CITY OF SHAKOPEE
Memorandum
to: Mayor & City Council
Mark McNeill, City Administrator
FROM: Bruce Loney, Public Works Director
SUBJECT: Authorize Preparation of Plans for 2007 Cured-In-Place-Pipe (CIPP)
Project,
Project No. 2007-6
DATE: March 6, 2007
INTRODUCTION:
This agenda item is to direct staff to prepare plans and specifications for the 2007 CIPP
Project, Project No. 2007-6.
BACKGROUND:
The 2007 Capital Improvement Program (CIP) includes $130,000.00 for the annual
cured-in-place pipe project. Staff will evaluate the existing sanitary sewer system and
determine which lines should be included in the 2007 project. In 2006 the City
successfully completed the first annual CIPP project, which included 4,100 feet of 8"
sanitary sewer pipe.
ALTERNATIVES:
1. Authorize staff to prepare plans and specifications for the 2007 CIPP Project.
2. Do not authorize staff to prepare plans and specifications for the 2007 CIPP
Proj ect.
3. Table for additional information.
RECOMMENDATION:
Staff recommends Alternative No.1, to authorize the preparation of plans and
specifications in order to proceed with the 2007 CIPP Project, as outlined in this memo.
ACTION REQUESTED:
Authorize staffto prepare plans and specifications for the 2007 CIPP Project, Project No.
2007-6.
Ie:~
Public Works Director
BUpmp
H:\2007 ENGINEERING PROJECTS\2007 CIPP\MEMO_auth.Jllans,doc
City of Shakopee Capital Improvement Program 2007 -2011
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Sanitary Sewer Annual Cured-in-Place Pipe Project
A. Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 130,000 130,000 130,000 130,000 130,000
Improvements
Engineering/Admin. 20,000 20,000 20,000 20,000 20,000
Total 150,000 150,000 150,000 150,000 150,000
B. ,Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base 150,000 150,000 150,000 150,000 150,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
" Storm Drainage Fund-Trunk
I Tax Levy
U1
.j::. Total 150,000 150,000 150,000 150,000 150,000
f Description:
Annual cured-in-place pipe project.
~ Justification'
Necessary to extend the lift of existing sanitary sewer.
Other Comments:
OperatinQ Costs:
PROJECT LOCATION