City Council is asked to review and provide direction for the 2006-2010 Parks Capital
Improvement Program. The CIP was originally reviewed by the Parks and Recreation
Advisory Board in June. Comments, suggestions, and further revenue/cost information
was incorporated into the CIP for follow-up review at the August Advisory Board Meeting,
DISCUSSION
The following is a summary of key items in the CIP that you should be aware of and may
want to discuss:
. 2006 Projects
As you are aware, 2006 contains a significant number of park projects. Two of the
more significant projects include Huber Park redevelopment and Tahpah Park
improvements. In addition, there are a number of smaller projects that, although they
are being constructed by developers, still involve significant city involvement:
Countryside parks (3), Valley Creek Crossing park, and Glacier Estates park. Finally,
other projects on the list for 2006 include Dean Lakes trail construction and the 1 ih
Avenue Sports Complex (soccer complex) building construction, and the Aquatic Park
building.
Huber and Tahpah Parks
Huber Park and Tahpah Park will be major projects, and the costs reflect this. We will
be completing detailed final design for Huber Park over the fall and will be revising
cost estimates as we proceed through the design process. Tahpah Park design will
begin in September, and will likely proceed through early winter for spring bidding and
late summer construction. One specific item to note with Tahpah is that the estimated
cost for the Taphah parking lot reconstruction has increased significantly as we have
assembled more accurate cost estimates. As before, the parking lot is proposed to be
attached to another public improvement project and bonded.
Aquatic Park Building
We have more accurate cost estimates for the Aquatic Park building based on similar
buildings recently constructed. These cost estimates put the building and site
improvements at approximately $1 million. According to other cities and their
architects that we talked to, the construction of these buildings runs $225-$250/square
foot, and the buildings range in size from 3,000-5,000 square feet:
...
.
"
Facility Square Foot Year Built Estimated Comments
2006 Cost
Waterworks, 3,140 2000 $800,000 No
Ramsey County concessions
Parks and
Recreation -
Lake Minnetonka 4,380 1994 $875,500 Sand bottom
Regional Park, facility, Most
Three Rivers similar to
Park District ours.
Hastings Family 5,200 1999 $1.3 million
Aquatic Center
Richfield Aquatic 5,400 2002/2003 $1,35 million
Center
Shady Oak 8,000 1998 $2 million Multiple
Beach, structures
Minnetonka
Westchester/Providence Point Park
As a result of the project list for 2006, Westchester/Providence Point Park
development that was originally scheduled for 2006 has been deferred to 2007. In
some respects, it makes more sense to defer this park so design and development
can be coordinated with Greenfield/Park Meadows park, and the projects bid together.
However, the residents of the Westchester area have been vocal about their needs for
the park to be developed.
. Project Cost Estimates
As you know, we have been plagued with inaccurate cost estimates in previous CIP's.
This revised CIP has been updated with what we feel are more accurate cost
estimates derived from calculating per facility costs (such as the cost to construct a
parking lot based on per parking space estimates, the cost for a ball field, the cost for
a play structure, etc,), and trying to predict what facilities will be constructed in each
park. In addition, we have factored costs for inflation for those projects that are two or
more years out. However, even with this information, there is some uncertainty to the
cost estimates since no design work has been undertaken on the majority of projects
being proposed,
. Funding
The proposed CIP shows significant park dedication revenue that is expected to come
in yet in 2005. I believe these are accurate numbers as most of the developments
have received at least preliminary plat approval.
As we move beyond 2005, it is somewhat more difficult to project park dedication
revenue. The June version of the CIP that the Advisory Board reviewed indicated
approximately $900,000 per year in park dedication revenue. That would require park
dedication payment on approximately 294 single family lots,
With City Council's proposed growth management policy of 500 lots platted in anyone
year, I have reduced the revenue estimate to $500,000 per year, which equates to
park dedication fees from approximately 108 lots.
"i
.
