HomeMy WebLinkAbout12.B. 17th Avenue Sports (Soccer) Complex Building Redesign Schematic Design Review
I A .8,
CITY OF SHAKOPEE
MEMORANDUM
To: Parks and Recreation Advisory Board
From: Mark Themig, Parks, Recreation, and Facilities Director
Meeting Date: March 6, 2006
Subject: 17th Avenue Sports (Soccer) Complex Building Redesign
Schematic Design Review
INTRODUCTION
This agenda item seeks review of the proposed schematic redesign for the 1 ih Avenue
Sports Complex building, and authorization to proceed with plans and specifications.
BACKGROUND
The original design for the 17th Avenue Sports Complex support building came in over
budget, and City Council rejected the bids. The architect that did the initial design is no
longer with BKV, so we had been in some limbo for a period of time while a new
architect was assigned. BKV assigned Victor Pechaty to lead the redesign, and several
potential design element changes were presented to the Parks and Recreation Advisory
Board at their December 2005 meeting. Based on their feedback, we provided direction
to Mr. Pechaty on the function of the building, and asked him to come up with a redesign
that would fall within the project budget.
DISCUSSION
Proposed Redesign
As you will see, the building retains the same basic floor plan as the original building with
restrooms, concessions, a small meeting room, and storage. However, there are
significant changes in the overall design:
. Roof
The building now features a single metal roof structure instead of three separate
roofs. The roof structure covers approximately the same area as before, and features
a long, continuous slope to address snow melt and refreezing. It also contains
covered openings to allow light into the breezeway space. (The exact design of the
openings is still to be finalized.) The single roof structure is a significant cost savings.
One significant item of concern for us was the proposed extension of the roof visible
just beyond the trees in the model. This extension would provide an easy access to
the roof, and would need to be eliminated from the design. Mr. Pechaty concurred
with our opinion and would eliminate this from.the redesign.
. Doors Openings and Windows
The proposed redesign reduces the number of doorways by relocating entrances to
the restrooms. Instead of two entrances, there is one. In order to provide more
natural light into the restoorms, windows are proposed along the sides. Finally, the
large overhead doors in the meeting room have been replaced with glass windows
and double doors. All the proposed changes are substantial cost savings.
. Materials
The proposed redesign features different materials for portions of the building,
although the exterior would continue to use materials similar to the new Public
Utilities well house on 1ih Avenue (brick). (The model does not show the color that
would be used on the exterior.)
. Site Layout
I think one of the most striking improvements in the redesign is the proposed layout.
First, the building has been turned to better fit the available space between fields.
(We did talk with Mr. Pechaty about whether a north/south or east/west alignment
would be better, and concurred that the north/south alignment better fits the site.)
In addition, the redesign features a tree-lined entryway that will ultimately provide
shade. Finally, the proposed redesign features additional landscaping and lighting to
help accent the site.
I have also attached a floor plan and photos of the model, although I think the viewing
the model in person is much more helpful.
Updated Cost Estimates
The updated cost estimate for the redesign is $451,132. This includes all estimated
building permits, water connection charges, and sewer connection fees. The estimate
also includes an allocation for heating the building ($33,518), which would provide some
comfort level for early spring/late fall use, although not year round (the cost estimates
don't include insulation). We discussed this with the Parks and Recreation Advisory
Board, and they asked us to continue work on the HVAC component, including
evaluating the feasibility of air conditioning for the meeting rooms and concession are
during the summer months, if the budget supports it. However, they also recognized that
without insulation, it may not make sense to do any heating and cooling.
The CIP contains $493,000 for building construction, so at this point, we are within
budget.
Bidding and Construction Timing
Initially, I had considered an option of proposing to wait to bid the soccer building until
the design on the aquatic building was complete and bid both buildings together. This
could result in savings for both buildings. However, the delay in bidding could also
negate any savings due to inflation.
Another option came up last week during a meeting with SPUC. SPUC will begin work
this summer on two wells and a pump house located on the west side of the sports
complex. The architect for the pump house is also BKV. Since we are using the same
architect for both buildings, it would make more sense to look at bidding the City's
building and the pump house together. This appears possible, but we still need to
finalize timelines to determine whether or not this approach would worK.
Under this approach, work on the City's building could begin late spring, and SPUC's
building would follow later this year. The City's building would not be complete for
summer use, but may be available for the fall program.
PARKS AND RECREATION ADVISORY BOARD DISCUSSION/RECOMMENDA TION
The Advisory Board reviewed the schematic design and recommended approval to City
Council, with the following considerations:
. We need to provide an allowance for picnic tables in the budget.
. If additional funds are available, we should consider a shade structure for the picnic
area.
. We need to evaluate heating/cooling options and the funds that are in the initial cost
estimates, as well as insulation. If feasible within the project budget, consider
heating/cooling for the building.
