Loading...
HomeMy WebLinkAbout4.C.2. Apprve Trail Extension Quarry Lake to Gateway Dr Consultant Contract, Project No. 2014-7pwtA Consent Business 4. C. 2. SHAKOPE TO: Mayor and City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director DATE: 04/15/2014 SUBJECT: Approve Trail Extension Quarry Lake to Gateway Drive Consultant Contract, Project No. 2014 -7 (E) Action Sought Authorize the appropriate City officials to execute the Consultant Contract with WSB & Associates, Inc. for the Trail Extension Engineering Services from Quarry Lake to Gateway Drive. Background Earlier this year, the City was awarded a $100,000.00 grant from the Shakopee Mdewakanton Sioux Community (SMSC) for a trail connection from Quarry Lake to Gateway Drive. This trail extension will be a continuation of a trail designed with the Valley Park Business Center Project. Staff has obtained a proposal from WSB & Associates, Inc. for the trail design and construction surveying services. Staff is not available to design the trail and the cost can be included as a cost to be reimbursed by the SMSC grant. Attached to this memo is the proposal detail services and costs and a map showing the location of the trail. The location of this trail design will be through Outlots A & B Valley Park 13th Addition. The City has a Drainage & Utility Easement over the entire Outlots and is working with the land owner to secure a trail easement once the design is done. Recommendation Staff recommends to execute the Extension Agreement with WSB & Associates, Inc. as City staff is not available. Budget Impact Expenditures such as on bids to construct the trail and engineering services may be used with the $100,000.00 SMSC grant. Potentially, it could affect the Capital Improvement Fund if project costs go over $100,000.00. Relationship to Vision This supports Goals D: Maintain, improve and create strong partnerships with other public and private sector entities; and E: Deliver effective and efficient public services by a staff of well - trained, caring, and professional employees. Requested Action Authorize the appropriate City officials to execute the Consultant Contract with WSB & Associates, Inc. for the trail extension engineering services from Quarry Lake to Gateway Drive. Attachments: Map Location and Contract March 17, 2014 Mr. Bruce Loney, PE City of Shakopee 129 S. Holmes Street Shakopee, MN 55379 Re: Quarry Lake Park Trail Improvements Estimate of Cost to Provide: • Topographic Survey Services • Design Services • Construction Staking and Record Drawing Services Dear Mr. Loney: We propose to provide our services for this project, as described below, on an hourly cost - reimbursable basis in accordance with our current fee breakdown (attached). The areas for this work are shown in red on the attached figure and will be coordinated with the areas shown in yellow and blue: • Red trail area: Proposed construction • Yellow trail area: Trail to be completed with Valley Park Business Center Project • Blue trail area: Future trail for access to bridge overpass across HWY 169 Scope and Project Understanding: Topographic Survey: • WSB will complete a topographical survey of the project area. • Survey will include all shots necessary to prepare a set of construction plans including: 1. Shots at all match in points 2. Shots to establish existing vertical and horizontal alignment 3. Property irons to establish existing right -of -way 4. Cross sections 5. Public and private utilities including pipe and structures. 6. Boring locations (coordinate with Geotechnical company) 7. Small utilities (have utilities located through Gopher State One Call and maps of small utilities in the area). • Proposed fee: $2,622 Project Management: • Management and administration of the WSB project team • Coordination and communication with City and other project stake holders (i.e. property owners, utilities, permitting agencies) • Proposed fee: $588 Design Services: • Construction plans o Title sheet o Miscellaneous Details • Trail plans and profiles • Erosion Control and Turf Establishment • Specifications and Quantities K:\Shakopee \Quarry Lake Trail 2014\LTR Prop Quarry Lake Trail 3- 17- 14.doe WSB Infrastructure ■ Engineering ■ Planning ■ Construction 701 Xenia Avenue South & Assocfnlcs. 