Over the past few years, we have exceeded $1 million per year in park dedication
revenue. Whether it is $500,000 or $1 million, future decisions about whether to
require land dedication or cash contribution will impact the revenue stream and will
need to be monitored. For example, a single large development (such as the proposed
D.R. Horton development on County Road 15) can significantly change (improve) the
funding,
. 2010 Fund Balance
The 2010 fund balance shows a deficit of $3.1 million, with several projects moved to
2010 to address prior-year funding issues. Given the projects, there is not enough
projected revenue to meet the long-term needs. Again, revenue will need to be
monitored closely over the next few years to determine whether or not project
timelines can be adjusted, and ultimately some projects may need to be deferred
further,
Parks and Recreation Advisory Board Comments/Recommendations
1. As you are aware, the Advisory Board has recommended that the city retain services
to administer the 2006 construction projects. This could be an existing staff member,
temporary hire, or contractual services. I have discussed the feasibility of an existing
Engineering staff member with Mr. Loney, and I am also getting an estimate for
contractual services, Once we have more information, I will return to you with a
recommendation.
2. Small Improvement Projects was not included in the CIP that the Advisory Board
reviewed in August. They recommended that this be added back into the plan to
provide funding for small projects that arise during the year. It has been included in the
latest version.
REQUESTED ACTION
City Council is asked to review and provide direction to staff with proposed changes.
, .
City of Shakopee Ca itallmprovement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Andrea Weber Park Development Greenfield West Neighborhood Park 346,000
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 330,000
Improvements
Engineering/Admin, 16,000
Total 346,000 - - - - -
B. ,Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 346,000
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
, Tax Levy
Total 346,000 - - - - -
DescriDtion
This project would develop the west park in the Greenfield Development. The park is approximately 4 acres,
Construction: $330,000 (Park Reserve)
Play equipment. tennis court, basketball court, trails, landscaping
Engineering/Admin: Design and construction administration of park development (5% of total project costs)
(Park Reserve)
Justification
This provides for development of a park in the Greenfield development, which is built out.
Other Comments
ODeratina Costs
Estimated yearly operating costs: Labor $1 0.000 + Equip/Supplies $5,000 = $15,000
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Mark Themig Special Facility Construction Community Playground Build 300,000
Year Added to CIP: 2005
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 300,000
Improvements
Engineering/Admin.
Total 300,000 - - - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund
Grants (specify)
Donations (specify) 300,000
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total 300,000 - - - - -
DescriDtion
This project is a community supported, funded, and constructed playground that will serve as a
destination for many users. Similar playgrounds include Skyline in Burnsville and the recently
constructed playground in Waconia.
Construction: $300,000 (Donations from Community Playground Committee)
Material ($140,000) and Labor
Justification
This project ;s a community building project that provides a unique recreational amenity at little or !
no cost to residents that will serve as a focal point for the park.
Other Comments
ODeratina Costs
$2,000-$3,000 per year
, '.
.
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Andrea Weber Park Development Church Addition Neighborhood Park 205,000
Year Added to CIP: 2006
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 200,000
Improvements
Engineering/Admin. 5,000
Total 205,000 - - - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 5,000
Grants (specify)
Donations (specify) 200,000
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total 205,000 - - - - -
DescriDtion
This project would develop the Church Addition Park,
Construction: $200,000 (By Developer for Park Dedication Credit)
Play equipment, court, trails, picnic tables, Shelter, water fountain, landscaping
Engineering/Admin: Plan review and construction adminstration (2,5% of total project costs) (Park Reserve)
Justification
This provides for development of a park in the Church Addition, which is estimated, to be built out in
2005/2006.
Other Comments
Developer is required to design and construct park as part of the development. Developer would be credited
construction costs toward total park dedication fees of $214,000. Estimated Improvements are $200,000 plus
staff administration (2.5%) for a total of $205.000.
