Loading...
HomeMy WebLinkAbout17. SMSC Wastewater Reclamation Project-Advisory II SHAKOPEE PUBLIC UTiliTIES of{ tlf\IoL~ MEMORANDUM TO: LOU VAN HOUT, UTILITIES MANAGER FROM: JOHN R. CROOKS, WATER SUPERINTENDE SUBJECT: SMSC WASTEWATER RECLAMATION PROJE- DATE: JUNE 14, 2007 On June 7, I attended an informational presentation by the Shakopee Mdewakanton Sioux Community on a proposed underground discharge system for their newly constructed wastewater treatment plant. A proposed one year pilot study, permitted by EPA Region 5 in Chicago, will investigate the injection of 50 gpm of wastewater effluent underground and potentially into the drinking water aquifer near the Mystic Lake Casino. Eventually the tribe is proposing to increase that discharge to 750 gpm. While the new wastewater treatment facility is state of the art and the effluent will be treated to levels considerably under present regulations, there is still cause for concern as the water supply for Shakopee in directly downstream for the injection point. SMSC has extended an invitation to attend all future meetings regarding the pilot study and updates concerning the proposed reclamation project. It would be the intention to have SPUC attend all meetings and bring back information for Staff as well as Commission members. Thank You.