TO: Mayor and City Council
Mark McNeill, City Administrator
FROM: Bruce Loney, Public Works Director
DATE: 07/29/2013
SUBJECT: Authorize the Execution of Cooperative Agreement with Scott County for CH 17 & CH 78
Improvements (D,E)
Action Sought
Authorize the Execution of a Construction Cooperative Agreement with Scott County on the CH 17 & CH 78
Reconstruction Project.
Background
Scott County has obtained Federal Funds for the reconstruction of CH 17 from CH 16 to approximately 800 feet
south of CH 78 and CH 78, from Barrington Drive to CH 17. The plans are complete and ready for obtaining bids.
Attached is the construction cooperative agreement and cost estimates with Federal splits. The costs also include
SPU lateral watermain costs for the Valley View Road Project. The County is constructing protions of Valley View
Road in order to utilitze Federal funds to the fullest, and for relocation of drainways such as for Betaseed & St.
Francis Hospital.
The agreement is for the construction costs associated with the County's project. Previously, a joint right of way
agreement was entered into for acquisition for Valley View Road and storm water ponding off of CR 78
Attached also is a drawing showing the County project limits including Valley View Road.
The cost participation items are mainly for storm sewer, ponding, traffic signals, engineering and work on CH 17,
CH 78 and Valley View Road. The estimated cost participation amount is $750,645.33. Funding of this cost will be
from Surface Drainage Fund, Capital Improvement Fund and assessments.
Recommendation
Authorize the execution of the construction cooperative agreement with Scott County on the CH 17 & CH 78
reconstruction project.
Budget Impact
Project was included in 2013 -2017 CIP and will be funded with Storm Drainage Funds, Capital Improvement
Funds and Assessments on Valley View Road.
Relationship to Vision
This supports Goal D: Maintain, improve and create strong partnerships with other public and private sector
entities; and Goal E: Deliver effective and efficient public services by a staff of well - trained, caring, and
professional employees.
Authorize the Execution of a Construction Cooperative Agreement with Scott County on the CH 17 & CH 78
Reconstruction Project.
Attachments: Construction Cooperative Agreement
County 17 -78 Shakopee Cost Split
Map 17 & 78
County Project No. CP 17 -31 /SP 70- 617 -22
City of Shakopee
County of Scott
CONSTRUCTION COOPERATIVE AGREEMENT
THIS AGREEMENT, by and between the County of Scott, a body politic and corporate under the laws
of the State of Minnesota, hereinafter referred to as the "County" and the City of Shakopee, a body politic and
corporate under the laws of the State of Minnesota, hereinafter referred to as the "City ".
RECITALS:
A. The County and the City seek to reconstruct segments of County Highway (CH) 17 and CH 78, from
CH 16 to approximately 800 feet south of CH 78, as shown on the County Engineer's plans for
County Project No. CP 17 -31 /SP 70- 617 -22 (City Project No. 2012 -7), which improvement
contemplates and includes operational, capacity and safety improvements for safety of the traveling
public, (hereinafter referred to as the Project)
A. The City also seeks to construct an extension of Valley View Road on new alignment in
coordination the Project an existing terminus of Valley Road westerly of County Highway 17 to
Sarazin Street with a design being an urban city street.
B. The County has agreed to construct part of the City project with the project because of efficiencies with
driveway relocations as a part of the Project. The portion of Valley View to be included the Project is
approximately 597 feet west of CH 17 to approximately 544 feet east of CH 17.
C. The County and the City seek to install and or modify a fully- actuated traffic control system with mast
arms and integral street lights on CH 17 at the intersections of CH 16 (17 Avenue), Valley View Road
and CH 78 with the Project .
D. The City seeks to construct the remaining portion of this alignment under its separate city project
known as Project 2012 -7 with construction planned concurrently with the County's Project as
shown on the attached Exhibit "B" (hereinafter referred to as "City Project ");
E. The above described Project lies within the corporate limits of the City of Shakopee.
F. The County Engineer has prepared an engineer's estimate of quantities and unit prices of material and
labor for the above described Project and an estimate of the total cost for contract work in the sum of
Seven Million, One Hundred Seventy Six Thousand, Seven Hundred Twenty Five Dollars and Sixty Six
cents ($7,176,725.66). A copy of said estimate (marked Exhibit "C ") is attached hereto and made a part
hereof.
G. It is contemplated that all of the above improvement work shall be carried out by the parties under the
provisions of Minn .Stat. Sec. 162.17, subd. 1.
1
County Project No. CP 17 -31 /SP 70- 617 -22
City of Shakopee
County of Scott
NOW, THEREFORE, IT IS HEREBY AGREED:
1. The County or its agents shall advertise for bids for the work and construction of the aforesaid Project
No. CP 17 -31 /SP 70- 617 -22 receive and open bids pursuant to said advertisement and enter into a
contract with the successful bidder at the unit prices specified in the bid of such bidder, according to law
in such case provided for counties. The contract shall be in form and includes the plans and
specifications prepared by the County or its agents, which said plans and specifications are by this
reference made a part hereof.
2. The County shall have overall authority to administer the contract and inspect the construction of the
contract work for the Project. The County shall have ultimate authority in initiating and determining
change orders, supplemental agreements and final quantities. The City Engineer shall cooperate with
the County Engineer and his staff at their request to the extent necessary, but shall have no other
responsibility for the supervision of the work.
3. The City shall reimburse the County for its share in the construction cost of the contract work for said
Project and the total final contract construction cost shall be apportioned as set forth in the Division of
Cost Summary in said Exhibit "C ". The City shall, based on the contract price, deposit with the Scott
County Treasurer one hundred percent (100 %) of the estimated City's share of the construction and
engineering costs, engineering costs are based on 10% Design, 8% Construction Administration and 3%
Administration of the total city share, as partial payment within thirty (30) days after award of contract
or execution of this Agreement, whichever is later. It is further agreed that the Engineer's Estimate
referred to in this Agreement is an estimate of the construction cost for the contract work on said Project
and that the unit prices set forth in the contract with the successful bidder and the final quantities as
measured by the County Engineer shall govern in computing the total final contract construction cost for
apportioning the cost of said Project according to the provisions of this paragraph. See Exhibit "C ".
4. The cost of the items in which the City shall participate shall be based on the unit prices in the contract
and the final construction quantities as determined by the Project Engineer in charge.
5. The City shall, upon completion of the Project and based on the final contract amount, make payment to
the Scott County Treasurer for the City's share of construction costs of the project, upon submittal to the
City, the County's final itemized statement of the Project costs, on or before December 31, 2014 or until
all obligations set forth in this agreement have been satisfactorily fulfilled whichever occurs later,
whichever occurs first.
2
County Project No. CP 17 -31 /SP 70- 617 -22
City of Shakopee
County of Scott
6. The County Engineer shall prepare monthly progress reports as provided in the specifications. A copy
of these reports shall be furnished to the City.
7. In the event that a dispute arises, the County and the City agree that all disputes between them arising
out of or relating to this Agreement shall be submitted, upon agreement of both parties, to mediation,
with the cost being shared equally. Since each party recognizes each other as a political subdivision of
the State of Minnesota, each party shall maintain general liability and automobile liability coverage
protecting itself, its officers, agents, employees and duly authorized volunteers against any usual and
customary public liability claims to the limits prescribed under Minn. Stat. Sec. 466.04 and Workers'
Compensation and shall be in accordance with the Minnesota statutory requirements. Said policies shall
be kept in effect during the entire term of this Agreement.
8. All records kept by the City and the County with respect to the Projects shall be subject to examination
by the representatives of each party. All data collected, created, received, maintained or disseminated
for any purpose by the activities of the County or City pursuant to this Agreement shall be governed by
Minnesota Statutes Chapter 13, as amended, and the Minnesota Rules implementing such Act now in
force or hereafter adopted.
9. The County has developed the storm water infiltration met the City's requirements and the additional
infiltration provided will be credited for future project needs within the City.
10. The City shall provide and/or perpetuate an adequate electrical power supply to the traffic control signal
systems and integral street lights and upon completion of said new and revised traffic control signal
systems and integral street lights installations shall provide and /or continue to provide necessary
electrical power for its operations at the sole cost and expense of the City.
11. The City agrees that any city license required to perform electrical work within the city shall be issued to
the Contractor or the County at no cost to the Contractor or the County. Electrical inspection fees shall
be not more than those established by the State Board of Electricity in the most recently recorded
Electrical Inspection Fee Schedule.
12. The County shall include Emergency Vehicle Preemption (EVP) system construction with the project.
13. The County and City agree to share in the cost of the EVP system installation equally.
14. The City shall not revise by addition or deletion, nor alter or adjust any component, part, sequence, or
timing of the aforesaid traffic control signal system or EVP system; however, nothing herein shall be
construed as restraint of prompt, prudent action by properly constituted authorities in situations where a
part of such traffic control signal system may be directly involved in an emergency.