The Board also discussed the concept of a play structure adjacent to the building.
However, it was not included in the recommendation at this time.
REQUESTED ACTION
City Council is asked to review the schematic redesign of the 1 th Avenue Sports
Complex building, and if you concur, move to authorize plans and specifications.
Ci of Shako ee Capital 1m rovement Pro ram 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Mark Themig Special Facility Construction 17th Avenue Sports Complex 536 000
Year Added to CIP:
A. Ex enditure Items: 2006 2007 2008 2009 2010
Land & ROW
Construction 521,000
Improvements
Engineering/Admin. 15,000
Total 536 000 - - - -
B. : Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 536,000
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total 536 000 - - - - -
DescriDtion
This project would provide funding for completion of the 17th Avenue Sports Complex.
Construction: Completion of Phase 2, $520,000 (Park Reserve)
Building, inc. permits -$493,000
Water and Sewer Fees - $13,000
Fencing - $10,000
ADA Modifications - $5,000
Engineering/Admin: Architectural fees $15,000 (Park Reserve)
Justification
This project completes the development of a major sports complex that will serve the City's needs for many
years. The building will need to be constructed of durable materials that will stand up to public use, as well as
abuse (vandalism). Costs reflect similar buildings.
Other Comments
There was an extensive design process that produced the original design for the building, which bid in spring
2005. Low bid ($528,000) was overbudget. On June 7,2005, City Council set a maximum construction budget
of $520,000 for Phase 2.
ODeratina Costs
Estimated operating costs: $5,000
.,
Estimate Detail- Shakopee Park & Recreation
>etail - With Taxes and Insurance ,Indirect Costs are Spread Group 1: Divisions
Group 2: Major ItemCode Groups
:stimator : Mike Heffron Group 3: Minor Item Code Groups
'roject Size: 1792 SF
ltemCnde Descriotion Quantity UM Tot lJnitCost TotalCost
ieneral requirements
Administrative requirements
Project management and coordination
01310.100 Project manager
......... ....._..........................._...____._..".'mm.......____m". 1,000.00
01310.210 Purchase drawings 500.00 LS 2.000
Construction progress documentation
01320.100 progess photographs 6.00 MO 134.000 804.00
.. Administrative requirements $75.896
Quality requirements
Quality control
Laboratory testing 5,000.00 LS 1.000 5,000.00
Quality requirements
Temporary facilities and controls
Temporary utilities
Job telephone
Construction facilities
01520.130 Water, ice and cups 4.00 MO 142.500 570.00
Construction aids
01540.511 5,148.00 SOFT 0.590 3.037.32
Project identification
01580.100 Job sign 2.00 EACH 389.000 778.00
.. Total Temporary facilities and controls
Execution requirements
Cleaning
01740.100 Job clean up 1,792.00 SOFT 0.110 197.12
01740.110 Clean glass 1.000.00 SOFT 0.750 750.00
Estimate Detail- Shakopee Park & Recreation
letllil- With TllXes and Insurance ,Indirect Costs are Spread Group 1: Divisions
Group 2: Major llemCode Groups
:stimator : Mike Heffron Group 3: Minor ItemCode Groups
'roject Size: 1792 SF
ItemCode Descriotion Quantity lJM Tot UnitCod TotalCnst
... Total Cleaning $3,747
.. Tolal Execution requirements $3,747
. Tolal General requirements $92,580
Uework
Site preparation
Site preparation
02200.100 landscape Allowance 1.00 EACH 15,000.000 15,000.00
.. Total Site preparation
Earthwork
Excavation and fill
02316.001 Fine grade floor by hand SOFT 1.791
02316.100 Machexcav continuous fooling 90.00 CUYD 8.779 790.12
.. Total Earthwork
Bases, ballasts and pavement
Unbound courses and ballasts
02720.041 limestone sub base 34.00 CUYD 19.515 663.50
Rigid pavement
02750.020 Concrete paving finish 3,920.00 SOFT 0.369 1,445.70
'02750.025~'Fj;;e9radeiorco;;creie'pavi;;g~' ..~.'^'^ . ~'3,920.00 . SOFT ""'ii:i21 ........ 888.27 ......... ........~-~~.~....~.~ ~.. .....~~ .. .... ...~..... ..... ~~... "''''"''~_"'~,^'__.'''^~"n'' ~_,_.,~ ^,^,,""~"_.,.^," ^.,.w...~...,~.~ ,'""C ^'"_~ ._.~_._^~".^" ^""'~'.^^,^'^M^n...~"'" "'",,~~','.'_~'O^'. '^"^'",^,^U.~, ,...."^",.._.^'.". ,_u,"'__'^'"
..______......m..."."...__......'n......"....______...".......""'_m_." 28.00 CUYD 105.06
02750.030 Add for screeds-<Xlncrete paving 3.752
()27S().043 '4)(4414
Curbs and gutters
02770.153 3500 psi concrete 31.00 CUYD 83.594 2,591.40
Sidewalks
02775.330 Trowel and broom sidewalk 3,920.00 SOFT 0.485 1,901.98
cure
... Tolal Sidewalks
.. Total Bases, ballasts and pavement $11,021
. T alai Sitework $33,695
:oncrete
Estimate Detail- Shakopee Park & Recreation
lelail - With Taxes and Insurance ,Indirect Costs are Spread Group 1: Divisions
Group 2: Major ItemCode Groups
:stimator: Mike Heffron Group 3: Minor llemCode Groups
'roject Size: 1792 SF
ItemCod'e DescriDtion Quantity UM Tot UnitcMt TotalCrn;t
Formwork
Structural CIP forms
03110.510 Continuous footing edge fonns 240.00 SOFT 8.753 2,100.82
. ""...__.____..n..... ".______........_._..._'..n..........____ __...."...."................ $2,101
... Total Structural CIP forms
.. Total Formwork $2,101
Concrete reinforcing
Reinforcing steel
0.35 TONS 456.59
..
