CITY OF SHAKOPEE
MEMORANDUM
TO: Mayor & City Council
Mark McNeill, City Administrator
Bruce Loney, Public Works Director
FROM: Bruce Loney, Public Works Director
DATE: October 18, 2005
SUBJECT: Storm Water Pipe Replacement
INTRODUCTION:
Public Works is requesting to replace to storm water pipe on Norton Drive.
BACKGROUND:
The heavy rains that occurred in September and October have damaged the storm water
pipe on Norton Drive. The damage to the pipe is causing the road to deteriorate quickly.
Staff has put out a request for quotes for this project. They will be available to you at the
meeting Tuesday night. The cost is expected to be over $10,000 and therefore requires
council approval.
ALTERNATIVES:
1. Authorize staff to utilize the 10west quote for replacement of the storm water pipe
on Norton Drive with the costs to be paid out of storm drainage fund.
2. Deny the request.
3. Table for more information.
RECOMMENDATION:
Staff recommends alternative No.1.
ACTION REQUESTED:
Move to approve the 10w quote for the replacement of the storm water pipe of Norton
Drive with the costs to be paid out ofthe storm drainage funds.
~c&
Public Works Director
BL/jla
15 A, I
CITY OF SHAKOPEE
Memorandum
TO: Mayor & City Council
Mark McNeill, City Administrator
FROM: Bruce Loney, Public Works Director
SUBJECT: Storm Water Replacement Pipe
DATE: October 18, 2005
BACKGROUND:
Attached are two quotes to replace the stormwater culvert on Norton Drive.
The low quote received is from Parrott Contracting, Inc. and work could start on
Wednesday, October 19,2005.
ACTION REQUESTED:
Move to approve the quote from Parrott Contracting, Inc. for the replacement of the
stormwater pipe on Norton Drive with the costs to be paid out of Storm Drainage Funds.
bone
Public W 0
BUpmp
ENGRlEFIPPENNINGTON/COUNCIUSTORMPIPEQUOTES
Bruce Loney
From: Dave Rutt
Sent: Monday, October 17, 2005 11 :08 AM
To: Mike Hullander; Bruce Loney
Subject: FW: Storm Sewer Repair at Norton Drive
-----Original Message-----
From: Joanie Engler [mailto:joaniee@smhentges.com]
Sent: Monday, October 17, 2005 11:02 AM
To: Dave Rutt
Subject: Storm Sewer Repair at Norton Drive
Public Works
Dave Rutt
500 Gorman Street
Shakopee, MN 55379
Dear Dave, \
S.M. Hentges & Sons, Inc will supply labor and material to install new 42" storm line with
two aprons for the sum of $23,237.00
This price includes bituminous ,removal, temporary traffic control, bypass pumping, 60 ton
of class-5, export excess dirt,\10 cy rip rap, removal of existing cmp, stabilization
rock, 48 LF 42 Class-3 RCP, 2 RCP aprons.
If this is acceptable please let me know so that we are able to schedule this work.
Sincerely,
Gary Zajac
Project Manager
1
Message Page 1 of2
Bruce Loney
From: Dave Rutt
Sent: Thursday, October 13, 2005 7:19 AM
To: Bruce Loney; Mike Hullander
Subject: FW: Shakopee - culvert - Norton Dr
-----Original Message-----
From: Parrott Contracting - Dave & Marcia [mailto:dparrott@frontiernet.net]
Sent: Wednesday, October 12, 2005 8:39 PM !
To: Dave Rutt
Subject: Shakopee - culvert - Norton Dr
PARROTT CONTRACTING, INC.
30090 STATE HWY 93
HENDERSON MN 56044
507 -248-9697 (office/fax)
PROPOSAL
PROPOSAL SUBMITTED TO: Dave Rutt - City of Shakopee
JOB NAME: Culvert Replacement
ADDRESS: Norton Drive
,
DATE: October 12.2005
We hereby submit specifications and estimates as per discussion:
Replace washed out 30" culvert with 42" RCP
Includes:
. 52' - 42" RCP (class 2)
. 2 ea. - 42" FES (no trash guard)
. 60'(+1-) temporary bypass culvert (18")
. Remove & dispose of existing asphalt (asphalt restoration by city)
. Supply Class 5 as necessary
Any import or export of soil by city
TOTAL: $14,150.00
Rip-rap @ $45.00 piton if necessary
10/17/2005
Message Page 2 of2
Prices do not include any costs for: w.A.C. or S.A.C., special licenses, dewatering, frost ripping, bond or share of
bond, final adjustment of structures by others, construction staking, engineering fees or testing unless otherwise
states above.
Parrott Contracting hereby proposes to furnish labor and materials - complete in accordance with above
specifications, for the sum of fourteen thousand one hundred fifty and 00/100($14,150.00) with payment to be
made as follows: 30 days following completion late charges at 1.5% p/month.
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any
alterations for deviation from above specifications involving extra costs, will be executed only upon written orders, and will become an extra
charge over and above the estimate. All agreements contingent upon strikes, accidents, or delays beyond our control. This proposal is
subject to acceptance within 1.Q days of bid opening and is void thereafter at the option of the undersigned.
AUTHORIZED SIGNATURE DATE
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are hereby accepted. You are authorized to do the work as specified.
Payment will be made as outlined above.
AUTHORIZED SIGNATURE DATE
10/17/2005