3
County Project No. CP 17 -31 /SP 70- 617 -22
City of Shakopee
County of Scott
15. Upon completion of the work, the County shall maintain and repair said traffic control signal systems at
the sole cost and expense of the County. Further, the County shall maintain and repair the EVP systems
and any repairs required shall be at the sole cost and expense of the County. Further, the City shall
maintain the integral streetlights including the luminaire and all its components at the sole cost and
expense of the City, except for the County maintaining electrical energy to the luminaire head at the sole
cost and expense of the County.
16. The EVP systems provided for in this Agreement shall be installed, operated, maintained or removed in
accordance with the following conditions and requirements:
(1) Emitter units may be installed and used only on vehicles responding to an emergency as defined in
Minn. Stat. Secs. 169.01, subd. 5 and 169.03. The City will provide the County Engineer or his duly
appointed representative a list of all such vehicles with emitter units upon request.
(2) Malfunctions of the EVP systems shall be reported to the County immediately.
(3) In the event said EVP systems or components are, in the opinion of the County, being misused or
the conditions set forth herein are violated, and such misuse or violation continues after receipt by the
City of written notice thereof from the County, the County shall remove the EVP systems. Upon
removal of the EVP systems pursuant to this paragraph, the field wiring, cabinet wiring, detector
receivers, infrared detector heads and indicator lamps and all other components shall become the
property of the County.
(4) All timing of said EVP systems shall be determined by the County.
17. Initial pavement striping and markings shall be included as part of the Project. The County shall be
responsible for all subsequent pavement striping and markings on its county roads as required after the
initial work and shall be responsible for one hundred percent (100 %) of the subsequent related costs.
The City shall be responsible for all subsequent striping and markings on its city roads, including
pedestrian markings across its roadways, as required after the initial work and shall be responsible for
one hundred percent (100 %) of the subsequent related costs.
18. The City shall, at its own expense, remove and replace all City owned signs that are within the
construction limits of the Project.
4
County Project No. CP 17 -31 /SP 70- 617 -22
City of Shakopee
County of Scott
19. Neither the County, its officers, agents or employees, either in their individual or official capacity, shall
be responsible or liable in any manner to the City for any claim, demand, action or cause of action of
any kind or character arising out of, allegedly arising out of or by reason of the performance, negligent
performance or nonperformance of the described maintenance, restoration, repair or replacement work
by the City, or arising out of the negligence of any contractor under any contract let by the City for the
performance of said work; and the City agrees to defend, save and keep said County, its officers, agents
and employees harmless from all claims, demands, actions or causes of action arising out of negligent
performance by the City, its officers, agents or employees.
20. It is further agreed that neither the City, its officers, agents or employees, either in their individual or
official capacity, shall be responsible or liable in any manner to the County for any claim, demand,
action or cause of action of any kind or character arising out of, allegedly arising out of or by reason of
the performance, negligent performance or nonperformance of the described maintenance, restoration,
repair or replacement work by the County, or arising out of the negligence of any contractor under any
contract let by the County for the performance of said work; and the County agrees to defend, save and
keep said City, its officers, agents and employees harmless from all claims, demands, actions or causes
of action arising out of negligent performance by the County, its officers, agents or employees.
21. It is further agreed that each party to this Agreement shall not be responsible or liable to the other or to
any other person or entity for any claims, damages, actions, or causes of actions of any kind or character
arising out of, allegedly arising out of or by reason of the performance, negligent performance or
nonperformance of any work or part hereof by the other as provided herein; and each party further
agrees to defend at its sole cost and expense any action or proceeding commenced for the purpose of
asserting any claim of whatsoever character arising in connection with or by virtue of performance of its
own work as provided herein.
22. It is further agreed that any and all employees of the City and all other persons engaged by the City in
the performance of any work or services required or provided herein to be performed by the City shall
not be considered employees, agents or independent contractors of the County, and that any and all
claims that may or might arise under the Worker's Compensation Act or the Unemployment
Compensation Act of the State of Minnesota on behalf of said City employees while so engaged and any
and all claims made by any third parties as a consequence of any act or omission on the part of said City
employees while so engaged shall be the sole responsibility of the City and shall not be the obligation or
responsibility of the County.
5
County Project No. CP 17 -31 /SP 70- 617 -22
City of Shakopee
County of Scott
23. Any and all employees of the County and all other persons engaged by the County in the performance of
any work or services required or provided for herein to be performed by the County shall not be
considered employees, agents or independent contractors of the City, and that any and all claims that
may or might arise under the Worker's Compensation Act or the Unemployment Compensation Act of
the State of Minnesota on behalf of said County employees while so engaged and any and all claims
made by any third parties as a consequence of any act or omission on the part of said County employees
while so engaged shall be the sole responsibility of the County and shall not be the obligation or
responsibility of the City. The provisions of Minn. Stat. Sec. 181.59 and of any applicable local
ordinance relating to Civil Rights and discrimination and the affirmative action policy statement of Scott
County shall be considered a part of this Agreement as though fully set forth herein. See Exhibit "A ".
24. 17.Pursuant to Minn. Stat. Sec. 16C.05, subd. 5, the books, records, documents, and accounting
procedures and practices of the County and City pursuant to this Agreement shall be subject to
examination by the County, City and the State Auditor. Complete and accurate records of the work
performed pursuant to this Agreement shall be kept by the County and City for a minimum of six (6)
years following termination of this Agreement for such auditing purposes. The retention period shall be
automatically extended during the course of any administrative or judicial action involving the County
or the City regarding matters to which the records are relevant. The retention period shall be
automatically extended until the administrative or judicial action is finally completed or until the
authorized agent of the County or City notifies each party in writing that the records no longer need to
be kept.
25. The laws of the State of Minnesota shall govern all questions and interpretations concerning the validity
and construction of this Agreement and the legal relations between the parties and performance under it.
The appropriate venue and jurisdiction for any litigation hereunder will be those courts located with the
County of Scott, State of Minnesota. Litigation, however, in the federal courts involving the parties
shall be in the appropriate federal court within the State of Minnesota.
26. .In the event any provision of this Agreement shall be held invalid and unenforceable, the remaining
provisions shall be valid and binding upon the parties unless such invalidity or non enforceability would
cause the Agreement to fail its purpose. One or more waivers by either party of any provision, term,
condition or covenant shall not be construed by the other party as a waiver of a subsequent breach of the
same by the other party.
6
County Project No. CP 17 -31 /SP 70- 617 -22
City of Shakopee
County of Scott
27. .The County's Authorized Agent for the purpose of the administration of this Agreement is Maria A.
Heller, Supervisor Admin Services, or her successor. Her current address and phone number is Scott
County Highway Department, 600 Country Trail East, Jordan, MN 55352, (952) 496 -8369.
28. The City's Authorized Agent for the purpose of the administration of this Agreement is Bruce Loney,
Public Works Director, or his successor. His current address and phone number is 400 Gorman St,
Shakopee, MN 55379, (952) 233 -9361. Any change in name, address, or telephone shall be noticed to
the other party.
IN TESTIMONY WHEREOF, the parties hereto have caused this Agreement to be executed
by their respective duly authorized officers as of the day and year first above written.
CITY OF SHAKOPEE
(SEAL)
By And
Brad Tabke, Mayor Mark McNeill, City Administrator
Date Date
COUNTY OF SCOTT
ATTEST:
By By
Gary Shelton, County Administrator Thomas J. Wolf, Chair of Its County Board
Date Date
Upon proper execution, this Agreement RECOMMEND FOR APPROVAL:
will be legally valid and binding.
By By
Pat Ciliberto, County Attorney Mitchell J. Rasmussen, County Engineer
Date Date
7
APPROVED AS TO EXECUTION:
By
Pat Ciliberto, County Attorney
Date
http:// teamscoop/ div/ CommunitySvcs/ contracts/PDProjectContracts /CP 17-3 1_Construction Coop_Shakopee LF.docx
EXHIBIT A
POLICY STATEMENT
It is the policy of Scott County Government to provide Equal Opportunity to all employees and
applicants for employment in accordance with all applicable Equal Employment Opportunity
laws. directives, and regulations of Federal, State, and local governing bodies or agencies
thereof, including Minnesota Statutes, Chapter 363.
Scott County will not engage in any employment practices which discriminate against or
harass any employee or applicant for employment because of race, color, creed, religion,
national origin, sex, disability, age, martial status, sexual orientation, or status with regard to
public assistance. Such employment practices include, but are not limited to, the following:
hiring, upgrading, demotion, transfer, recruitment or recruitment advertising, selection, layoff,
disciplinary action, termination, rates of pay or other forms of compensation, and selection for
training, including apprenticeship.
Further, Scott County fully supports incorporation of nondiscrimination rules and regulations
into contracts and will commit the necessary time and resources to achieve the goals of Equal
Employment Opportunity.
Any employee of the County who does not comply with the Equal Employment Opportunity
Policies and Procedures set forth in this Statement and Plan will be subject to disciplinary
action. Any subcontractor of the County not complying with all applicable Equal Employment
Opportunity laws, directives, and regulations of Federal, State, and local governing bodies or
agencies thereof, including Minnesota Statutes, Chapter 363, will be subject to appropriate
contractual sanctions.
