Loading...
HomeMy WebLinkAbout5.C.1. Award a Contract for the East Shakopee industrial Sewer Improvement Project No. 2013-4 and Aprrove Change Order No. 1, Res. no. 7429 Consent Business 5. C. 1. SHAKOPEE TO: Mayor and City Council Mark McNeill, City Administrator FROM: Jeff Weyandt, Assistant City Engineer DATE: 03/18/2014 SUBJECT: Award a Contract for the East Shakopee Industrial Sewer Improvement Project No. 2013 -4 and Approve Change Order No. 1, Res. No 7429 (E) Action Sought Adopt Resolution No.7429, a resolution which accepts the bid from Heselton Construction Inc., for the East Shakopee Industrial Sewer Improvements Project No. 2013 -4 and approves a 5% contingency amount on this project for use by the City Engineer in authorizing change orders or quantity adjustments on this project. Also to pass a motion approving Change Order No. 1 for the project. Background On September 3, 2013, City Council adopted Resolution No. 7344, which rejected all bids for the East Shakopee Industrial Sewer Improvements and called for plans to be revised and the project rebid. On February 12, 2014, a bid opening was held for the Project, in which there were four bids opened for this improvement project. The bids are summarized in the attached resolution. From the bid opening, the low bidder is Heselton Construction, Inc. with a bid of $392,487.50. The engineers estimate for this project is $440,000.00 Prior to the rebid, Union Pacific Railroad indicated a plastic casing pipe under the railroad would be permitted. After bidding the project, the railroad changed this requirement to a steel casing pipe. The project was bid with a plastic casing pipe. If Council awards the project, a motion approving change order No. 1 will also be required. Change Order No. 1 will add $68,670.00 to the original bid. This new amount would be $461,157.50 which compares to the previous low bid on August 16, 2013 of $508,658.61, which was rejected. If Council awards the contract, staff is also requesting a contingency amount equal to 5% of the contract to cover minor change orders and quantity adjustments that may occur on the project. Also a motion approving change order No. 1 is being requested as well. Recommendation Staff recommends approving Resolution No.7429, a resolution which accepts the bid from Heselton Construction, Inc. for the East Shakopee Industrial Sewer Improvements Project No. 2013 -4 for a cost of $392,487.50; approve a 5% contingency amount on this project for use by the City Engineer in authorizing change orders or quantity adjustments on this project and pass a motion approving Change Order No. 1. Budget Impact This project will be funded by assessments and the sanitary sewer fund. Relationship to Vision This supports Goal E: Deliver effective and efficient public services by a staff of well - trained, caring, and professional employees. Requested Action Adopt Resolution No.7429, a resolution which accepts the bid from Heselton Construction Inc., for the East Shakopee Industrial Sewer Improvements Project No. 2013 -4 and approves a 5% contingency amount on this project for use by the City Engineer in authorizing change orders or quantity adjustments on this project. Also to pass a motion approving Change Order No. 1 for the project. Attachments: RESOLUTION NO. 7429 Location Map Change Order 1 RESOLUTION NO. 7429 A Resolution Accepting Bids For For The East Shakopee Industrial Sewer Improvements Project Project No. 2013 -4 WHEREAS, pursuant to an advertisement for bids for the East Shakopee Industrial Sewer Improvements, Project No. 2013 -4, bids were received, opened on February 12, 20134, and tabulated according to law, and the following bids were received complying with the advertisement: Bidder Amount HESELTON CONSTRUCTION INC $392,487.50 CHARD TILING & EXCAVATING INC $439,904.00 GM CONTRACTING INC $511,207.79 PENN CONTRACTING INC $613,112.00 WHEREAS, it appears that Haselton Construction, Inc., 680 NW 24 Street, PO BOX 246, Faribault, MN 55021 is the lowest responsible bidder for the East Shakopee Sewer Improvements. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA: 1. The appropriate City officials are hereby authorized and directed to enter into a contract with Haselton Construction, Inc. in the name of the City of Shakopee for the East Shakopee Industrial Sewer Improvements Project according to the plans and specifications therefore approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted in session of the City Council of the City of Shakopee, Minnesota, held this day of , 2014. Mayor of the City of Shakopee ATTEST: City Clerk ENGR/ 2014- PROJECTS2014- EASTSHAKOPEEINDUSTRIAL/ WORD/2014/RES7429- AWARD - CONTRACT &ChangeOrder CITY OF SHAKOPEE MN CONSTRUCTION PLANS FOR EAST SHAKOPEE INDUSTRIAL SEWER IMPROVEMENTS - 2013 CITY PROJECT NO. 2013 -4 RE -BID ISSUE SHEET INDEX SHEET NO JANUARY, 2014 TITLE i - 1 TITLE __ \ SHEET PLAN REVISIONS / .