Cast in place concrete
Structural concrete
03310.365 31.00 CUYD 142.517 4,418.02
Finishing
03350.112 Finish footing concrete top surface 0.088 158.05
Curing
03390.011 Protect and cure vertical surfaces 1,792.00 SOFT
.. Total Cast in place concrete
. Total Concrete
lasonry
Masonry units
Clay masonry units
04210.011 Mortar 15.09 CUYD 109.670 1.655.19
04210.200 Cast StoneSilis 122.00 LNFT 62.500 7,625.00
......m......................,..............._.'.
... Total Clay masonry units
Concrete masonry units
04220.503 8x8x16 concrete block 1.788.00 PCS 7.887 14,101.42
04220.503 8x8x16 concrete block 3,620.00 PeS
........m.m........................n.._. 3.37 TONS 1,029.500 3,471.85
04224.122 Masonry rebar
Estimate De ta i 1- Shakopee Park & Recreation
)etail- With Taxes and Insurance .Indirect Cosls are Spread Group 1: Divisions
Group 2: Major IlemCode Groups
:slimalor :. Mike Heffron Group 3: Minor Item Code Groups
'roject Size: 1792 SF
lip-meade DeAcrintion Ouantitv UM Tot Uniteost TnlalCost
... Total Concrete masonry units $45,152
.. Total Masonry units $77,752
Masonry restoration and cleaning
Unit masonry cleaning
04930.011 Clean face brick 3,232.00 SQFT 0.454 1,466.68
04930.014 Clean block 1,600.00. SOFT 1.225 1,960.48
.. Total
. Total Masonry $81,179
letals
Metal fabrications
Formed metal fabrications
05580.501 Steel lintel 46.00 LNFT 5.810 267.28
.. Total Metal fabrications $267
. Total Metals $267
lood and plastics
Rough carpentry
Wood framing
33.94 LBS 1.088 36.92
Sheathing
06160.173 518" OSB @roof 3,232.00 SOFT 0.688 2,222.00
.. Total Rough carpentry
Finish carpentry
Finish carpentry
06200.100 314" Birch Veneer Plywood 3,456.00 SOFT 2.312 7,989.58
... Total Finish carpentry $10,318
.. Total Finish carpentry $10,318
Architectural woodwork
Standing and running trim
06450.570 Lookouts and ledgers 238.48 BDFT 4.086 974.48
Estimate Detail- Shakopee Park & Recreation
letail - With Taxes and Insurance .Indirect Costs are Spread Group 1: Divisions
Group 2: Major ltemCode Groups
:stimalor : Mike Heffron Group 3: Minor Item Code Groups
'roject Size: 1792 SF
ItemCode . Descrintion Ouantitv UM Tnt UnitCost TntalCost
Wood frames
06460.041 6070 Frame 3.00 EACH 239.418 718.25
.............,...._____.....n..'...................____._..........._____....... $718
... Total Wood frames
.. Total Architectural woodwork $2,299
. Total Wood and plastics $40,733
hennal a,nd moisture protection
Thermal protection
Roof and deck insulation
07220.042 40Ib felt 1.00 SQS 19.022 19.02
.. Total Thennal protection
Shingles, tiles and roof coverings
Shingles, tiles and coverings
07309.900 . Roof area. 3.200.00 Sqft
Shingles
07310.141 3OIbfelt216sqftroll 14.96 ROLL 56.198 840.89
*. Total roof coverings
Roof and siding panels
Metal roof and wall panels
07410.014 22 ga steel roof Standing Seam 13.690
Siding
07460.060 Subfascia 18.68 80FT 2.804 52.36
07460.076 Fascia, lxB 28.00 LNFT 1.159 32.44
0746().9()() Siding nails 6.30 lBS .. 1.331 8.39
.. Total $43,989
. Total Thennal and protection $44,849
100rs and windows
Metal doors and frames
Steel doors and frames
08110.191 1-314" 16ga, A label -
.. Total Metal doors and frames
Hardware
Estimate Detail- Shakopee Park & Recreation
letail- With Taxes and Insurance ,Indirect Gosts are Spread Group 1: Divisions
Group 2: Major ItemCooe Groups
:stimator: Mike Heffron Group 3: Minor ItemCooe Groups