Scott County has designated the Employee Relations Director as the manager of the Equal
Opportunity Program These responsibilities will include monitoring all Equal Employment
Opportunity activities and reporting the effectiveness of this program, as required by Federal,
State, and local agencies. The Scott County Administrator will receive and review reports on
the progress of the program. If any employee or applicant for employment believes he or she
has been discriminated against, please contact the Scott County Employee Relations Director,
Scott County Employee Relations, Government Center Room 201, 200 Fourth Avenue West,
Shakopee, Minnesota 55379 -1220, or call (952) 496 -8103.
, 0,--
,,,f
- ,---",..0„—, ),./71.4 i s '
L. 4elton Date Thomas J. Wolf Date
Scott County Administrator Chair, Board of Commissioners
EXHIBIT B Location Map
U i--- --- )
0
END
SP 070 -617 -C
—
ia kopee! / SP 166 -020 -C11M
010 111N
i /40/
40
— I
t Y t
I NI
\ �i� Z
/,
' A lift ----.
9 —7,x ST FRANCIS AVE
w ir
City Project 1 \ j
/� City Proje t
rm
17
00 L
a
M.III�AII ���OMI MOW
'. / / / / / / / / / / / / / % / / / / / /AO, END
A O
BEGIN � SP 070 -678 -002
SP 070 -678 -002 � SP 166 -I 1-016
SP 166 - 020 -016
III 0!
3 i. . •„1NLaN AV
BEG _Al
SP 070 - 61 7 -022
SP 166 -020 -015
A Exhibit B im City Project
NORTH
0 025 05
Miles
EXHIBIT C Division of Cost Summary
S.P. 70- 617 -22 / S.P. 166- 020 -015 / C.P. 17 -31
S.P. 70- 678 -02 / S.P. 166 - 020 -016 / C.P. 78 -04
CONTRACT SCOTT COUNTY CITY OF SHAKOPEE SCOTT SHAKOPEE PUBLIC ST. FRANCIS
COUNTY UTILITIES REGIONAL MEDICAL
SPEC. REM UNIT TOTAL UNIT AMOUNT FEDERAL FEDERAL FEDERAL FEDERAL CENTER
NO. 0019 PRICE TOTAL PARTICIPATING NON - PARTICIPATING TOTAL PARTICIPATING NON-PARTICIPATING NON-PARTICIPATING NON-PARTICIPATING NON- PARTICPATNG NONPARTDPATNG
WANT. WANT. 60% 20% OUANT. 80% 20%
EST WANT. EST.AMOUNT EST QUART. EST. AMOUNT EST OUANT. EST. AMOUNT ESTOUANT. EST. AMOUN" EST WANT. EST. AMOUNT EST QUART. EST. AMOUNT EST OUANT. EST. AMOUNT EST OUANT. EST.AMWNT
2011.601 VIBRATION MONITORING LUMP SUM 1 5,50010 510010 1.00 0.6 4100.00 0.2 1,100.00 _
2021501 MOBILVATION LUMP SUM 1,00 305,000.00 305100.00 0.82 0.690 212.280.00 0.174 53,070.00 0.07 0.056 17,08080 0.014 4270.00 0.02 6,100.00 0.01 3,050.00 0.01 3.05100 0.02 6,100,0
2031.501 FIELD OFFICE TYPED EACH 1.00 10,000.00 10.000.00 088 0.686 6.880.00 0.172 1,720.00 0.07 0358 560.00 0.014 140.00 0.01 100.00 0.01 100.00 0.03 300.00 0.02 200.00
2101.501 CLEARING ACRE _ 0.3 4,500.00 1,350.00 0.3 0.24 1,080.00 0.06 270.00
2101.502 CLEARING TREE 3 150.00 450.00 3 2.4 360.00 0.8 90.00
2101.506 GRUBBING ACRE 0.3 4,500.00 1,350.00 0.3 0.24 1,080.00 016 270.00
2101.507 GRUBBING TREE 3 100.00 300.00 3 2.4 240.00 0.6 60.00
2101.511 CLEARING AND GRUBBING LIMP SUM 1 45,000.00 45,000.00 1 0.0 36,000.00 0.2 9,000.00
2102.502 PAVEMENT MARKING REMOVAL UN FT 110 2.00 220.00 , 110 86 176.00 22 4480
2103.501 BUILDING REMOVAL A LUMP SUM 1 10,000.00 10.000.00 1 0.8 8,000.00 02 _ 2,000.00
2103.501 BUILDING REMOVAL B LUMP SUM 1 10,000.00 10.00100 0.5 0.4 4,000.00 0.1 1,000.00 03 0.4 4,00080 0.1 1800.00
2106.501 REMOVE PIPE CULVERTS LIN FT 756 5.00 3.780.00 756 605 3,024.00 151 756.00
2104.501 REMOVE SEWER PIPE (STORM) UN FT 4,304 7.00 30.128.00 4,304 3.4432 24.102.40 860.8 6.025.60
2104.501 REMOVE CURB 8 GUTTER UN FT 5178 4.00 21.912.00 5,478 4.382 17,529.60 1196 4.382.40
2104.501 REMOVE BITUMINOUS CURB LIN ET 2,130 3.00 6,390.00 2,130 1,704 5,112.00 426 1218.00
2104.501 REMOVE RETAINING WALL LIN FT 35 1.50 52.50 35 28 4 2.00 RETAINING RETAINING 1050
2104.501 REMOVE WATER SERVICE PPE LIN FT _ 45 10.00 450.00 45 36 360.00 9 90.00
214 EM
.501 ROVE SANITARY SEWER SERVICE PPE LIN 71 160 10.00 1,600.00 6 24 240.00 6 80.00 _ 130 1,301011
2104.503 REMOVE BITUMINOUS WALK SOFT 6,698 1.50 10,047.00 6,898 5.358.4 5,037.80 1,339.6 2,00910
2104.503 REMOVE CONCRETE WALK SOFT 3,85 1.00 3,852.00 3,852 3181.6 3,081.60 770.4 770.40
2104.503 REMOVE CONCRETE DRIVEWAY PAVEMENT _ SOFT 2,41 1.50 3,618.00 2112 1,929.8 2,89410 482A 723.60 _
2104305 REMOVE BITUMINOUS PAVEMENT 5O10 6,45 3.00 19,377.00 6,459 5,1672 15,501.80 1291.6 3.57510
2104.509 REMOVE SEPTIC TANK EACH 1,300.00 2,600.00 _ _ 2 210000
2104.509 REMOVE DRAINAGE STRICTURE EACH 2 300.00 8,700.00 29.0 232 6.960.00 5.8 1,740.6
2104.509 REMOVE SIGN EACH 25.00 16.6 4 32 80.6 0.8 20.00
2104.509 REMOVE SIGNAL SYSTEM EACH 5,000.00 5.60.00 0.75 0.60 3.000.00 0.15 750.00 025 1250.00
2104.56 REMOVE MAK BOX SUPPORT EACH 100.00 400.00
• 32 320.00 0.6 80.00
2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 11 10.00 1,110.00 111 682 888.6 222 222.6
2104.513 SAWING 051001NOU5 PAVEMENT (FULL DEPTH) LIN FT 127 2.75 3196.00 1,272 1,017.6 2,79810 2541 699.6
2104.523 SALVAGE HYDRANT d VALVE EACH 1,000.00 1,000.00 1 1,000.00
2104.523 SALVAGE MARKER EACH 1 25.00 350.00 14 350.00
2104323 SALVAGE SIGN EACH 5080 50.00 50.00
2104323 SALVAGE SIGN TYPE C EACH 50 35.00 1 750.6 50 1.750.00
2104.525 ABANDON SEPTIC TANK EACH 800.00 800.00 1 800.00
