Loading...
HomeMy WebLinkAbout10.C.1. Consider Approving Street Lights on Eagle Creek Blvd CSAH 17 to CSAH 83pwiA SHAKOPEE TO: Mayor and City Council General Business 10. C. 1. Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director DATE: 04/15/2014 SUBJECT: Consider Approving Street Lights on Eagle Creek Boulevard from CSAH 17 to CSAH 83 (D,E) Action Sought Approval of Street Lights on Eagle Creek Boulevard from County State Aid Highway (CSAH) 17 to County State Aid Highway (CSAH) 83. Background The City will be doing a bituminous overlay and reconstructing the bituminous trail on Eagle Creek Boulevard from CSAH 17 to CSAH 83 this year. Eagle Creek Boulevard used to be a County Road and was turned over to the City in 2006. Previously staff had included a street lighting project for the corridor in 2005 and to utilized the existing overhead power poles for street lights. With the improvement to Eagle Creek Boulevard street and trail, staff worked with Shakopee Public Utilities staff to design the attached street lighting system with LED lights. The recommended street light design from the attached drawings is option "B" and the estimated cost is $54,495.74. The lighting plan meets policy and the power would be donated by SPUC as with lights on other city streets. Staff believes that due to the speed of the roadway and the use of the trail, additional lights will make the corridor use safer for all users. Recommendation Staff recommends to install a street lighting septor on Eagle Creek Boulevard from CSAH 17 to CSAH 83 as attached in Option "B" for safer travel and to meet the recently approved street lighting policy Budget Impact This lighting project would be funded out of the Capital Improvement Fund (CIF) with power donated by SPUC. Relationship to Vision This supports Goals D: Maintain, improve and create strong partnerships with other public and private sector entities; and E: Deliver effective and efficient public services by a staff of well- trained, caring, and professional employees. Requested Action Approval of Street Lights on Eagle Creek Boulevard from CSAH 17 to CSAH 83. Attachments: Options A & B CIP Sheet Street Lights Location Map PROJECT NAME: DEVELOPER/ADDRESS: DATE ESTIMATE PREPARED: Fixture 160W LED 34' Aluminum Pole 12' Street Light Arm #4 Street Light Wire #6 Wire in 1 -1/4" Interduct Clamps and Connectors Photo Cell Fuse Labor /Equipment for PP Lights Labor /Equipment for AI Pole Lights Labor /Equipment for Change Ex Lights PROJECT NAME: DEVELOPER/ADDRESS: DATE ESTIMATE PREPARED: 2014 ESTIMATE SHEET Eagle Creek Blvd Street Lighting - Option "A" :ity of Shakopee - Bruce Loney N5/2014 EST. PREPARED BY: PRICE # RE 'D EXTEN. $ 687.06 32 $ 21,985.92 $ 815.46 2 $ 1,630.92 $ 230.85 23 $ 5,309.55 $ 0.26 14780 $ 3,842.80 $ 0.91 440 $ 400.40 $ 18.00 32 $ 576.00 $ 5.35 25 $ 133.75 $ 3.73 25 $ 93.25 $ 412.50 23 $ 9,487.50 $ 1,012.50 2 $ 2,025.00 $ 82.50 7 $ 577.50 Material and Labor Total: $ 46,062.59 Engineering and Misc Material 15% Adder: $ 6,909.39 TOTAL COST: Fixture 160W LED 34' Aluminum Pole 12' Street Light Arm #4 Street Light Wire #6 Wire in 1 -1/4" Interduct Clamps and Connectors Photo Cell Fuse Labor /Equipment for PP Lights Labor /Equipment for Al Pole Lights Labor /Equipment for Change Ex Lights 2014 ESTIMATE SHEET Blvd. lee - 8 PRICE $ 687.06 $ 815.46 $ 230.85 $ 0.26 $ 0.91 $ 18.00 $ 5.35 $ 3.73 $ 412.50 $ 1,012.50 $ 82.50 W.O. # TBI) Notes ighting - ;Option "B" W.O. # TBD By EST. PREPARED BY: CJ1F # RE 'D 32 3 22 14550 660 32 25 25 22 3 7 EXTEN. $ 21,985.92 $ 2,446.38 $ 5,078.70 $ 3,783.00 $ 600.60 $ 576.00 $ 133.75 $ 93.25 $ 9,075.00 $ 3,037.50 $ 577.50 Material and Labor Total: $ 47,387.60 Engineering and Misc Material 15% Adder: $ 7,108.14 TOTAL COST: Notes Citv of Shakooee Capital Imorovement Proaram 2005 - 2009 Project Manager Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction CR 16 Street Lights $30,000 A, Expenditure Items: 2005 2006 2007 2008 2009 Land & ROW Construction 30,000 Improvements Engineering /Admin. Total 30,000 - - - - B. Funding Source: General Fund Capital Improvement Funds 30,000 Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Flow Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk Tax Levy Total 30,000 - - - - - Description: Install street lights along CR 16 from CSAH 17 to CR83. v r � R(P �k E T LO A ON Justification: To provide street lighting along CR 16 trail and CR 16 for public safety all I 4 ,M Other Comments: i b Oaeratin Costs: e SPUC provides the power and minor maintenance as contribution to the City. �� 0 i0tl aY �: �,.:. -0 •'. Move Lrt r t E Light t Pule ,. 8 3k• 3e °_. to Eas ail it Option "B.... � Nor 16UY e V LED • -� ,i '.>� O �` �'"� `• • � � WooU Pole ~Y � f 3ePlacaE I �p �' -• x rt u nwt+PSPrwr, a 200 40U `4w d ,ti t 6 Y • N � � r � i NewteOW LED -Power P;.� e Y � T , 4 I .: Ex 250W H { -. Ttaif t �� � > 1 p x r� r k , s New I60W LED NewleOW LED teOW LED Now 160W LED NOW 160W LED a Pole -Power Pole -Power Pole Po r Pole -34' At Pole i of ali A .,option B'1 V a •'. Move Lrt r t E Light t Pule ,. 8 3k• 3e °_. to Eas ail it Option "B.... � Nor 16UY e V LED • -� ,i '.>� O �` �'"� `• • � � WooU Pole ~Y � f 3ePlacaE I �p �' -• x rt u nwt+PSPrwr, a 200 40U `4w d ,ti t 6 Y • N � � r � i NewteOW LED -Power P;.� e Y � T , 4 I .: Ex 250W H { -. Ttaif t �� � > 1 p x r� r