT SECTION BITUMINOUS TRAIL 0 I - (/) Dlj..f 5 L w a:: I OJlOIJMt:l..-tNlDalI'IlI_ IlU__I-.lOIIN WIl~ - __It(Qll'-'l 'It'!; PWl ~ 1.5- LWiE45OJOa BITUMINOUS wEARiNG COURSE (2350) 0::: BIlUMINOUS TACK COAT (2357) - ~~5~G~~~A~3:S~~~~~U~. BASE COURSE (2350) <( ~ ~g~~8S~jBG~SW~~2~221 1} a.. I z STREF'T PATr.H 0::: :'5 w tii a. - ~ I W \lA' :c ...J 40.81 () F ALL ELEVATIONS ARE tii :::> TO TOP OF CURB a 0.5. ~ SECTION A-A. DIMENTIONS ARE TO ~- W ~ BACK OF CURB _IUN(IltOItGSKoI<I.Ill:..IIt'....e :s: =~~..::=_O'''$O" I g Ol>g I'OUIA)'111.'COIIcPIffE:~ ( J..'ftlU\;OltHMr~~l)I[ b:: W_'0nc~SfD'OII ~"...... B 612 'll_I9t_[CI.lAm STORM MANHOLE W C> m-- Z I--ro----l () @-- Z 52 w Ct: , Cl ~ ........ . .. .... > ;-:::::~'D~5"V-r--$O~ lW;ll;(Y'CoRII o RU8B:ERGASKrT. 0 0::: PlA....",EworlWD' @ n.DUIIL..t WATUITlOHJ a.. ~;.,.:;,,:.~.~ SfAL TO IlE" APPROVED 8'f [PlCnIErA. <D StW'E. DEPTH1J.lO SLOPE (W It/YERT TO BE APPAOVI:O ",'-Wr ~ =::I 8T~NEER. ~ta 1--1.... I~: ~:r o STmRflNFORCEOPl.ASllC J-'_1WrJ STEPSSHAlt.arA ~I EL€YATION VIEW Of IW.lP POlYJ'ROPnENE Pl.A$TIC RElNroActO WITH A -~ PlAN NO. 2 DEl'OIlI,l!l)STm ROO (IAAD[ W. ..... ~",,;, ,~~.~. ~....,.": ,:,'".. ;,,~. ..".... ":.:' CD I,lN/OOl TYPE "8" ECCENTRIC ,..,.:..,..' ".II'~ . coP.1CUI(-'l '::'~,1;~ PREC1&TCONCIlOEa>><<: .,' ....:;, " .:~ SECTION A.'" SECT10NfYPICAlfOR IO"";.'~ ~'W AU.~HQI.lS. rLi--~ ~=.. II'" ::':';>:;':""'''''I} o COHCRflEADJUSllNGRlNGS 001 .' --~ J,IIW1,l\lJ,l 2 RINGS (.4 lNCHrS) ..w-,v.~.......) ~. MAXlUUl,l18.INCWOltW ::::::::" ... :,~~>.'~~;.~';' __ ~ ~ II 2~:~ \Ea. """".. ,~~ -2 Jjr. .........; 1------1' ':t/I..(M) a/l"wt. 'lIOI. 1"'._17,.... ==1If:#.J0lll1l\W,. llO..,rSECOOM II. "'lH.INTECIlAL \:"~~li.:,,~ . . ~ '.. 4 .,' TRlIllCATtD nnuf IJ[TNL SECllON 8-8 SECTION A A PREUS,T CONCROE 1lA$[ SHEET NO. RfFERTO.PlIIlHS NOltl fORPlPEREQU:RrO TRUNCATED OCU[S USED \IllSt 8E (N l,lN/OOTS N'PmMD PRODLlCJS UST. CROSS PAN C-1 DATEI_ 9dIIf1.tE APP\.Ia. tR\MtATEO l)Olr,\ES AND S1A>JPEO COJ.ltRtTt >>IE NOT PEIlI,IlTTft). SANITARY MANHOLE