2104.601 SALVAGE IRRIGATION EOUPMENT LUMP SUM 1200.00 130100 1 0.8 960.00 02 240.00
2104.602 SALVAGE SEPTIC TANK (1) EACH 1.06.00 10016 1 1.0610
2104.62 REMOVE CONCRETE PILLAR EACH 500.00 1.000.6 2 1.6 500.00 0.4 200.00
2104.603 ABANDON PIPE SEWER UN FT 750 3.00 2251000 750 2,250.00
2104.603 REMOVE WATER SERVICE PIPE (IRRIGATION) UN FT 350 8.00 210.00 350 250 2,240.00 70 56.00
2104.603 ABANDON WATER MAIN (IRRIGATION) LIN FT 1,080 5.00 5,400.00 1,080 884 4,320.00 216 1,060.00
2105.501 COMMON EXCAVATION (P) CU TO 138,089 510 _ 66.345.00 133.7912 107,032.48 _ 535,162.40 26,758.12 133,790.6 ,04
1,487 1.190 58.00 297 1,487.00 791.4 3,957.00
2105.515 UNCLASSIFIED EXCAVATION (7) CU VD 32.653 710 228,571.00 16,326.5 13,612 91,428.40 3,265.3_ 22857.10 16,326.6 13.612 91,428/0 3.285.3 22157.10
2105321 GRANULAR BORROW (CV) (P) C1190 55,887 1010 558,870.00 55,887 44,709.8 447,096.00 11,1771 111,774.00
2105.522 SELECT GRANULAR BORROW (CV) CIA 91) 1,500 18.00 27,000.00 1,055.9 847.12 15,248.16 211.78 3.81206 441.1 7,939.80
E TOPSOIL PLACEMENT CV m® 30.00 9, ® ■MEI:3 7800 .00 1.950.6-------- - - - --
2105.607 ELL SPECIAL ONTO 782 45.00 35,190.00 782 625.6 28,152.00 1564 7,038.00
2115.501 AGGREGATE SURFACING CLASS 2 TON 495 25.00 12,375.00 495 398 9,900.00 99 2,475.00
2123.810 STREET SWEEPER (WITH PICKUP BROOM) HOUR 135 120.00 18,320.00 136 108.5 13,058.00 27.2 3,284.6
2211.501 AGGREGATE BASE CL. 5 (2) 7004 1,783 18.00 31.734.00 1,1952 956.15 17.210.88 239.04 4,302.72 5628 10,220.40
2211.503 AGGREGATE BASE (CV) CLASS 5 (7) (2) CU TO 4,119 24.00 90.856.00 2,747 2,197.5 52,74210 549.4 13,185.50 1,372 1,097.6 28,342.40 274.4 6,585.80
Emm 1
AGGREGATE BASE CV CUSS 6 P MM ®" 1 043 545. MIZEIMMEINIERMIIIIIII 208 76 - - - - - - -- - -
2221.501 AGGREGATE SHOULDERING CLASS 2 7051 199 30.00 5,970.00 16 159.2 4,776.00 39.8 1,184.00
2232.501 MILL BITUMINOUS SURFACE (2.01 SO YD 193 5.00 965.00 193 154.4 772.00 38.6 193.00
2301.502 CONCRETE PAVEMENT STANDARD WIDTH 80 50 YD 11,360 7.50 85,200.00 11,380 9.088 68,180.00 2.272 17,040.00
2301.503 CONCRETE PAVEMENT IRREGULAR WIDTH 81' __ SO 90 1,581 8.50 13,438.50 1.581 1284.8 10,750.60 3162 2687.70 _
2301.511 STRUCTURAL CONCRETE CU YD 2,677 80.00 214,160.00 2,677 2141.8 171,32810 5351 42,832.00
2301.513 STRUCTURAL CONCRETE HIGH EARLY CU YD 199 95.00 18,905.00 199 1592 15,124.00 39.8 3,781.00
2301.529 REINFORCEMENT BARS (EPDXY COATED) LB 18,349 000 18.349.00 18,349 14,6792 14,87920 3.669.0 3,889.80
2301881 PERMANENT TERMNAL HEADER LIN FT 257 4010 10280.00 257 268 8.224.00 51.4 2.05100
2301.602 1.25 DOWEL BAR EACH 7,693 650 50,004.50 7,893 6,154A 40,003.80 1338.6 10,000.90
•
W UPNN: 7020913
FED.", ESiMAi6 FINAL.. 1815 PA6W, 7212013
S.P. 70- 617 -22 / S.P. 166-020 -015 / C.P. 17-31
S.P. 70 -678 -02 ! S.P. 166-020 -016 / C.P. 78 -04
CONTRACT SCOTT COUNTY CITY OF SHAKOPEE SCOTT SHAKOPEE PUBLIC ST. FRANCIS
• COUNTY UTILITIES REGIONAL MEDICAL
ITEM UNIT TOTAL UNIT AMOUNT FEDERAL FEDERAL FEDERAL FEDERAL CENTER
ESTD PRICE TOTAL PARTCPATNG NON-PARTICIPATING TOTAL PARTICIPATNG NON-PARTICIPATING NON-PARTICIPATING NON - PARTICIPATING NON-PARTICIPATING NON-PARTICIPATING
OUANT. WANT. 80% 20% GUANT, 80% 2091
EST WANE. EST. AMOUNT ESTOUANT. EST. AMOUNT ESTOUANT. EST. AMOUNT EST OUANT, EST. AMOUNT ESTOUANT. EST, AMOUNT EST OUANT. EST. AMOUNT ESTOUANT. EST. AMOUNT EST OUANT. EST. AMOUNT
00085E MIXTURE (3,0) TON 1,450 74.50 108025.00 766 613 45,553.60 153 11.41340 684 547 4028640 137 10,191.60
1 COURSE MIXTURE (2,C) TON 353 72,50 25,592.50 220,8 178.48 12,794.80 44.12 3,198.70 132.4 9,59900
1 COURSE MIXTURE (3,8) TON 1,491 68.00 101,388.00 1,378 1102,4 74.86320 275.6 18,740.80 113 90.4 6,14720 22.6 1,536.80
1 COURSE MIXTURE (3,E) TON 14,120 70.00 968,400.00 14,120 11,298 790,720.00 2,824 197,680.00
RING COURSE MIXTURE (2.C) TON 406 72,00 29,232.00 330.9 264.72 19,059.84 68.18 4.764.96 75.1 540720
RING COURSE MIXTURE (39) TON 967 67.50 8521250 511 408.8 27,594,00 1022 6,098.50 456 3648 24624.00 912 6,156.00
RING COURSE MIXTURE (313) 009 9905 65.00 643,825.00 9.905 7,924 515,060.00 1,981 128.765.00
NNG WALL SO FT 3,483 30.00 104,490.00 3,483 2,786.4 83,592.00 696.8 20,698.00
TON 15 25.00 375.00 15 12 300.00 3 75.00
:GATE 0014 140 35.00 4,900,00 7D 56 1,950,00 14 490,00 70 56 1,860.00 14 490.00
LL EACH 2,500.00 12.500,00 2,5 2.0 5,000,00 0,5 1,250,00 2.5 2.0 5,000.00 0,5 1250.00
EACH 435.00 2,610,00 4 3.2 1,392.00 0.8 340.00 2 1,6 698.00 04 174.00
EACH 1 475.00 4,75000 7.9 6.32 3,002.00 1,58 750.50 2 1,6 780.00 04 190.00 0.1 47,50
EACH 675.00 4,050.00 4 3.2 2,160.00 0.6 540.00 2 1.6 1,080.00 0.4 270.00
EACH 700,00 700,00 0.6 0.48 336.00 0.12 ` 84.00 0.4 280.00
EACH 87500 4,375.00 3.5 2.8 2,450.00 0.7 812.50 1.5 12 1,050.00 _ 0.3 262.50
EACH 1,10000 2,200.00 1 0.8 880.00 02 220.00 1 _ OA 80000 02 220.00
1ESIGN 3006 CL V LIN FT 1 29.00 522.00 18 144 417,60 3.6 10440
IESIGN 3006 CL 111 UN FT 58 25.00 1,450.00 58 46.4 1,160.00 119 290.00