11W. Suite #300 Minneapolis, MN 55416 Tel: 763 541 -4800 Fax: 763 541 -1700 March 17, 2014 Mr. Bruce Loney, PE City of Shakopee 129 S. Holmes Street Shakopee, MN 55379 Re: Quarry Lake Park Trail Improvements Estimate of Cost to Provide: • Topographic Survey Services • Design Services • Construction Staking and Record Drawing Services Dear Mr. Loney: We propose to provide our services for this project, as described below, on an hourly cost - reimbursable basis in accordance with our current fee breakdown (attached). The areas for this work are shown in red on the attached figure and will be coordinated with the areas shown in yellow and blue: • Red trail area: Proposed construction • Yellow trail area: Trail to be completed with Valley Park Business Center Project • Blue trail area: Future trail for access to bridge overpass across HWY 169 Scope and Project Understanding: Topographic Survey: • WSB will complete a topographical survey of the project area. • Survey will include all shots necessary to prepare a set of construction plans including: 1. Shots at all match in points 2. Shots to establish existing vertical and horizontal alignment 3. Property irons to establish existing right -of -way 4. Cross sections 5. Public and private utilities including pipe and structures. 6. Boring locations (coordinate with Geotechnical company) 7. Small utilities (have utilities located through Gopher State One Call and maps of small utilities in the area). • Proposed fee: $2,622 Project Management: • Management and administration of the WSB project team • Coordination and communication with City and other project stake holders (i.e. property owners, utilities, permitting agencies) • Proposed fee: $588 Design Services: • Construction plans o Title sheet o Miscellaneous Details • Trail plans and profiles • Erosion Control and Turf Establishment • Specifications and Quantities K:\Shakopee \Quarry Lake Trail 2014\LTR Prop Quarry Lake Trail 3- 17- 14.doe Mr. Bruce Loney, PE City of Shakopee March 17, 2014 Page 2 of 2 Bidding quote administration Permit Applications (all permit fees would be paid for by the City) o MPCA NPDES Permit • Shakopee Grading Permit • Lower Minnesota Watershed District Permit (if necessary) Proposed fee: $9,434 Construction Staking: • Construction staking for the items shown in the construction plans • Proposed Fee: $2,622 As- builts /Record Drawings: • Survey field- constructed improvements • Revise the construction plans to reflect the field- constructed conditions • Provide record drawing documents in PDF format for use by the City • Provide CAD file of record drawings in a digital format. • Proposed Fee: $777 Project Total Fee: • Our hourly billing rates and hours for each task are shown on the attached cost breakdown. • Proposed Design and Topographic Survey Fee: $12,644 • Proposed Construction Staking and As -built Fee: $3,399 • Proposed Project Total Fee: $16,043 This letter represents our understanding of the requested services. If you are in agreement, please sign on the space provided and return one original signed copy to us for our records. If you have any questions concerning this letter or fee as discussed herein, please feel free to contact me at 763 - 287 -7189. We greatly appreciate the opportunity to assist you and the City of Shakopee in the completion of this project. Sincerely, WSB & Associates, Inc. ,'-A2)r- Don Sterna, P.E. Principal I hereby authorize WSB & Associates, Inc. to proceed with the above - referenced Scope of Work in accordance with WSB's current fee schedule. City of Shakopee Authorized Representative City of Shakopee Mayor City of Shakopee City Administrator Date Date Date K:\Shakopee \Quarry Lake Trail 2014\LTR Prop Quarry Lake Trail 3- 17- 14.doe Date Printed: 3/17/2014 WSB Filename: K: \Personal \Chuck Kochmann \Quarry Lake Park \Project Area Map.dgn Quarry lake Park Trail Improvements SHAKOPEE City of Shakopee, Minnesota Project Area Map A WSB QUARRY LAKE PARK TRAIL EXTENSION CITY of SHAKOPEE, MINNESOTA Date 3/17/14 DETAIL DESIGN Estimated Hours Cost Project Manager Project Engineer/ Supervisor Design Engineer/ Tech CADD Tech V 2- Person Survey Crew Clerical Total Hours Task No. Description 1 TOPOGRAHPIC SURVEY 4 14 18 $ 2,622.00 A. Survey/ Base Mapping 1 2 4 14 18 $ 2,622.00 2 PROJECT MANAGEMENT 1 4 1 14 1 18 $ 3,399.00 A. Management 4 JHourly Costs 4 $ 588.00 3 TRAIL DESIGN Total Labor and Expenses $452.00 1 $2,170.00 1 J$ 3,399.00 A. Title Sheet/ Misc. Details 4 8 12 $ 1,416.00 B. Trail Plans and Profiles 6 16 4 26 $ 3,028.00 C. Erosion Control/ Turf Plans 4 8 4 16 $ 1,868.00 D. Specifications/ Quantities 2 8 4 14 $ 1,446.00 E. Quote Administration 4 2 6 $ 844.00 F. Permits 1 2 4 2 8 Is 832.00 Total Hours 10 1 18 44 12 1 14 1 6 1 104 is 12,644.00 Hourl Costs 147.00 1 128.00 113.00 113.00 1 155.00 1 62.00 Total Labor and Expenses 1 $1,470.00 1 $2,304.00 $4,972.00 $1,356.00 1 $2,170.00 1 $372.001 1 $ 12,644.00 CONSTRUCTION SERVICES Estimated Hours Cost Project Manager Project Engineer/ Supervisor Design Engineer/ Tech CADD Tech V 2- Person Survey Crew Clerical Total Hours Task No. Description 4 Construction Staking 4 14 18 $ 2,622.00 5 As-built/Record Drawings 1 2 1 2 6 1 $ 777.00 Total Hours 1 4 1 14 1 18 $ 3,399.00 F- JHourly Costs 147.00 128.00 113.00 113.00 155.00 1 62.00 Total Labor and Expenses $452.00 1 $2,170.00 1 J$ 3,399.00 Shakopee Quarry Lake Trail Extension design estimate 3- 17- 14.xls 3/17/2014