ODeratina Costs
Estimated yearly operating costs: Labor $5,000 + Equip/Supplies $2,500 = $7,500
-
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Mark Themig Land Acquisition and Development Quarry Lake Park and Special Use Facility 2.014,000
Year Added to CIP: 2005
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW 250,000
Construction 560,000 560,000 560,000
Improvements
Engineering/Admin. 14.000 14,000 14,000 14,000 28,000
Total 250.000 14.000 574.000 14.000 574.000 588,000
B. : Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 250,000 14,000 14,000 14,000 14,000 28,000
Grants (specify) 280,000 280,000 280,000
Donations (specify) 280,000 280,000 280.000
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total 250.000 14.000 574.000 14. 000 574,000 588.000
DescriDtion
This project would provide funding for acquisition of the restored Aggregate Industries quarry site. and funding
for future development.
Land Acquisition: $250,000 (Park Reserve)
Construction (from 2004 Concept Plan cost estimates): $1.680.350 (Donations and Grants)
Infrastructure (bridge, roads. parking. utilities)- $630.000
Trails (bituminous and boardwalk) - $625,350
Plantings (shoreline and site) - $124,000
Site Amenities (picnic tables. grills, fencing. signage. etc.) - $301,000
Engineering/Admin: Design and const. administration of improvements (5%) (Park Reserve)
Justification
This project would acquire and develop facility as recreational amenity for the city.
Other Comments
Funding sources include grants and partnerships with committee members, $92.000 DNR grant awarded in
2005, All costs listed are estimates,
ODeratina Costs
Unknown, Costs would depend on scope of development.
.
.
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Community Park Project Title: Total Project Cost:
Andrea Weber Improvements Lions Park Improvements 45,000
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction
Improvements 5,000 10,000 30,000
Engineering/Admin,
Total 5,000 10,000 30,000 - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 3,000
Grants (specify)
Donations (specify) 2,000 10,000 30,000
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total 5,000 10,000 30,000 - - -
Description
Lions Club has plans for continued improvements in Lions Park,
2005 - Improvements: Fountain, $5,000 (Park Reserve and Lions Club donation)
2006 - Improvements: Entrance and suffle board court, $10,000 (Lions Club donation)
2007 - Improvements: Shelter by pond and irrigation, $30,000 (Lions Club donation)
Justification
Projects have been identified by Lions Club, and would serve park users,
Other Comments
Proceeds from LionsPark land sale in 2003 ($41,000) have been deposited into Park Reserve fund and
should be used to help fund future park improvements.
Operatina Costs
Estimated year operating costs: Labor $1 ,000 + Equip/Supplies $1,000 = $2,000
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Mark Themig Park Redevelopment Huber Park Redevelopment 3,603,950
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 2,298,950 1,250,000
Improvements
Engineering/Admin. 55,000
Total - 2,353,950 - 1,250,000 -
B. : Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 1,455,000
Grants (specify) 92,000 1,250,000
Donations (specify) 608,450
State Aid
Assessments 198,500
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - 2,353,950 - - 1,250,000 -
DescriDtion
This project continues development of Huber Park, including grading, installation of a performance area, landscaping, trail
connections, parking, and riverbank stabilization. The project would be done in two phases:
2006 - Construction, Phase 1 (From 01105 Cost Estimates and 06/05 Feasibility Study)
Phase 1a: Parking, roadway, watermain extension, alley power line undergrounding, $535,450 (Feas, Study):
$315,300 (Park Reserve), $198,500 (Assessments), $21,650 (SPUC Donation)
Phase 1b: Peliormance area, building, trails,landscaping,lighting, site amenities, $1,763,500 (1/28/05 estimate):
$1,084,700 (Park Reserve), $92,000 (Grants), $586,800 (Donations)
2006 - Engineering/Admin: Remainder of Bonestroo contract for design, $55,000 (Park Reserve)
2008 - Construction, Phase 2 (01/05 Cost Estimates):
Riverbank Stabilization Design and Construction, $1,250,000 (Grants - Army Corp Project.)
Justification
Redevelopment of focal park for the community,
Other Comments
Cost estimates are from 01/05 project budget estimate prepared by Bonestroo. Updated cost estimates will be determined
during final design. Council determined $1.4 million from Park Reserve for project construction. City received $92,000 DNR
grant for project, Donations are needed to meet full project budget, or project reductions will be needed
Ooeratina Costs
Estimated year operating costs: Labor $15,000 + Equip/Supplies $5,000 = $20,000
Funding for performances and coordination of performance schedule has yet to be determined.