IESIGN 3007 Cl 111 LIN FT 38 28.50 1,026.00 36 28,8 820.00 72 20520
IESIGN 3006 CL 111 LN FT 17 50,00 0.800.00 176 140.8 7,040.00 352 1,780.00 _
CULVERT EACH 2,500,00 2.500.00 0.5 0,4 1,000.00 01 250,00 0.5 0,4 1,000.00 0.1 250,00
'RC PIPE APRON EACH 175.00 175.00 0.5 0.4 70,00 0,1 1750 03 0,4 70.00 0.1 17,50 ,
'RC PIPE APRON EACH 200.00 600.00 2.5 2.0 400.00 0.5 100.00 0.5 0,4 80.00 0,1 20,00
PIPE APRON EACH 200.00 1.000,00 3.5 23 560.00 0.7 140.00 1.5 12 240.00 0.3 60.00
PIPE APRON EACH 300.00 2,100.00 5.5 4.4 - 1,320.00 1.1 330.00 1.5 12 360,00 03 90.00
PIPE APRON EACH 400.00 2,400.00 4 32 1,280.00 0.8 320.00 2 1.6 640,00 OA 160.00
PPE APRON EACH 450.00 450.00 0.4 0.32 144.00 0.08 36.00 0.6 270.00
PPE APRON EACH 500 _ .00 2,500.00 3.5 2.5 1400.00 0,7 350.00 1.5 12 800.00 0,3_ 150,00
PPE APRON EACH 800.00 1,200.00 1 0,8 480.00 02 120.00 1 03 480.00 0.23 120.00
LIN Ft 24 6.50 1,599.00 246 196.8 1,279,20 492 319,80
(3) LIN FT 84 18.00 1,152.00 64 1,152.00
-
PE DRAW LIN FT 290 6.00 1,740,00 290 132 1.392.130 58 348.00
5 DRAW LIN FT 11,640 5.75 66,930.00 11,640 9.312 53,544.00 2,328 13,386.00 -
0130U7 EACH 9 300.00 2.700,00 9 2,700.00
ANOUT EACH 2 400.00 800,00 2 800.00
SIGN 3006 CL IN FT 60 28.00 1,880.00 60 48 1,344.00 12 336.00
5(09 3008 CL V N FT 5,429 30,00 162,870.00 2,790.5 2,2324 66,972.00 558.1 18,743.00 _ 2,838.5 2,110.8 63,324.00 527.7 15,831.00
SIGN 3006 CL II IN FT 1,990 32.75 _ 65,172.50 995 796 25069.00 199 6,51725 995 796 26,089.00 199 6,517.25
5109 3006 CL V IN FT 152 3425 5206.00 136.7 109.36 3,74558 27.34 938.40 15.3 524.03
SIGN 3006 CL II IN FT 480 36.50 16.790,00 230 184 6,716.00 46 1,679.00 230 184 6,716.00 48 1679.00
SIGN 3006 CL N IN FT _ 371 3825 14,190.75 185.5 1484 5876.30 37.1 1419,06 185.5 148,4 5,876.30 37.1 - 1,419.08
SIGN 3006 CL III IN FT 1,480 36,50 54,020,00 885 532 19,418.00 133 4,854.50 740 592 21,808.00 148 5402.00 75 2,73750
5109 3006 CL N - N FT 730 42.75 31207,50 365 292 12,483.00 73 3120.75 365 292 12,463.00 73 3,120.75
SIGN 3006 CL V N FT 135 53,50 7.222.50 120 96 5,136.00 24 1284.00 15 802.50
5139 3008 CL III N FT 542 48.75 26422,50 271 216.8 10,569.00 54.2 2,642,25 271 2158 10,569,00 54.2 2,64225
SIGN 3008 CL 111 IN FT 459 49,50 22,720,50 242,8 19424 9,614.88 48.56 2,403.72 109.5 87.6 4,33620 21.9 1.084,05 106.7 5281.65
SIGN 3008 CL III IN FT 1,036 72.75 75,369.00 518 4144 30.14780 103,6 7,536,90 518 4144 30,147.60 103.6 7,538.90
SIGN 3006 CL N IN FT 118 114.00 13452.00 59 472 5,380,60 11.8 1.345.20 56 472 5,380,80 11.8 _ 1,34520
SIGN 3006 CL (11 IN FT 591 97.75 57,77025 295.5 236.4 23,108.10 59.1 5777.03 295.5 238A 23,10510 59.1 5,777,03
SIGN 3006 CL (11 IN FT 208 109.50 22,775.00 104 832 9,11040 20,8 2,277.60 104 832 9,110.40 20.6 2277.60
' SEWER SERVICE ACH 5 800.00 4,000.00 1 0.6 640.00 0.2 160.00 4 320090
SANITARY SEWER ACH 2 500.00 1,100.00 2 1,000,00
MANHOLES (SAN) ACH 2 160000 3 000.00 2 3,000.00
STORM SEWER ACM 8 685.00 5,480.00 4 32 2,192.00 0.8 548.00 4 3.2 2,192.00 0,6 548.00
6) EACH 9 200.00 1600.00 9 1,800.00
6) EACH 5 250.00 1250,00 5 1,250.00
6) EACH 1 275.00 275.00 1 27500
30281 LIN FT 190 38.00 7,0110 100 3,800.00 90 1.120.00
18 35) LN FT 1,004 35,00 35,140,00 580 19,800.00 170 5,950.00 274 9.590.00
WER 184 FT 920 2.00 1940.00 660 1,320.00 170 340,00 90 180,00
LN FT 105 130.00 13,650.00 105 13,650.00
ICE PIPE (SDR 26) LN FT 580 32.00 18,560.00 30 24 768,00 6 192.00 _ 550 17600.00
ICE PIPE (SDR 26) LIN FT 350 34.00 11,900.00 70 2.380.00 280 9.52060
LUMP SUM 1 33,000.00 33,000,00 1 33,000.00
=RVICE LUMPSUM 1 4,800.00 4,800.00 1 0.8 3,840,00 0 .2 ' 96000
3UPMENT LUMPSUM 1 1,100.00 1,100.00 097 0,536 589.60 0134 14740 0.33 363.00
W Upa. . 1/2212013
2 a 5 Fr...7avm.
S.P. 70- 617 -22 / S.P. 166- 020 -015 / C.P. 17 -31
S.P. 70- 678 -02 / S.P. 166 - 020 -016 / C.P. 78 -04
CONTRACT SCOTT COUNTY CITY OF SHAKOPEE SCOTT SHAKOPEE PUBLIC ST. FRANCIS
COUNTY UTILITIES REGIONAL MEDICAL
SPEC. ITEM UNIT TOTAL UNIT AMOUNT FEDERAL FEDERAL FEDERAL FEDERAL CENTER
480. ESTD PRICE TOTAL PARTICIPATING NON - PARTICIPATING TOTAL PARTICIPATING NON-PARTICPATNG NONPARTICIPATING NON - PARTICIPATING NW.PARTICPATNG NON- PARTICPATING
WANT. WANT. 80% 20% DUAN7. 80% 20%
EST OUART. EST. AMOUNT EST (WANT. EST. AMOUNT EST WANT. EST. AMOUNT EST05ANT. ST. AMOUR" EST WANT, EST. AMOUNT ESTOUART. EST. AMOUNT EST WANT. EST. AMOUNT ESTOUANT. EST. AMOUNT
2504. 801 TEST EXISTING WATER MAIN (IRRIGATION) LUMP SUM 1,500.00 1,500.00 067 0.536 804.00 0.134 201.00 0.33 495.00
2504.802 WATER SERVICE SYSTEM EACH 180000 1,800.00 1 1000.00
2504.802 RECONNECT WATER SERVICE EACH 600,00 800.00 1 0.5 840.00 0.20 180.00
2504.002 CONNECT TO EXISTING WATER MAN EACH 1,000.00 4,000.00 3.00 3,000.00 1 1,000.00
2504.802 CONNECT TO EXISTING WATER MAN (IRRIGATION) EACH 800.00 2,400.00 3 2.4 1020.00 0.6 480.00
2504.502 HYDRANT - SPECIAL IRRIGATION EACH 2,500.00 7,500.00 3 2.4 5,000.00 0.6 1,500.00
2504.802 HYDRANT EACH 3,800.00 28,600.00 5 19000.00 1 3800.00 1 3.800,00
ADJUST HYDRANT EACH 200.00 1,200.00 6 1,200.
