Loading...
HomeMy WebLinkAbout10.C.2 Approval of Sewer Service Connection for timber Creek Furniture Store at 1038 First Avenue PoNtA General Business 10. C. 2. SHAKOPEE TO: Mayor and City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director DATE: 11/19/2013 SUBJECT: Approval of Sewer Service Connection for Timber Creek Furniture Store-1038 First Avenue (E) -Added to Agenda 11/19/13 Action Sought Authorize sewer service connection expenditures for the Timber Creek Furniture Store at 1038 First Avenue out of the Sanitary Sewer Fund. Background In 2011, CR 101 was reconstructed and the sanitary sewer system in CR 101 was reconstructed as well. Sanitary sewer services were replaced and services not being used were abandoned. During the sewer replacement on 1 st Avenue from Prairie Street to Naumkcag Street, the sewer service connection to the Timber Creek furniture store was inadvertently disconnected from the main line. The water usage of the furniture store was such that the problem was not detected until recently. The sewer service that was provided to the area was connected by the new dental office building. The location of the service line is adjacent to the dental office property and this land was sold by the Timber Creek store owner. With the Timber Creek Furniture store sewer service not connected, staff reviewed options to reconnect their service. One option was to connect to the Dental office service. Both owners do not want to share a service. Attached is a drawing showing a new service location to the alley and then east to the Naumkeag Street sewer which is the option deemed to be the best by staff. Cost of installing this sewer line is estimated to be over $15,000 and staffs estimate is $30,000 which needs Council approval. Staff is obtaining quotes for the pipe installation which requires rock excavation and the quotes were not available at this time. Recommendation Approve a motion authorizing staff to pay for a sewer service connection for Timber Creek Furniture store. Budget Impact Cost of this sewer work could be from the Sanitary Sewer Fund. r r par > y i - • d l r. + JF fi C LEAN 36 "{ !!� I [=736.99 °]' My' " i'IMBERCREEK FURNITURE STORE .* ' �•-I . .1038 FIRST AVENUE . Y_r '' a•�. SHAKOPEE 1 e- �"' +•''� •tae • PID#270041240 r Y a I OWNER: Mr.Dirks,Peter A. r v s � , � lJC•1�9fi'�'F AY Co[e4Drill.FL!=U& i - ' 5 VI r • 91j OI-Y r. ,• , '1 �� "x g •" "�i . ;SU-2UO CY Rack � + r1< ,- _ea MI-148•W/Casting CCC --� �^- \' +/,i 227-LP PVC Pipe " Ica Com-Drillv/Bm Ica ��� U� • Wn-t i r�r rtrlt 1l`t- 't _ Clean Out N LD Ica 4rx 6. 729.92 ea 45°Il ns 11 6' i11 gIG1C1-OI'-\\\Y FL O 7-=729.80 Sewer Rock as needed r FkIN 73_5.01. e. FL`OU� 73 .92 w..•" '" + �:. 1+' ? Please bid: Y Q 'Dime mid Material.(,Quintiles am a � 1-it only to aid in hiding. t' z " 18-NOV-2013 • 1 Relationship to Vision This supports goal E, deliver effective and efficient public services by a staff of well trained, caring and professional employees. Requested Action Authorize sewer service connection expenditures for the Timber Creek Furniture Store at 1038 First Avenue out of the Sanitary Sewer Fund Attachments: Man