��____...— ._ —A__..__ 1 .. T- \ - LEGEND 2 LE DATE SHEET NUMBER APPROVED BY 3 SHEET INDEX r ----. \ ---)j • ' \ T _ _ - - -- 4 SW PPP � � STANDARD CONSTRUCTION DETAILS — _ 5 - 9 DETAILS ■ I — j- - - -.-- ; � i UTILITY PLAN AND PROFILES i _^ PROJECT LOCATIO } rl -I 4 10 -21 SANITARY SEWER PLAN &PROFILE ( `\ . F- -_ — I __ MAP OF THE MN CITY OFSHAKOPE: . — -- \ ` �. j SCOTT DOWDY, - REMOVALS AND RESTORATION 1 ... f r 22 -33 REMOVAL &RESTORATION I �� f S s T1 i rI \` -1 1 A 6 ; ' RESOURCE UST COY LIST � --� � : .� xNOSME " OW Nat 0 I ! i( ST _ _ � r� �� .. I I9"�s�93�P — — A ► ,r 7 ,r� M; MnWOr.IOr - �♦.) hMTNeA1 Dry EINMeerNNHR wens [wooer wee LPPeY \ ll. v I , r � \ ,. (9s:t z39a9a, i'�� - Au heR Dl Fry9un' ,A9 J- —1�5 + te; > > , -- - (953) }33A36} a Lmx0MITAx,I - -- �� . k A n9 (- _ �. — _ emm.a MCMCIk Q CI1ASkA MN 55918 , I U 41 " S Tj - 195AMBS930 T NOTE. EXISTING MAY INFORMATION SHOWN ON THIS PLAN HAS BEEN -_ - j T 141-14M- " `- -- PROVIDED BY THE UTILITY OWNER . THE CONTRACTOR SHALL FIELD VERIFY �`�� . 4 1 , I J L I � -•� EXACT LOCATIONS PRIOR TO COMMENCING CONSTRUCTION AS REQUIRED BY TI .°. i ` I �4 . Cl t iI �. / I ♦ �� I /,U I � 'fo. itl4 f;- 1 STATE O NY ♦��, , I � * I � r� ! I 1 1 GOPHER CALL, l- 800.251. 116608 ��� � IIB ' 1 ' � �� S I� /i►�un - -� t � �� �� ss1- asa -0002. O DDDZ. \ T ,<Q N hr�� m (tr . 1 4 .0 I I S 11 ' • 1 L THESUB SU 0002. 0 EUTILIYINFRMATIONINTHISPLANTSUIUYQUALrV f �' ,,�88i� " II -- LEVEL D r f � I S %' �I�h � � ���A{ �� `�� r 1 It - I GUIDELINES OF CI /ASCE3R02, ENTITLED "STANDARD GUIDELINES FOR THE � \\ \ \�1 �, / CITY OF SHAKOPEE, MN • � j �.j�� , � , � i , \1 �f I - �-- y COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA" 129 SOUTH HOLMES ST "' �9 �.r,,0U��i G 1 � Q es . , - - 'I SHAKOPEE, MN 55379 I NEMMY CERTIFY TNAT TOD PM, SPECIFICATION. OR REPORT WAS PREPARED (952) 233 - 9300 phone RV ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DOLT 3CEMMED (952) 233 - 31301 fax PRDFESSpNAI ENGINEER TINDER THE TAWS 000XE STATE OF MINNFS0IA W a MAP LEGEND L O Ca— o VDnu SJ1 J.5(1. 1Y1 �1OJS J'J -'Jti BIDLCAION REVxWEDa AVeROYE BID lOUTION . DOT: / �� //� * EXCESS EXCAVATED ' U A MATERIAL DISPOSAL SITE COMMUNITY PRIDE SINCE 1867 D 0000 2000 BOLTO .3. MENK, INC. BITUMINOUS MILLINGS ".=, _. CITY OF SHAKOPEE, MINNESOTA MIA RLwmP,cuwFFAIA9P Iym A MA, Consulting Engineer. E & SurvNyoro DE. SMOCKS SITE EAST SHAKOPEE INDUSTRIAL SEWER IMPROVEMENTS -2013 1 SCALE FEET OF nEIT. MR IDOWSVI MN ` r ,,," „, MTWAR-DOCCEUAegMNN SUM MAPLEWOOD. mx TITLE SHEET 33 WM)Mx ROCIOSTEAMD MIE9W SPERRER CHANGE ORDER Change Order No.: 1 Project Name:East Shakopee Industrial Sewer Imp. Date: March 11, 2014 Contract No.: 2013 -4 Original Contract Amount $ 392,487.50 Change Order (s) No. thru No. $ Total Funds Encumbered Prior to Change Order $ 392,487.50 Description of Work to be Added: 12" Steel Casing with 3" PVC JDR Carrier Pipe w /spacers -277 L.F. at $273.60/L.F. Excavating Jacking Pit- Lump Sum at $3,962.80 Note: All work shall be completed in accordance with Section 02445 -Jack and Auger Steel Casing and as emailed to the contractor on 3/4/14. Description of Work to be Deleted: 3" Forcemain- Directional Drill Design -with casing 277 L.F. at $40.00 = $11,080.00 The amount of the Contract shall be increased by $ 68,670.00 The number of calendar days for completion shall be (increased) by 0 days Original Contract Amount $ 392.487.50 Change Order (s) No. 1 thru -- $ 68,670.00 Total funds Encumbered $ 461,157.50 Completion Date: No Change The undersigned Contractor hereby agrees to perform the work specified in this Change Order in accordance with the specification, conditions and prices specified herein. Contractor By: Date: APPROVED AND RECOMMENDED: City Engineer Date / ti< < nor. 109Q ClOJa Y Y'/ UC l 680 NW 24th Street • P.O. Box 246 • Faribault, MN 55021 Phone: (507) 334 -3901 • Fax: (507) 334 -0114 TO: City of Shakopee ATTENTION: Jeff Weyandt Date: 3/13/14 Re: East Shakopee industrial Sewer Improvement - Jacking Revision Pricing to Jack and Bore 12 " Steel Casing under Rail Road Tracks and TH 169 Overpass. Quote Includes: 1. Excavate Jacking Pit. 1 Is $3,962.80 $3,962.80 2. Install 12" Steel Casing 277 If $270.00 $74,790.00 3. Install 3" Carrier Pipe with Spacers. 277 If $3.60 $997.20 Total $79,790.00 Total Price for above work: $79,750.00 Respectfully Submitted, Mike Heselton Heselton Construction, LLC 111 An Equal Opportunity Employer