2504.802 ADJUST GATE VALVE AND BOX EACH 500.00 2,500.00 4 2600.00 1 50060
2504,602 ADJUST WATER MANHOLES EAcH 1,00600 2,000.00 2 2,00060
2504,602 1' CORPORATION STOP EACH 250.00 500.00 1 0.8 200.00 02 50.00 1 250.09
2504.602 1.5 CORPORATION STOP EACH 350.00 350.00 1 350.00
2504,802 S GATE VALVE AND BOX EACH 1,800.00 12,800.00 4 7200.00 2 3.60600 1 1,800.00
2504. 802 S GATE VALVE AND BOX (IRRIGATION) EACH 1,800.00 1,800.00 1 0.8 1,440.00 01 360.00
2504,802 r GATE VALVE AND BOX- SPECIAL IRRIGATION EACH 1,500.00 9,000.00 3 2.4 4,320.00 0.6 1,080.00 2 3,800.00
2504.502 P GATE VALVE AND BOX EACH 1,600.00 1,600.00 1 1.800,00
2504.502 12 GATE VALVE AND BOX EACH 3,200.00 16,000.00 1 3.200.00 4 12,800.00
2504.802 1r4S WET TAP EACH 3,500.00 3,500.00 1 3.500.00
2504.802 1' CURB STOP 8 BOX EACH 500.00 1,000.00 1 0.8 _ 400.00 0.2 100.00 1 500.00
2504.802 1.5 CURS STOP & BOX EACH 500.00 500.00 1 500.00
2544.603 WAI0RM4M INSULATION LIN FT 1 35.00 630.00 85 61 224.00 1.6 56.00 10 350.00
2504.603 1' TYPE K COPPER PPE UN FT 12 28.00 3,360.00 45 36 1,008.00 9 252.00 75 2.100.00
1504,603 1.5 TYPE K COPPER PIPE LIN FT 4 35.00 1,575.00 45 1,575.00
2504.603 S WATERMAIN DUCTILE IRON CL 52 LIN FT 11 34.00 3,910.00 85 2.890.00 _ 20 680.00 10 340.00
2504.803 rWATERMAIN DUCTILE IRON CL 52 LIN FT 508 40,00 20,240.00 170 6,80010 15 600.00 321 12,840.00
2504.803 12 WATERMAIN DUCTILE NON CL 52 LIN FT 2,160 40.00 88,400.00 884 35,360,00 1,276 51,040.00
2504,603 e' PVC WATERMAIN (10540A0064) (4) LIN FT 2,135 33.00 70,455.00 1,399 1,1191 36,933.80 2796 9,233.40 661 21,513,00 75 2,475.00
2504.503 103 STEEL CASING PIPE LIN FT 130 130.00 16,900.00 130 104 13,520.00 26 3,380.00
2504.603 30' STEEL CASING PIPE LIN FT 130 145.00 18,850.00 88 12,780.00 42 8,090.00
2504.606 DUCTILE NON FITTINGS POUND 8,980 4.00 27,920.00 3444 13776.00 2,721 10,884.00 815 3.250.00
2506502 CONSTRUCT DRAINAGE STRUCTURE DESIGN F EACH 3 1,500.00 4,500.00 1.5 13 1,800.00 0.3 450.00 15 1.2 1,800.00 0.3 450.00
2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN O EACH 47 1,400,00 65600.00 235 18.8 28,320,00 4.7 6.580.00 23.5 18.8 28,320.00 4.7 6.58000
2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL I EACH 14 1,500.00 21,000.00 7 5.6 6,400.00 1.4 2,10010 7 5.6 8,400.00 1.4 2.10000
2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 2 EACH 5 3,000.00 15,000.00 3 2,4 7.200.00 0.6 1,600.00 2 1.6 4,800.00 0.4 1100.00
2505.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 3 EACH 2 1,250.00 2.500.00 2 1,8 2,000.00 0.4 500.00 -- 2505.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020 EACH 120 1,700.00 204,000.00 615 492 83,640.00 12.3 20,910.00 58.5 46.8 79,560.00 11,7 1909060
2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60.4020 EACH 11 2,500.00 27,500.00 6 4.5 12,000.00 12 3,000.00 5 4 10,000.00 1 2,500.00
2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN 72-4021 EACH 13 3,500.00 45500.00 7 5.6 19,600.00 1.4 4,900.00 6 4.8 16,800.00 12 4,200.00
2506502 CONSTRUCT DRAINAGE STRUCTURE DESIGN 844020 EACH 4 4.500.00 18,000.00 2 1.8 7,200.00 0.4 1,800.00 2 1.8 7,200.00 0.4 1,808.00
2508502 CONSTRUCT DRAINAGE STRUCTURE DESIGN 984020 EACH 1 8,000.00 6,000.00 0.5 0.4 2,400.00 0.1 800.00 0.5 0.4 2,400.00 0.1 800.00
25086 AN
16 CASTING ASSEMBLY EACH 5 850.00 3250.00 4 2.80000 1 650.00
2508.516 CASTING ASSEMBLY (STORM) EACH 1 750,00 750.00 0.5 0.4 300.00 0.1 75.00 0.5 0.4 300.00 0.1 75.00
2506.522 ADJUST FRAME 6, CASTING (STORM) EACH • 2]5.00 1.100.00 2 1.6 440.00 0.4 110.00 2 1.6 440.00 0.1 110.00
2505.522 ADJUST FRAME 6 RING CASTING (SANITARY) EACH 8 350.00 2600.00 3 2.4 840.00 0.6 210.00 4 1,400.00 1 350.00
I f■ 2,000 10,WO.00 4 5,909.00 1 2,000.00 _------ - --- MUM
2506.502 CONSTRUCT MANHOLE ( EACH 1 1,700.00 1,700.0 1 1,700.00
2505.503 CONSTRUCT 48 DIAMETER SANITARY SEWER MANHOLE UN FT 93 300.00 27,900.00 75 12,500.00 18 5,400.00
2506.603 SANITARY SEWER MANHOLE- EXTRA DEPTH UN FT 18.9 110.00 1,85910 16.9 1.859.00
2511.501 RANDOM RIPRAP CLASS 9I CU YD 34 85.00 2,890.00 34 27,2 2,312.00 6.8 578.00
2511,804 FILTER FABRIC TYPE I 50 VD 340 3,00 1,020.00 170 138 408.00 34 102.00 170 136 •00.00 34 102.00
2511.807 RPRAP SPECIAL TYPE I CU TO 227 95.00 21,565.00 130.5 104.4 9,918.00 26,1 2,479.50 965 772 7.33160 10.3 1,833.50
2515.604 ARTICULATED BLOC(( MAT CLOSED CELL TYPE 2 SO TO 505 75.00 37,875.00 252,5 202.0 15,150.00 50.5 3787.50 252,5 202.0 15,150.00 50.5 3.767.50
2521.501 4 CONCRETE WA/It SOFT 30,093 3.50 105,325.50 27,783 22,226.4 77,792.40 5,556.6 19.448.10 2,310 1,848 6468.00 462 1517.00
2521.501 4' CONCRETE WALK SPECIM 50 FT 320 20.00 8400 .00 320 8400.00
2521.501 8 CONCRETE WAN( SO FT 3,150 4.50 14220.04 2,885 2,308 10,386.00 577 2,596.50 _ 275 220 990.00 55 247.50
2521.511 SBINMINWS WALK SOFT 121,531 2.00 243,002,00 58,840.5 47,0721 94,144.80 11188.1 23,53820 62,500.5 50,152.4 100,304.80 12,538.1 25,07810
2531.501 CONCRETE CURB 8 GUTTER DESIGN 0424 1.84 FT 25,341 10.50 266,080.50 18,503 145881 150,097.20 3.716.5 39,024,30 6,758 5,406,4 56,76720 1,351.6 14,191.80
2531,501 CONCRETE CURB 8 GUTTER DESIGN 8612 W FT 2,300 12.00 27,600.00 2,300 1,840 22 460 5,520.00
2531.501 CONCRETE CURB 8 GUTTER DESIGN 8618 W FT 4,505 12.50 56,312.50 2,580 2,054 25,800.00 516 6.450.00 1,925 1.540 19250.95 385 4,812.50
2531.501 CONCRETE CURB 6 GUTTER DESIGN 0424 W FT 150 15.00 2,250.00 150 120 1,800.00' 30 450.00 .
2531.507 S CONCRETE DRIVEWAY PAVEMENT SO YD 654 40.00 28.180.00 635 508 20,320.00 127 5,080.00 19 152 508.95 3.8 152.00
2531.507 Y CONCRETE DRIVEWAY PAVEMENT SO YD 67 45.00 30,555.00 191.5 153.2 6,89410 36.3 1,723.50 488 390 17,550.00 98 4387.50
2531.602 CONCRETE MEDIAN NOSE EACH 300.00 800.00 2 1.6 480.00 0.1 120.00
2531.802 CONCRETE ENTRANCE NOSE DESIGN 7113 EACH 750.00 2,250.00 2 1.6 1,200.00 01 300.0 1 0.8 600.00 020 150.00
2531.002 CONCRETE BASE SPECIAL (STATUE) EACH 1,100.00 1.100.00 1 1.100.00
2531.618 TRUNCATED DOMES SO FT 51 35.00 18,060.00 472 377.6 13,216.00 94.4 3,304.00 M 352 1,232.00 8.8 308.00