.
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Mark Themig Special Facility Construction Levee Drive Parking Lot 71,750
Year Added to CIP: 2006
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 70,000
Improvements
Engineering/Admin. 1,750
Total - 71,750 - - -
B. : Fundin Source:
General Fund
Capitallmprovement Funds
Park Reserve Fund 1,750
Grants (specify)
Donations (specify) 70,000
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - 71,750 - - - -
DescriDtion
This project relocates the boat landing to the north side of the river.
Construction: $70,000 (HRA Funding for Northridge Court Project)
Reconstruct Levee Drive parking lot
Engineering/Admin: Design and construction administration (2,5% of project costs) (Park Reserve),
Justification
Additional parking and trail head area.
Other Comments
HRA obligated to construct parking lot as part of HRA project, but relocation of power line undergrounding not
complete, HRA has asked to be relieved of construction obligations. Bidding with Huber Park redevelopment should
help ensure a better bid,
ODeratina Costs
Estimated year operating costs: Labor $500,
City of Shakopee Capital Improvement Program 2006.. 2010
Project Manager Project Type: Project Title: Total Project Cost:
Mark Themig Special Facility Construction Minnesota River Boat Landing Relocation 128,125
Year Added to CIP: 2006
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 125,000
Improvements
Engineering/Admin. 3,125
Total - 128,125 - - -
B. : Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 3,125
Grants (specify) 125,000
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - 128,125 - - - -
DescriDtion
This project relocates the boat landing to the north side of the river,
Construction: $125,000 (Grant Funding through DNR and Lower Minnesota Watershed District)
Reconstruct boat landing and repave parking lot,
Engineering/Admin: Design and construction administration (2,5% of project costs) (Park Reserve)
Justification
Existing landing needs to be replaced..
Other Comments
US Fish & Wildlife has granted necessary easements, DNR has awarded $100,000 toward project, and Lower
Minnesota River Watershed District has indicated support. Additional funds may be available from the DNR. Project
would be bid with Huber Park redevelopmen
ODeratina Costs
Estimated year operating costs: Labor $1 ,000
City of Shakopee Capital 1m rovement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Mark Themig Special Facility Construction Archery Range Relocation 75,000
Year Added to CIP: 2006
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 75,000
Improvements
Engineering/Admin.
Total - 75,000 - - -
B. : Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 35,000
Grants (specify) 20,000
Donations (specify) 20,000
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - 75,000 - - - -
DescriDtion
This project relocates the archery range to the north side of the Minnesota River and uses the boat landing
improvements for access,
Construction: $75,000 from DNR estimate (DNR Grant, Donations, and Park Reserve)
Roadway and Parking Lot
Clearing and grubbing
Site amenities (targets, picnic tables, signs, etc,)
Justification
Replaces range removed from Lions Park due to safety reasons, Many archers have been in contact about replacin
the range,
Other Comments
DNR has committed $20,000 toward project, Local donations from the Scott County Chapter of the Minnesota Deer
Hunters Association and other organizations are anticipated at $20,000. City's $35,000 contribution would provide
paved roadway that would reduce long-term maintenance costs, which is important due to flood plain location,
Roadway would be bid with Huber, Park redevelopment.
ODerating Costs
Estimated year operating costs: Labor $1 ,000
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Andrea Weber Special Facility Construction Tahpah Park Improvements 1 ,435,500
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 915,000
Improvements 390,000
Engineering/Admin. 130,500
Total 1,435,500 - - - -
B. : Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 455,250
Grants (specify)
Donations (specify)
State Aid
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy 980,250
Total 1,435,500 - - - -
DescrlDtlon
This project makes improvements to Tahpah Park, including one new baseball field, extending softball field fences, installing lights,
reconstructing parking lot, and replacing play equipment.
