HomeMy WebLinkAbout5.C.1. Award a Contract for the East Shakopee industrial Sewer Improvement Project No. 2013-4 and Aprrove Change Order No. 1, Res. no. 7429 Consent Business 5. C. 1.
SHAKOPEE
TO: Mayor and City Council
Mark McNeill, City Administrator
FROM: Jeff Weyandt, Assistant City Engineer
DATE: 03/18/2014
SUBJECT: Award a Contract for the East Shakopee Industrial Sewer Improvement Project No.
2013 -4 and Approve Change Order No. 1, Res. No 7429 (E)
Action Sought
Adopt Resolution No.7429, a resolution which accepts the bid from Heselton Construction Inc.,
for the East Shakopee Industrial Sewer Improvements Project No. 2013 -4 and approves a 5%
contingency amount on this project for use by the City Engineer in authorizing change orders or
quantity adjustments on this project. Also to pass a motion approving Change Order No. 1 for the
project.
Background
On September 3, 2013, City Council adopted Resolution No. 7344, which rejected all bids for the
East Shakopee Industrial Sewer Improvements and called for plans to be revised and the project
rebid.
On February 12, 2014, a bid opening was held for the Project, in which there were four bids
opened for this improvement project. The bids are summarized in the attached resolution. From
the bid opening, the low bidder is Heselton Construction, Inc. with a bid of $392,487.50. The
engineers estimate for this project is $440,000.00
Prior to the rebid, Union Pacific Railroad indicated a plastic casing pipe under the railroad would
be permitted. After bidding the project, the railroad changed this requirement to a steel casing
pipe. The project was bid with a plastic casing pipe. If Council awards the project, a motion
approving change order No. 1 will also be required. Change Order No. 1 will add $68,670.00 to
the original bid. This new amount would be $461,157.50 which compares to the previous low bid
on August 16, 2013 of $508,658.61, which was rejected.
If Council awards the contract, staff is also requesting a contingency amount equal to 5% of the
contract to cover minor change orders and quantity adjustments that may occur on the project.
Also a motion approving change order No. 1 is being requested as well.
Recommendation
Staff recommends approving Resolution No.7429, a resolution which accepts the bid from
Heselton Construction, Inc. for the East Shakopee Industrial Sewer Improvements Project No.
2013 -4 for a cost of $392,487.50; approve a 5% contingency amount on this project for use by the
City Engineer in authorizing change orders or quantity adjustments on this project and pass a
motion approving Change Order No. 1.
Budget Impact
This project will be funded by assessments and the sanitary sewer fund.
Relationship to Vision
This supports Goal E: Deliver effective and efficient public services by a staff of well - trained,
caring, and professional employees.
Requested Action
Adopt Resolution No.7429, a resolution which accepts the bid from Heselton Construction Inc.,
for the East Shakopee Industrial Sewer Improvements Project No. 2013 -4 and approves a 5%
contingency amount on this project for use by the City Engineer in authorizing change orders or
quantity adjustments on this project. Also to pass a motion approving Change Order No. 1 for the
project.
Attachments: RESOLUTION NO. 7429
Location Map
Change Order 1
RESOLUTION NO. 7429
A Resolution Accepting Bids For
For The East Shakopee Industrial Sewer Improvements Project
Project No. 2013 -4
WHEREAS, pursuant to an advertisement for bids for the East Shakopee Industrial Sewer
Improvements, Project No. 2013 -4, bids were received, opened on February 12, 20134, and
tabulated according to law, and the following bids were received complying with the advertisement:
Bidder Amount
HESELTON CONSTRUCTION INC $392,487.50
CHARD TILING & EXCAVATING INC $439,904.00
GM CONTRACTING INC $511,207.79
PENN CONTRACTING INC $613,112.00
WHEREAS, it appears that Haselton Construction, Inc., 680 NW 24 Street, PO BOX 246,
Faribault, MN 55021 is the lowest responsible bidder for the East Shakopee Sewer Improvements.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
SHAKOPEE, MINNESOTA:
1. The appropriate City officials are hereby authorized and directed to enter into a
contract with Haselton Construction, Inc. in the name of the City of Shakopee for the East Shakopee
Industrial Sewer Improvements Project according to the plans and specifications therefore approved
by the City Council and on file in the office of the City Clerk.