'roject Size: 1792 SF
It~mCode Desr;riDtinn Quantity UM Tnt lJnitcnd TotalCost
Door hardware
08710.109 hardware allowance 500.000 3,500.00
- Total Hardware
Curtainwalls
Metal framedcurtainwalls
08910.020 Exteriorwindowwall 629.00 SOFT 56.000 35,224.00
.. Total Curtainwalls $35,224
. Total Doors and windows $48,704
inishes
Paints and coatings
Paint
09910.034 Paint door frame 13.00 24.477 318.21
High performance coatings
09960.010 Epoxy wall finish 5.516.00 SOFT 1.905 10,505.77
09960.012 Epoxy ceiling finish 2,223.00 SOFT 2.186 4,860.37
.. Total coatings
. Total Finishes
.pecialties
Compartments and cubicles
Metal toilet compartments
10160.020 Floor mounted toilet compartment 7.00 EACH 388.271 2,717.90
- Total Compartments
Manufactured and exterior specialties
Manufactured exterior specialties
10340.010 Skylights 2.00 EACH 4,100.000 8,200.00
.'. ......... ..................,.._.__...n____.u.........__. $8,200
... Total Manufactured exterior specialties
.. Total Manufactured and exterior specialties $8,200
Identification devices
Exterior signage
10430.010 Sign and graphic allowance 2.00 ALLO 500.000 1,000.00
lIt* TotaJ
Estimate Detail- Shakopee Park & Recreation
letaH - With Taxes and Insurance, Indirect Costs are Spread Group 1: Divisions
Group 2: Major ItemCode Groups
:stimator: Mike Heffron Group 3: Minor ItemCode Groups
'roject Size: 1792 SF
Ilemeade ne!iicriDtion Quantify UM Tnt lJnitCod TotalCo!;t
Fire protection devices
Fire protection specialties
10520.150 Fire extinguisher 2.00 EACH 73.472 146.94
..............._____.........""".....mm........................................ $147
... Total Fire protection specialties
.. Total Fire protection devices $147
Storage shelving
Storage shelving
mop holder 2.00 EACH 75.485 150.97
.. Total Storage shelving
Toilet and laundry specialties
Toilet accessories
mirror 4.00 EACH 44.167 176.67
.. Total Toilet and laundry specialties $740
. Total Specialties $12,956
lechanical
Plumbing fixtures and equipment
Fixtures
15410.500 Urinal 2.00 EACH 400.618 801.24
Domestic water heaters
15480.085 50 Gal Water Heater 1.00 EACH 974.100 974.10
.. Total Plumbing fixtures and equipment $6,237
Heat generation equipment
Furnaces
15530.000 Fumance 2.00 EACH 9.500.000 19,000.00
.. Total Heat generation equipment
HVAC equipment
HVAC equipment
15700.000 Mechanical Ductwork 575.00 lNFT 25.250 14,518.75
....__....... ....m..........."................,....
... Total HVAC equipment
Estimate Detail- Shakopee Park & Recreation
leiail- With Taxes and Insurance ,Indirect Costs are Spread Group 1: Divisions
Group 2: Major Item Code Groups
:slimator : Mike Heffron Group 3: Minor llemCode Groups
'roject Size: 1792 SF
ItemCnrfA DAscriotion Ouantitv llM Tot Unitenst TotalCrnd
.. Total HVAC equipment $14,519
. Total Mechanical $39,756
,Iectrical
Power
Electrical power
16200.000 Electrical-Outlets 25.00 Each 250.000 6,250.00
... Total Electricalpower $19,050
.. Total Power $19,050
Lighting
Interior luminaires
Electrical Fixtures 17.00 EACH 275.000 4,675.00
Emergency lighting
16530.000 Exit lighting 6.00 EACH 300.000 1,800.00
"'TotaiEmergencyiighilng' .----.. ......-. n'. ........- . ... ..' '$1;800 _, '.~ '~'^'^'^' m ~~_~._.'__~"'Um.__.. ~'-'-'~ __'~~n' _.~'W"~ ,-~.~._^ -,--".~," W'_W" -'-~'---'''-' .__m__..."~._.~~___"
.. Total Lighting $6,475
. Total Electrical $25,525
Total Estimate $451.132