Construction: $915,000 (Tax Levy)
Reconstruct (240) space parking 101 @ $3,OOO/per space, $720,000
Replace playground equipment for $75,000
Pave 40 spaces of parking on existing gravel area @ $3,000/space, $120,000
Improvements: $390,000 (Park Reserve)
Baseball field, $170,000
Light softball fields 1 & 4, $200,000
Relocate fences 2 fields 1100 LF @$9/LF, $10,000
Irrigation expansion, $10,000
Engineering/Admin: Design and construction administration, (5% of project costs) (Tax Levy and Park Reserve)
Justification
The original parking lot has exceeded its life expectancy of 20 years, and there is a portion of the lot that has never been finished, Unfinished
gravel parking does not meet city ordinance. The play equipment did not meel current safety standards and was removed in 2004,
Other Comments
Shakopee Youth Baseball Association originally committed to assist with funding lhe baseball field with revenue from a proposed batting cage
operation, However, the city would have needed to fund the installalion costs of the cage, and possibly operate the facility long-term, Since lhis
concepl is not part
of the proposed work allhis time, the funding commitment has been withdrawn.
ODeratlna Costs
The estimated operating costs for addilional baseball field is approximately $2,000 per year, Lighling two softball fields with lights would add
$800 per year for operating 4 nights per week,
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Mark Themig Special Facility Construction 17th Avenue Sports Complex 536,000
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 521,000
Improvements
Engineering/Admin, 15,000
Total - 536,000 - - -
B. : Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 536,000
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - 536,000 - - - -
DescriDtion
This project would provide funding for completion of the 17th Avenue Sports Complex, -
Construction: Completion of Phase 2, $520,000 (Park Reserve)
Building, inc. permits -$493,000
Water and Sewer Fees - $13,000
Fencing - $10,000
ADA Modifications - $5,000
Engineering/Admin: Architectural fees $15,000 (Park Reserve)
Justification
This project completes the development of a major sports complex that will serve the City's needs for many
years, The building will need to be constructed of durable materials that will stand up to public use, as well as
abuse (vandalism), Costs reflect similar buildings,
Other Comments
There was an extensive design process that produced the original design for the building, which bid in spring
2005, Low bid ($528,000) was overbudget. On June 7, 2005, City Council set a maximum construction budget
of $520,000 for Phase 2.
ODeratina Costs
Estimated operating costs: $5,000
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Andrea Weber Park Development Countryside Neighborhood Parks (3 Parks) 675,475
Year Added to CIP: 2006
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 659,000
Improvements
Engineering/Admin, 16,475
Total - 675,475 - - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 16,475
Grants (specify)
Donations (specify) 659,000
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - 675,475 - - - -
DescriDtion
This project would develop three parks that will serve the Countryside development.
Construction: $659,000 (8/05 estimate) (By Developer for Park Dedication Credit)
Northeast Park: $305,000 (gazebo, playground, basketball, trails, landscaping)
Northwest Park: $236,000 (pergola, playground, trails, 1/2 court basketball, landscaping)
Southwest Park: $118,000 (playground, trails, bridge
Engineering/Admin: Plan review and construction adminstration (2.5% of total project costs) (Park Reserve)
Justification
This provides for complete development of three parks in the 427 home Countryside development, which is
estimated to be built but in 2007,
Other Comments
Developer is required to design and construct park as part of the development. Developer would be credited
construction costs toward park dedication fees of approximately $1,314,330, Estimated Improvements are
$659,000 plus staff administration (2,5%) for a total of $16,475,
ODeratina Costs
Estimated yearly operating costs: Labor $10,000+ Equip/Supplies $5,000 = $15,000
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Andrea Weber Park and Trail Development Southbridge Area Park Development 753,770
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 140,000 81,060 276,000 497,000
Improvements 20,000
Engineering/Admin. 7,000 3;860 13,800 24,850
Total - 147,000 84,920 309,800 - 521,850
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 147,000 84,920 309,800 521,850
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - 147,000 84,920 309,800 - 521,850
DescriDtion
This project would develop several park areas in the South bridge Development, including the MNDOT 75 parcel.