2533507 PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 UN FT 5,36 14.00 117,040.00 8,360 6,688 93,632.00 1,672 23,408.00
2533.508 RELOCATE PORTABLE PRECAST CONCRETE BARRIER DESIGN 837 UN FT 9,293 460 37,172.00 9,293 74344 29,737.60 1,858.6 7,43410
FED MIT 1nt MOM. F.,. 3W5 � V FM N Trz126t3
S.P. 70- 617 -22 / S.P. 166- 020 -015 / C.P. 17 -31
S.P. 70- 678 -02 / S.P. 166 - 020 -016 / C.P. 78 -04
CONTRACT SCOTT COUNTY CITY OF SHAKOPEE SCOTT SHAKOPEE PUBLIC ST. FRANCIS
COUNTY UTILITIES REGIONAL MEDICAL
SPEC. ITEM UNIT TOTAL UNIT AMOUNT FEDERAL FEDERAL FEDERAL FEDERAL CENTER
NO. ESTD PRICE TOTAL PARTICIPATING NONAARTICPATING TOTAL PARTICIPATING NON- PARTICPATING NON-PARTICIPATING NON - PARTICIPATING NON -PARI1OPATNG NON- PARTICPATNG
01.6•7. WANT. 80% 20% OUANT. 0% 20%
EST OUANT. EST. AMOUNT , EST OUANT. EST. AMOUNT EST OUANT. EST. AMOUNT EST OUANT. EST. AMOUN1 EST OUANT, EST. AMOUNT EST OUANT. EST. AMOUNT EST OUANT. EST. AMOUNT EST OUANT. EST. AMOUNT
2540.6002 MAIL BOX EACH 2 50.00 100.00 2 1.6 80.00 0.4 20.00
2540.602 MAIL BOX SUPPORT EACH 17 170.00 2,890.00 17 13.6 2,312.00 3.40 578.00
2545.511 LIGHTING UNIT TYPE SPECIAL EACH 5 5,000.00 25.000.00 5 25.00500
2545.511 LIGHTING UNIT TYPE SPECIAL 2 EACH 8 2.200.00 17,800.00 3 17.800.00
2545.515 LIGHT BASE DESIGN E 8400 EACH 5 650.00 3,250,00 5 3250.00
2545.523 3/4' NON - METALLIC CONDUIT 1N FT 560 5.00 2.800,00 560 2,800.00
2545.523 1 -147 NON- METALLIC CONDUIT _ LN FT 550 5.50 3,025.00 550 3,025.00
2545.523 2' NON - METALLIC CONDUIT UN FT 41 6.00 2,490.00 415 2,490.00
2545.531 UNDERGROUND WIRE 1005406103,5 LN FT 330 3.40 1.122.00 330 1,12200
2545.531 UNDERGROUND WIRE 1 CONO NO LP FT 2.04 1.40 2,858.00 2.040 2,856.00
2545.531 UNDERGROUND WIRE CON °NO5 UN FT 1.380 120 1.632.00 1.360 1,832.00
2545.531 UNDERGROUND WIRE 1 CON° NO 10 UN FT 2.19 1.10 2,414.50 2,195 2,414.50
2545.531 UNDERGROUND WIRE 1 CONO N012 114 FT 74 0.95 703.00 740 703,00
2545541 SERVICE CABINET TYPE SPECIAL EACH 5,00000 5,000.00 1 5,000,00
2545.545 EQUIPMENT PAD TYPE SPECIAL EACH 1.100.00 1.100.00 1 1,100.00
2545.553 HANDHOLE EACH 50000 500.00 1 500.00
2545603 INSTALL UTILITY CONDUIT LN FT 2,87 600 17220.00 2,870 17220.00
2550.512 HANOHOLE EACH _ 900.00 3,800.00 4 3 2,880.00 1 220,00
2550.523 T NON - METALLIC CONDUIT LIN FT 3,88 300 11,867.00 3,889 3,1112 9,33300 777.8 2,333,40
2554.815 INSTALL IMPACT ATTENUATOR AMP/ 4.000.00 16,000.00 • 3.2 12,800.00 0.8 3200.00
2554.615 RELOCATE IMPACT ATTENUATOR AMY 750.00 3,750.00 5 4 3,000.00 1 750.00
2557.501 WIRE FENCE DESIGN 600 -9322 LIN FT 420 25.00 10,600.00 420 336 8,400.00 84 2,100.00
2563.801 TRAFFIC CONTROL LUMP SUM 1.00 50,000.00 50,000.00 0.88 0.688 34,400.00 0.172 8,600.00 0.07 0.056 2,800.00 0.014 700.00 0.01 500.00 0.01 500.00 0.03 1,500.00 0.02 1,000.00
2564531 S93N PANELS TYPE SPECIAL _ SOFT 1 150.00 150.00
1
0.8 120.00 02 30.00
2564.531 SIGN PANELS TYPE 0 30 FT 621.05 33.00 20,494.65 567.55 454.04 14,983.32 113.51 3,745,83 536 42.5 1.412.40 10.7 353.10
2564.531 SIGN PANELS TYPE D SO FT 7.5 40.00 300.60 7.5 6.0 240.00 1.5 60.00 ,
2564.552 HAZARD MARKER 042 EACH 15 75.00 1.125.00 15 12 900.00 3 225.00
2564.553 CLEARANCE MARKER X4-4 EACH 1 100.00 100.00 1 0.8 80.00 02 20.00
2564.554 SNOW PLOW MARKER 7A-5 EACH 15 50.00 750.00 15 12 600.00 3.0 150.00
2584.802 SIGN COLLAR EACH 30 15000 4,500.00 30 24 3,600.00 6 900.00
2564.802 INSTALL SIGN EACH 150.0 150.00 5 0.8 120.0 02 30.0
2565.511 TRAFFIC CONTROL SIGNAL SYSTEM A SIG SYS 222,3000 222,300.00 0.75 0.60 133,360.0 0.15 33,345.00 0.25 020 44,460.00 0.05 11,115.0
2585.511 TRAFFIC CONTROL SIGNAL SYSTEM B SIG SYS 213,60,0 213,600.0 0.5 0.4 85,440.0 0.1 21.380.0 0.5 0.4 65,440,0 0.1 21,38000
2585.01 EMERGENCY VEHICLEPREEMPTK )N SYSTEM LUMP SUM 3,10,0 3.10.0 0.5 0.4 1,240.0 0.1 310.0 0.5 0.4 1240.0 0.1 310.0
2565.601 EMERGENCY VEHICLE PREEMPTION SYSTEM B LUMP SUM 920.0 9,20.0 0.5 0.4 3,680.0 0.1 920.0 0.5 0.4 3.680.0 0.1 920.0
2565.616 REVISE SIGNAL SYSTEMC SYSTEM 91,000.0 91.00.0 1 0.8 72,80.0 0.2 18,200.00 I
2571.502 DECIDUOUS TREE. 2.0' CAL 846 TREE 260.0 1,040.00 4 1,010.00
2571.502 DECIDUOUS TREE. 2.5' CAL 888 TREE 20 340.00 6,800.00 20 6,8000
2571.505 DECIDUOUS SHRUB, NO. 5 CONT. SHRUB 16 000 80.0 16 8000
2571.07 PERENNIAL, NO. I CONT. PLANT 127 15.00 1,05.0 127 1005,0
2572.01 TEMPORARY FENCE UN FT 300 2.00 600.00 300 240 480.0 60 120.00
2573.02 SLT FENCE TYPE HEAVY DUTY UN FT 1.670 1.70 2839.0 1,670 1338.0 2,27120 334 07.80
2573.02 SILT FENCE, TYPE PREASSEMBLE° UN FT 1,930 300 5.790.0 7,930 1.544 4,632.00 386 1,158.0
2573.502 SILT FENCE TYPE MACHINE SLICED LP FT 58.118 125 22,647.50 16,841 13,472.6 16641,00 3,3682 421025 1277 1,021.6 1 255.4 31925
2573.513 TEMPORARY DITCH CHECK TYPE 7 CU YD 3 85.10 255.00 3 204,00 0.6 51.0
2573.530 STORM DRAIN INLET PROTECTION EACH ' 202 175.0 23,230.00 194 155.2 17,848,00 38.80 4.462.0 8 6.4 736.0 1.6 184.0
2573.540 FILTER LOG TYPE STRAW 6106011 LIN FT 1,904 325 6,188,00 1,904 1,523 4,950.40 381 1237.60 ,
2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 18 1,00.00 18,000.00 17 13.6 13 3.4 3,4000 1 0.8 800.00 02 200.00
2573,602 CULVERT PROTECTION EACH 15 160.00 2,400.00 10 11 7,792.00 3 440.0 1 09 128.00 0.2 32.00
2575501 I G (P) ACRE 28.1 155.00 4355,50 28.1 2248 3,48410 5,62 871.10
2575,502 SEED Mx IURE 250 POUND 1,414 2.00 2,828.00 1,385 1,108,0 2,216.0 277,0 554.00 29 23 46.40 6 11.60
2575.502 SEED MIXTURE 260 POUND 330 225 742.0 330 264 594.00 66 148.0
2575.502 SEED MIXTURE 310 POUND 116 4.50 522.00 116 92.8 417.80 232 104.40
2575.502 SEED MIXTURE 326 POUND 41 5.00 205.00 41 32.6 164.00 32 41.0
2575.502 SEED MIXTURE 30 POUND 228 4.75 1,03.0 228 182.4 88610 45.6 218.0
2575.05 SODDING TYPE LAWN SO YD 30,773 205 81,54845 30,268 243128 84,16392 8.0532 1604098 507 406 1,074.84 101 268.71
2575.505 SODDING TYPE MINERAL SO YD 2.680 5.00 13 400.00 2,680 2.144 10,720.0 536 2,680.0
2575.511 MULCH MATER03L TYPE 1 TON 153 115.0 1.759.50 15.3 1224 1,407.60 3,06 351,0
