Loading...
HomeMy WebLinkAbout5.H. CSAH 16 Area Transportation Review Proposal CITY OF SHAKOPEE s: H. Memorandum CASE LOG NO.: NA CONSENT TO: Honorable Mayor and City Council Mark McNeill, City Administrator FROM: R. Michael Leek, Community Development Director SUBJECT: CSAR 16 Area Transportation Review Prbposal MEETING DATE: February 21,2006 INTRODUCTION: As the City is beginning to get and review developI]1ent proposals for lands in the eastern part of the City and south ofCSAR 16, as well.as in neighboring Prior Lake, it has become apparent that there is a need to plan for abetter local network of roadways and roadway connections in the area (e.g. the possible extension ofVa11ey View Road, realignment of accesses to CSAH 16). For that reason, staff solicited.a proposal from WSB for a special study. Some initial conversations with Prior Lake and Scott County indicate that they are interested in a more cooperative effort to develop the roadway systems in this area. Staff would expect to sit down with Prior Lake and County staff to discuss the alternatives that are developed as a part of this study. Funds for the study would come from the Community Development-Planning budget. ALTERNATIVES: L Offer and pass a motion authorizing the appropriate City officials to enter into an agreement withWSB fora CSAH 16 Transportation Review at a cost not to exceed $11,900. 2. Do not approve a CSAH 16 Transportation Review. 3. Table the matter for additional information. ACTION REQUESTED: Offer and pass a motion authorizing the appropriate City officials to enter into an agreement with WSB for a CSAH 16 Transportation Review at a cost not to exceed $11,900. ~~~~ R. Michael Leek Community Development Director H:\CC\2006\02-21\WSB CSAH 16 STUDY.doc Infrastructure _ Engineering_ Planning _ Construction 701 Xenia Avenue South Suite #300 Minneapolis, MN 55416 Tel: 763541-4800 Fax: 763541-1700 February 16, 2006 Mr. Michael Leek Community Development Director City of Shakopee 129 Holmes Street South Shakopee, MN 55379-1376 Re: CSAH 16 Area Transportation Review Proposal City of Shakopee Dear Mr. Leek: As we discussed in our meeting on Tuesday, February 14, 2006, you have requested WSB & Associates, Inc. (WSB)to prepare a proposal including a scope of work and estimated cost for the transportation review of CSAH 16 area. This will include a transportation analysis of the area bounded by future CSAH 21 on the north, CSAH 42 on the south, CSAH 18 on the east, and CSAH 83 Oh the west. This area continues to grow and is currently having significant development pressure. With this growth, the appropriate transportation system needs to be determined. It is our understanding that the goal ofthis study will be to address the following primary issues: 1. Access to CSAH 16, including the appropriate intersection spacing. 2. The extension of Valley View Road 3. Development of a collector roadway system, both north/south and east/west tb accommodate the existing and future growth in the area. 4. The coordination of transportation system with the City of Prior Lake. 5. Development oftraffic projections for the area on the proposed collector-road system. Based on these issues, the following scope of services has been developed for your consideration. Task1: Data Collection WSB will collect available data from the City of Shakopee, Scott County, and the City of Prior Lake as necessary for completion of the study. It is assumed that the CityofShakopee will provide the aerial base mapping including electronic versions of proposed development plats and/or concepts in this area. WSB will use this base mapping for development of alternatives and traffic forecast. H:\Ce\2006\02-21\WSB Study East Shakopee 021606.doc Mr. Michael Leek Community Development Director February 16,2006 Page 2 of3 Task 2: CSAH 16 Access Alternatives/Analysis A CSAH 16 corridor study was completed in April 2002 that identified future access locations along CSAH 16 between CSAH 83 and CSAH 18. With the additional developmentthat has occurred in this area, review of the access locations and analysis ofthe potential locations will be completed. It is assumed that up to three (3) alternative access concepts will be analyzed as part ofthis task. In addition, this task will be completed in conjunction with Task 3 to ensure that the overall transportation system in this area functions properly. Task 3: Collector Road Alternative/Analysis Aseries of north/south and east/west collector streets will be reviewed and analyzed to provide for the most efficient and logical transportation network for this area. It is assumed that up to three (3) alternative concepts will be reviewed and analyzed. This task will be coordinated closely with Task 2 to ensure that the overall transportation system would function most efficiently. IUs anticipated thatthese alternatives will be discussed with the City of Shakopee staff and following concurrence on the alternatives presented to Scott County and the City of Prior Lake for their input and comment. Task 4: Traffic Forecasts Once the three (3) primary alternatives have been developed, traffic forecasts will be prepared for each ofthe alternatives. These forecasts will be based on projected land use in this area, and inputs from the City's transportation planning model. Task 5: Agency Coordination It is assumed that two (2) meetings will be held with City staff to review the proposed alternatives and general coordination of the proposed study. In addition, it is assumed that two (2) meetings will also be held with the City of Prior Lake and/or Scott County to review the proposed alternatives and to come to concurrence on a recommended alternative. Task 6: Report Preparation A draft and final report will be prepared and presented to the Planning Commission and City Council for their review and appraisal on the transportation system. The draft report will be completed and submitted to City staff for review. Following receipt of comments from City staff, the report will be submitted Scott County and Prior Lake for their review and comment. A final repbrt will be prepared for presentation to the City of Shakopee Planning Commission and City Council for approval. Schedule Assuming City Council approval and Notice to Proceed on this project at the February 21,2006, City Council Meeting, the alternative analysis and draft report would be completed by the end of March 2006. It is anticipated that a final report could be presented to the Planning Commission and City Council at their second meetings in April. H:\CC\2006\02-2I\WSB Study East Shakopee 021606.doc Mr. Michael Leek Community Development Director February 16,2006 Page 3 of3 Estimated Cost Based on the above scope of services and discussions with City staff, the following cost per task is anticipated. 1. Data Collection $500 2. CSAH 16 Access Alternative $2,500 3. Collector Road Alternatives $3,400 4. Task for Traffic Forecast $1,300 5. Agency Coordination $1,700 6. Report Preparation $2,500 Total Cost $11,900 If you have any questions or would require additional information, on this proposal, please contact me at 763-287-7183. Sincerely, WSB & Associates, Inc. Charles Rickart, P.E., PTOE PrincipallProj ect Manager sm H: \CC\2006\02- 21 \ WSB Study East Shakopee 021606.doc I