2. The City Clerk is hereby authorized and directed to return forthwith to all bidders
the deposits made with their bids, except that the deposits of the successful bidder and the next
lowest bidder shall be retained until a contract has been signed.
Adopted in session of the City Council of the City of Shakopee,
Minnesota, held this day of , 2014.
Mayor of the City of Shakopee
ATTEST:
City Clerk
ENGR/ 2014- PROJECTS2014- EASTSHAKOPEEINDUSTRIAL/ WORD/2014/RES7429- AWARD - CONTRACT &ChangeOrder
CITY OF SHAKOPEE MN
CONSTRUCTION PLANS FOR
EAST SHAKOPEE INDUSTRIAL SEWER IMPROVEMENTS - 2013
CITY PROJECT NO. 2013 -4
RE -BID ISSUE SHEET INDEX
SHEET NO
JANUARY, 2014 TITLE
i -
1 TITLE
__ \ SHEET
PLAN REVISIONS / .��____...— ._ —A__..__ 1 .. T- \ - LEGEND
2 LE
DATE SHEET NUMBER APPROVED BY 3 SHEET INDEX
r ----. \ ---)j • ' \
T _ _ - - -- 4 SW PPP
� � STANDARD CONSTRUCTION DETAILS
— _ 5 - 9 DETAILS
■ I — j- - - -.-- ; � i UTILITY PLAN AND PROFILES
i _^ PROJECT LOCATIO }
rl -I 4 10 -21 SANITARY SEWER PLAN &PROFILE
(
`\ . F- -_ — I __ MAP OF THE
MN CITY OFSHAKOPE:
. — -- \ ` �. j SCOTT DOWDY, - REMOVALS AND RESTORATION
1 ...
f r 22 -33 REMOVAL &RESTORATION
I �� f S s
T1 i rI \` -1 1 A 6 ; ' RESOURCE UST
COY LIST
� --� � : .� xNOSME "
OW Nat
0 I ! i( ST
_ _ � r� �� .. I I9"�s�93�P
— — A ► ,r
7 ,r� M; MnWOr.IOr
- �♦.) hMTNeA1
Dry EINMeerNNHR wens [wooer
wee LPPeY
\ ll. v I , r � \ ,. (9s:t z39a9a,
i'��
- Au heR Dl Fry9un'
,A9 J- —1�5 + te; > > ,
-- - (953) }33A36}
a Lmx0MITAx,I
- -- �� . k A n9 (- _ �. — _ emm.a MCMCIk
Q CI1ASkA MN 55918
, I U 41 " S Tj - 195AMBS930
T NOTE. EXISTING MAY INFORMATION SHOWN ON THIS PLAN HAS BEEN
-_ - j T 141-14M-
" `- -- PROVIDED BY THE UTILITY OWNER . THE CONTRACTOR SHALL FIELD VERIFY
�`�� . 4 1 , I J L I � -•� EXACT LOCATIONS PRIOR TO COMMENCING CONSTRUCTION AS REQUIRED BY TI
.°.
i ` I �4 . Cl t iI �. / I ♦ �� I /,U I � 'fo. itl4 f;- 1 STATE O NY
♦��, , I � * I � r� ! I 1 1 GOPHER CALL, l- 800.251. 116608
��� � IIB ' 1 ' � �� S I� /i►�un - -� t � �� �� ss1- asa -0002.
O DDDZ.