2006 - Construction: Park development of Savanna Oaks in Southbridge, $140,000 +5% Design and construction admin,
$7000, $147,000 (Park Reserve)
2007 - Construction: Trail from Cambridge Road to Whitehall Road along gas easement to connect to school trail, 2600LF
@$27/LF=70,200+10%(inflation per year), $77,200+5% Design/Admin, $3860, $81,060 (Park Reserve)
2008 - Construction: Park at Southbridge Pkwy: Basketball $25,000 2 Tennis courts 70,000, Gazebo 50,000 Water fin
5,000 and Plantings 20,000, concrete and trails, $20,000, earthwork, 30,000 site furniture, 10,000 = $230,000 plus 20%
inflation, 46,000 5% design and admi~, total $289,500 (Park Reserve)
2008 - Improvements: Installation of fishing pier,$20,000 (DNR Fishing Pier Grant)
2010 - Construction: MNDOT 75 parcel 2 mi trail @27/LF=285,OOO+40% inflation, $399,00.. shelter, picnic kiosk,
$60,000+40%=$84,000, lights at kiosk 10,000 +40%= $14,000 total $497,00+5% Design/Admin, $ 24,850,$521,850
(Park Reserve)
Justification
In 2001, the City worked with residents to prepare a master plan for the Southbridge area. The improvements identified in
this project are a portion of the overall master plan
Other Comments
Estimated cost for total development of the system based on the master plan is $3 million (2001).
ODeratina Costs
Estimated costs: Labor $50,000 + Equip/Supplies $25,000 = $75,000 (when fully developed)
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Trail Project Title: Total Project Cost:
Andrea Weber Trail Construction Dean Lake Trail System (North Segment) 208,635
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 198,700
Improvements
Engineering/Admin. 9,935
Total - 208,635 - - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 208,635
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total 208,635 - - - -
Descriotion
This project would construct a trail in the Dean Lake area to connect with trail being constructed as part oftt
west Dean Lake developments,
Construction: $198,700 (Park Reserve)
Paved trail from Wakefield to the west side of Dean Lake, Trail would be bituminous with a bridge
to cross the outlet channel.
Trail Construction at $27/LF for 2800 feet=$75,600+1 0% inflation=$83,160 ,I
Bridge 10' wide by 20' long=$115,500
Engineering/Admin: Design and engineering, (5% of project cost) (Park Reserve),
Justification
Identified in Southbridge Master Plan, Trail through Dean Lakes Development is constructed and dead ends
at city property, This would provide trail connections to Southbridge,
Other Comments
Work would be conducted after planned Dean Lake outlet channel control structure is installed,
Ooeratina Costs
Estimated costs: Labor $1 ,000
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Andrea Weber Park Development Valley Creek Crossing Neighborhood Park 123,000
Year Added to CIP: 2006
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 120,000
Improvements
Engineering/Admin, (5%) 3,000
Total - 123,000 - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund
Grants (specify) 120,000
Donations (specify) 3,000
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total 123,000 - - - -
DescriDtion
This project would develop the Valley Creek Crossin g Parle
Construction: $120,000 (By Developer forPark Dedication Credit)
Play equipment, trails, picnic table, landscaping
Engineering/Admin: Plan review and construction adminstration (2,5% of total project costs)
Justification
This provides for development of a park in the Valley Creek Crossing development, which is estimated to be
built out in 2005/2006,
Other Comments
Developer is required to design and construct park as part of the development. Developer would be credited
construction costs toward total park dedication fees of $128,358, Estimated Improvements are $120,000 plus
staff administration (2,5%) for a total of $123,000,
ODeratina Costs
Estimated yearly operating costs: Labor $5,000 + Equip/Supplies $2,500 = $7,500
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Andrea Weber Park Development Glacier Estates Neighborhood Park 112,750
Year Added to CIP: 2006
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 110,000
Improvements
Engineering/Admin.. (5%) 2,750
Total - 112,750 - - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund
Grants (specify)
Donations (specify) 112,750
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total 112,750 - - - -
Description
This project would develop the Glacier Estates Park as part of the development.
