Loading...
HomeMy WebLinkAbout13.A.2. Authorize Preparation of Plans for 2007 Cured-In-Place-Pipe Project, Project No. 2007-6 I ~. ft. ~ · CITY OF SHAKOPEE Memorandum to: Mayor & City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director SUBJECT: Authorize Preparation of Plans for 2007 Cured-In-Place-Pipe (CIPP) Project, Project No. 2007-6 DATE: March 6, 2007 INTRODUCTION: This agenda item is to direct staff to prepare plans and specifications for the 2007 CIPP Project, Project No. 2007-6. BACKGROUND: The 2007 Capital Improvement Program (CIP) includes $130,000.00 for the annual cured-in-place pipe project. Staff will evaluate the existing sanitary sewer system and determine which lines should be included in the 2007 project. In 2006 the City successfully completed the first annual CIPP project, which included 4,100 feet of 8" sanitary sewer pipe. ALTERNATIVES: 1. Authorize staff to prepare plans and specifications for the 2007 CIPP Project. 2. Do not authorize staff to prepare plans and specifications for the 2007 CIPP Proj ect. 3. Table for additional information. RECOMMENDATION: Staff recommends Alternative No.1, to authorize the preparation of plans and specifications in order to proceed with the 2007 CIPP Project, as outlined in this memo. ACTION REQUESTED: Authorize staffto prepare plans and specifications for the 2007 CIPP Project, Project No. 2007-6. Ie:~ Public Works Director BUpmp H:\2007 ENGINEERING PROJECTS\2007 CIPP\MEMO_auth.Jllans,doc City of Shakopee Capital Improvement Program 2007 -2011 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Sanitary Sewer Annual Cured-in-Place Pipe Project A. Expenditure Items: 2007 2008 2009 2010 2011 Land & ROW Construction 130,000 130,000 130,000 130,000 130,000 Improvements Engineering/Admin. 20,000 20,000 20,000 20,000 20,000 Total 150,000 150,000 150,000 150,000 150,000 B. ,Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base 150,000 150,000 150,000 150,000 150,000 Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base " Storm Drainage Fund-Trunk I Tax Levy U1 .j::. Total 150,000 150,000 150,000 150,000 150,000 f Description: Annual cured-in-place pipe project. ~ Justification' Necessary to extend the lift of existing sanitary sewer. Other Comments: OperatinQ Costs: PROJECT LOCATION ~ ~ r--: ~ ,-.-----., .---, r----"1 r-1 r-J C I .i ~ ~ ,.............. ~ ------; ~ ~ -----; ---, J ~ i..,! " i