\ T ,<Q N hr�� m (tr . 1 4 .0 I I S 11 ' • 1 L THESUB SU 0002. 0 EUTILIYINFRMATIONINTHISPLANTSUIUYQUALrV
f �' ,,�88i� " II -- LEVEL D r f � I S %' �I�h � � ���A{ �� `�� r 1 It - I GUIDELINES OF CI /ASCE3R02, ENTITLED "STANDARD GUIDELINES FOR THE
� \\ \ \�1 �, /
CITY OF SHAKOPEE, MN • � j �.j�� , � , � i , \1 �f I - �-- y COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA"
129 SOUTH HOLMES ST "' �9 �.r,,0U��i G 1 � Q es . , - - 'I
SHAKOPEE, MN 55379 I NEMMY CERTIFY TNAT TOD PM, SPECIFICATION. OR REPORT WAS PREPARED
(952) 233 - 9300 phone RV ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DOLT 3CEMMED
(952) 233 - 31301 fax PRDFESSpNAI ENGINEER TINDER THE TAWS 000XE STATE OF MINNFS0IA
W
a
MAP LEGEND L O Ca—
o VDnu
SJ1 J.5(1. 1Y1 �1OJS J'J -'Jti BIDLCAION REVxWEDa AVeROYE
BID lOUTION . DOT:
/ �� //�
* EXCESS EXCAVATED ' U
A MATERIAL DISPOSAL SITE
COMMUNITY PRIDE SINCE 1867 D 0000 2000 BOLTO .3. MENK, INC. BITUMINOUS MILLINGS ".=, _. CITY OF SHAKOPEE, MINNESOTA MIA
RLwmP,cuwFFAIA9P Iym A MA,
Consulting Engineer. E & SurvNyoro DE. SMOCKS SITE EAST SHAKOPEE INDUSTRIAL SEWER IMPROVEMENTS -2013 1
SCALE FEET
OF
nEIT. MR IDOWSVI MN
` r ,,," „, MTWAR-DOCCEUAegMNN SUM MAPLEWOOD. mx TITLE SHEET 33
WM)Mx ROCIOSTEAMD MIE9W SPERRER
CHANGE ORDER
Change Order No.: 1 Project Name:East Shakopee Industrial Sewer Imp.
Date: March 11, 2014 Contract No.: 2013 -4
Original Contract Amount $ 392,487.50
Change Order (s) No. thru No. $
Total Funds Encumbered Prior to Change Order $ 392,487.50
Description of Work to be Added:
12" Steel Casing with 3" PVC JDR Carrier Pipe w /spacers -277 L.F. at $273.60/L.F.
Excavating Jacking Pit- Lump Sum at $3,962.80
Note: All work shall be completed in accordance with Section 02445 -Jack and
Auger Steel Casing and as emailed to the contractor on 3/4/14.
Description of Work to be Deleted:
3" Forcemain- Directional Drill Design -with casing
277 L.F. at $40.00 = $11,080.00
The amount of the Contract shall be increased by $ 68,670.00
The number of calendar days for completion shall be (increased) by 0 days
Original Contract Amount $ 392.487.50
Change Order (s) No. 1 thru -- $ 68,670.00
Total funds Encumbered $ 461,157.50
Completion Date: No Change
The undersigned Contractor hereby agrees to perform the work specified in this Change
Order in accordance with the specification, conditions and prices specified herein.
Contractor
By:
Date:
APPROVED AND RECOMMENDED:
City Engineer Date
/ ti<
< nor. 109Q
ClOJa Y Y'/ UC l
680 NW 24th Street • P.O. Box 246 • Faribault, MN 55021
Phone: (507) 334 -3901 • Fax: (507) 334 -0114
TO: City of Shakopee
ATTENTION: Jeff Weyandt
Date: 3/13/14
Re: East Shakopee industrial Sewer Improvement - Jacking Revision
Pricing to Jack and Bore 12 " Steel Casing under Rail Road Tracks and TH 169 Overpass.
Quote Includes:
1. Excavate Jacking Pit. 1 Is $3,962.80 $3,962.80
2. Install 12" Steel Casing 277 If $270.00 $74,790.00
3. Install 3" Carrier Pipe with Spacers. 277 If $3.60 $997.20
Total $79,790.00
Total Price for above work: $79,750.00
Respectfully Submitted,
Mike Heselton
Heselton Construction, LLC
111
An Equal Opportunity Employer