2575.511 MULCH MATERIAL TYPE 3 ]014 9.7 175.0 1,697.50 9.7 7.78 1 058.0 1.94 339.50
2575619 DISK ANCHORING (P) ACRE 82 115.0 943.00 82 8.56 754 A0 1.64 168.80
2575.523 EROSION CONTROL BLANKETS CATEGORY 1 5O YD 32,511 1.00 32,511.00 32611 26,038 2608.0 6,5022 6,50220
2575.523 EROSION CONTROL BLANKETS CATEGORY SO YD 6,587 2.00 13,134.00 8,567 5253.6 10,0720 16731 2,626.80
ROM., nil 69148805 Fw4.40 4 W5 LAM up.. a 0/0
S.P. 70- 617 -22 / S.P. 166-020-015 / C.P. 17 -31
S.P. 70- 678 -02 / S.P. 166 - 020 -016 / C.P. 78 -04
CONTRACT SCOTT COUNTY CITY OF SHAKOPEE SCOTT SHAKOPEE PUBLIC ST. FRANCIS
COUNTY UTILITIES REGIONAL MEDICAL
SPEC. ITEM UNIT TOTAL UNIT AMOUNT FEDERAL FEDERAL FEDERAL FEDERAL CENTER
NO. ESTD PRICE TOTAL PARTICIPATING NON - PARTICIPATING TOTAL PARTICIPATING NON- PARTICIPATING NON - PARTICIPATING NON -PARTICIPATING NONPARTICIPATING NON-PARTICIPATING
WANT. OUANT. 80% 20% OUANT. 8030 20%
EST OUANT. EST. AMOUNT EST OUANT. EST. AMOUNT EST WANT. EST. AMOUNT EST OUANT. EST.AMOUN EST OUANT. EST. AMOUNT EST OUANT. EST. AMOUNT EST OUANT. EST. AMOUNT EST OIIANT. EST. AMOUNT
2575.523 EROSION CONTROL 8L4NI(ETS CATEGORY3 9010 82,000 1.15 91.346.00 80,021 64,011 73,619.32 16,004 18,40413 2,019 1,8152 1.857.48 4018 464.37
2575.532 FERTILIZER TYPE 3 POUND 8,398 0.45 3,779.10 8,252 8,801.8 2,970.72 1,650.4 742.88 148 117 52.58 29 13.14
2575.532 FERTILIZER TYPE 4 POUND 492 0.90 442.80 492 393.51 35424 98.4 88.58
2575571 RAPID S008L74110N METHOD 3 MGAL 0419 300.00 125.70 0.009 0.3272 98.16 00818 24.54 0.010 0.009 2.40 0.002 0.80
2575.603 TEMPORARY ROCK DIKE MIN FT 3 100.00 300.00 3 2.4 240.00 0.8 80.00
2575.607 MULCH MATERIAL rem ECIAL CU YO 8 35.00 280.00 8
PE 280.00
2582.501 PAVEMENT MESSAGE (LEFT ARROW) EPDXY EACH 23 130.00 2,990.00 23 18.4 2.392.00 4.6 598.00
2582.501 PAVEMENT MESSAGE (RIGHT ARROW) EPDXY EACH 22 130.00 2,860.00 22 17.8 2,286.00 4.4 572.00
82,501 PAVEMENT ME55AGE(LEFT -THRU ARROW) EPDXY EACH 150.00 300.00 1.8 240.00 0.4 80.00
2582.502 4 SOLID LINE WHILE PLANT LIN FT 1,371 0.15 205.65 1,371 1,090.8 164.52 2742 01.13
2582.502 4' SOLID LINE YELLOW PLANT UN FT 2215 0.15 33225 2,215 1,772 265.00 443 6825
2582.502 4' DOUBLE SOLID LINE YELLOW PAINT UN FT 17.006 530 5,101.80 17,008 13,605 4,081.44 3,401 1,020.36
2582.502 4' 50170 LINE WHITE EPDXY LIN FT 25292 025 6,323.00 25,292 20 5,05820 5,0581 1.264.60
2582.502 8' SOLID LINE WHITE EPDXY UN FT 739 0.40 295.80 739 591.2 236.48 1479 59.12
2582.502 4' BROKEN LINE WHITE EPDXY UN FT 1.922 025 480.501 1,922 1,537.6 384.40 384.4 96.101
2502.502 8' DOTTED LINE WHRE EPDXY UN FT 162 0.50 81.00 182 129.6 64.80 322 1620
2582.502 4' SOLID LINE YELLOW EPDXY LIN FT 11,842 0.25 2.980.50 11,842 9,474 2,36820 2.308 592.10 1
2582.502 24' SOLID LINE YELLOW EPDXY LIN FT 882 3.50 3,017.00 862 690 2 ,413.60 172 80320
2582.502 4' DOUBLE SOLID LINE YELLOW EPDXY LIN FT 4,437 0.45 1,990.85 4,437 3,550 1,597.32 887 399.33
2582.503 CROSSWALK MARKING - POLY PREFORM SOFT 2,178 14.00 30492.00 2,178 1,742 24,393.80 436 6,09820
2582.503 CROSSWALK MARKING -EPDXY SOFT 180 5.00 900.00 180 144 720.00 36 180.00
SUBTOTALS 19,593.338.15 18,194,523.78 11.548,630.95 9982201.68 824555017 1201782.00 683,14.00 9114,084.00 1223,425.08
PEEL/APIARY ENGINEERING 00%) 1 110910090
CONSTRUCTION ENGINEERING (8%) 178,578.15 619,44.04 616.142.56 19,125.12 817.87401
ADMINISTRATION (3 30) 825,44.05 67,366.51 16,053.46 93,421.92
TOTALS 10,194,523.78 $1,48,830.95 81,090244.09 6272,41.02 6333.078.02 983,180.00 1128.611.4 1241289.08
TOTAL FEDERAL ELIGIBLE $6,194,523.78 + 5982,201.88 = $7,176,725.66
SHAKOPEE FEDERAL NON- PARTICIPATING 8245,550.47
SHAKOPEE NON- PARTICIPATING 8201,782.00
PRELIMINARY ENGINEERING - 50% BITUMINOUS TRAIL, OUTSIDE CO ITEMS, 50% STORM SEWER SYSTEM 8 CITY PORTION OF SIGNAL SYSTEMS - $109,100.00
CONSTRUCTION ENGINEERING (PARTICIPATING & NON- $114,362.75
ADMINISTRATION ENGINEERING (PARTICIPATING & NON- 842,886.03
CONSTRUCTION ENGINEERING - CREDIT FOR EAST LEG OF VALLEY 84, 456.00
ADMINISTRATION ENGINEERING - CREDIT FOR EAST LEG OF VALLEY VIEW $1,671.00
CITY OF SHAKOPEE COST SUBTOTAL $707,554.
ESTIMATED FEDERAL ELIGIBLE = 67,099,200 - STIP AUTHOIZED FEDERAL FUNDING = 86,805,216
CITY FEDERAL PARTICIPATING COSTS EXCEEDING STIP AUTHORIZED FEDERAL FUNDS $50,844.56 = 982,201.88 - (982,201.88 * (6,805,216.00 / 7,176,725.66))
CITY OF SHAKOPEE GRAND TOTAL - $758,398.81
ITEM NOTES:
(1) SALVAGE SEPTIC TANK TO OWNER PER RIGHT -OF -WAY AGREEMENT
(2) LIMESTONE 1005 CRUSHED
(3) SCHEDULE 80
(4) 8' PVC WATERTIGHT OASKETED PIPE, ELBOWS, TEES, RISERS AND ALL FITTINGS SHALL BE INCIDENTAL
(5) SANITARY MANHOLE - STANDARD 8' DEPTH
PRELIMINARY ENGINEERING COSTS FOR THE CITY OF SHAKOPEE
ITEM (STD ESTD
WANT AMOUNT
50% OF BITUMINOUS TRAIL ALONG C5AH 17 & CSAH 78 57,520.5 115,041.00
OUTSIDE CURB 8 GUTTER - CONCRETE CSG DESIGN 6424 13,518 141,918.00
OUTSIDE CURB 8 GUTTER ITEM - 6' CONCRETE DRIVEWAY PAVEMENT 38 1,520.00
OUTSIDE CURB 8 GUTTER ITEM- 8' CONCRETE DRIVEWAY PAVEMENT 95 4,275.00
50% OF STORM SEWER SYSTEM 680,498.00
SHAKOPEE LEGS OF SIGNAL (25% FOR HILLSIDE AND 50% FOR VALLEY VIEW) 187,750.00
TOTAL SHAKOPEE COST FOR PRELIMINARY ENGINEERING 01.091,000.00
10% PRELIMINARY ENGNEERNG _ 8109,100.00
FED
,1731, 17 N
>I ESTIMATE FU.a. sas 1 r ,
LEGEND - S P 1 _ ■ �R �
PAMEO ROADWAY - BITUMINOUS > a. '� 3A.0 .° �► 1
C:::0117,6:173 -1 ; _ ► 1 J fl
gm PAKD ROADWAY - CCMCRETE • `
Y, -
_+ j
AGGREGATE SURFACE CURBS }
11.1 FK 1' •-� �.._. r I'
/ sr 1
RAISED MEDIANS d CURBS � '•
h.. -. '� f
- PAVED SNOUEDERS 4i - •
MN BITUMINOUS TRAILS d BIKEWAYS I t T J, . r ', f _ ' •.
_ GRASS MEDIAN . 1
OBLITERATE ACCE 1 ' y - � ,
MEM wEn ANDS SS
• t 1 1. t y1 '71 ° I I
TRAFFIC SIGNAL h
ACCESS CLOSURE wu •'k - h
POIENTAI ACCESS CLOSURE j,I,y J {
• 41111110
w Y
r ,
•
5 p ) , 4 �z..r
/
)ik
•
w
d �..
•
•
r
44‘ 441 14101 • 4
1
_ .. , ,v. ►.R it ` {:;t __ __._
. c
-x .. s ,... 1, xt
s• --
1 • ' . r
3
F: \P \1731 \dwg \Exhibits \1731 Ex01.dwg, 11 x 17 4/4/2013 2:21:35 P14