Construction: $110,000 (By Developer for Park Dedication Credit)
Play equipment, trails, picnic table, landscaping
Engineering/Admin: Plan review and construction adminstration (2.5% of total project costs)
Justification
This provides for development of a park in the Valley Creek Crossing development, which is estimated to be
built out in 2006/2007.
Other Comments
Developer is required to design and construct park as part of the development. Developer would be credited
construction costs toward total park dedication fees of -$115,000, Estimated Improvements are $110,000
plus staff administration (2.5% of project costs).
Operatina Costs
Estimated yearly operating costs: Labor $5,000 + Equip/Supplies $2,500 = $7,500
City of Shako pee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Mark Themig Special Facility Construction Off-Leash Dog Area 15,000
Year Added to CIP: 2006
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 15,000
Improvements
Engineering/Admin.
Total - 15,000 - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund
Grants (specify)
Donations (specify) 15,000
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - 15,000 - - -
DescriDtion
This project creates the first off-leash dog area for Shakopee. Potential sites include land north of
Memorial Park along the Minnesota River, land owned by Metroplitan Council adjacent to the Blue
Lake water treatement plant, open space in South bridge, and potentially a small portion of Lions
Park, A Shakopee Youth has volunteered to do fundraising for the initial site and would coordinate
some of the site development work, such as installation of fencing, signage, etc.
Construction:
2006 - Memorial Park Site, $15,000 (Donations from Eagle Scout fundraising project)
Estimated Future Site Development Costs:
Blue Lake, $51,000; Southbridge, $39,000; Lions Park, $25,500
Justification
This project responds to resident requests for a legal place to run dogs off leash.
Other Comments
Most likely would begin with a single site and evaluate need for additional sites in the future.
ODeratina Costs
$1 ,OOO/site per year.
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Andrea Weber Improvements Park Signage 70,000
Year Added to CIP: 2006,
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction
Improvements 35,000 35,000
Engineering/Admin,
Total - 35,000 35,000 - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 35,000 35,000
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - 35,000 35,000 - - -
Description
This project provides funding for designing and installing new park signs for all park locations, phased over
two years,
Improvements, $70,000 (Park Reserve):
.." (..... Neighborhood Park Signs, 20 @ $2,500 ea = $50,000
1-- _J """""'_"-"'"..".tI' Community Park Signs, 4 @ $5,000 ea = $20,000
Justification
This project would standardize signing for all parks and help create uniform identity for park areas,
Other Comments
n Work would be coordinated by intern included in 2006 operating budget and overseen by Andrea Weber,
.:...1"<\ I Operatina Costs
I:>~
[2r'
,,J;
.
City of Shako pee Capital Improvement Program 2006 - 2010 .
Project Manager Project Type: Project Title: Total Project Cost:
Andrea Weber Park Development Providence/Westchester Community 938,700
Year Added to CIP: Park
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction
Improvements 894,000
Engineering/Admin. 44,700
Total - - 938,700 - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 938,700
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - 938,700 - - -
Descrintion
This project would develop the park that will serve both Providence Point and Westchester developments.
The park is approximately 12 acres,
Construction: $894,000 (Park Reserve)
Play equipment $75,000, Ball fields $150,000, hockey rink $50,000, basketball court $25,000,
Lighting $100,000, Planting, $20,000, earthwork $30,000, trails and walks $20,000 and shelter
building $200,000, parking, $75,000 total $745,000+20% inflation
Engineering/Admin: Design and construction administration of park development (5% of total project costs,
which includes additional costs for design of building) (Park ReservE
Justification
This prOVides for development of a park in the Providence Point and Westchester developments, (also servi
ACC development) which is estimated to be built out by 2006.
Other Comments
Actual park amenities would be determined in planning process with residents, This park will likely serve as a
location for organized activities such as playground programs and youth sports.
Ooeratina Costs
Estimated yearly operating costs: Labor $15,000 + Equip/Supplies $10,000 = $25,000
City of Shako pee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost
Andrea Weber Park Development Greenfield/Park Meadows Community 938,700
Year Added to CIP: Park
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction
Improvements 894,000
Engineering/Admin, 44,700
Total - - 938,700 - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 938,700
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - - 938,700 - -
DescriDtion
This project would develop the east park in the Greenfield Development, which is adjoined by 8 acres from
Park Meadows, for a total of 13 acres,
Construction: $894,000 (Park Reserve)
Play equipment $75,000, Ball fields $150,000, hockey rink $50,000, basketball court $25,000
Lighting $100,000, Planting, $20,000, earthwork $30,000, trails and walks $20,000 and shelter
building $200,000, parking, $75,000 total $745,000+20% inflation
Engineering/Admin: Design and construction administration of park development (5% of total project costs,
which includes additional costs for design of building) (Park ReservE
Justification
This provides for development of the second park in the Greenfield development, which is estimated to be
built out in 2005, and neighboring developments to the east.
Other Comments
Actual park amenities would be determined in planning process with residents, This park will likely serve as a
location for organized activities such as playground programs and youth sports.
ODeratina Costs
Estimated yearly operating costs: Labor $15,000 + Equip/Supplies $10,000 = $25,000
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
To Be Determined Park and Trail Development Horizon Heights Open Space 210,000
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 200,000
Improvements
Engineering/Admin. (5%) 10,000
Total - - 210,000 - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 210,000
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - - 210,000- -
DescriDtion
This project would construct trails and park amenities in the Horizon Heights development.
Construction: $200,000 (Park Reserve)
Park and trail development
Engineering/Admin: Design and construction of park development, (5% of total project costs) (Park Reserve)
Justification
II The city has undeveloped open space in this area that could accommodate trails and small park amenities,
Proposed improvements have been part of the CIP for many years,
other Comments
,'I Actua' pa'" ame""'es WOU~ be deleom''''''' '" p'a""'"9 p= wffh ,esldems. F,fu", pa'" dedl""tio"s from
adjacent undeveloped land may be better suited for active recreational use,
ODeratina Costs
Unknown at this time - dependent on scope of development.
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
To Be Determined Park Development Riverside Bluffs Community Park 675,675
Year Added to CIP: 2005
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 643,500
Improvements
Engineering/Admin, 32,175
Total - - - - 675,675 -
B; Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 675,675
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Tn.lnk
Tax Levy
Total - - - - 675,675 -
DescriDtion
This project would develop the park area in the Riverside Fields Riverside Bluffs and Ridge Creek
developments, The park is approximately 8 acres" and could be connected to park land to the west in the
future,
Construction, $643,500 (Park Reserve)
Play equipment $75,000, Basketball court $25,000, trail $5000, Hockey $50,000, two ballfields
$300,000, earthwork and plantings $40,000 total $495,000 +30% inflation
Engineering/Admin: Design and construction of park development, (5% of total project costs) (Park Reserve)
Justification
This provides for development of a larger park that will serve several developments east of Dean Lake and
westofCR 18-
Other Comments
Actual park amenities would be determined in planning process with residents, The city received $50,000 as
part of Riverside Fields development to be applied to the development of this park,
ODeratina Costs
Estimated yearly operating costs: Labor $15,000 + Equip/Supplies $10,000= $25,000
City of Shako pee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
To Be Determined Park Development Killarney Hills Neighborhood Park 367,500
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 350,000
Improvements
Engineering/Admin. - 17,500
Total - - - - - 367,500
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund - 367,500
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - - - - - 367,500
DescriDtion
This project would develop the Kilarney Hills park. The park is approximately 3 acres,
Construction: $350,000 (Park Reserve)
Play equipment, courts, trails, picnic area
Engineering/Admin: Design and construction of park development (5% of total project costs) (Park Reserve)
Justification
This provides for development of a park in the Killarney Hills subdivision, which would also serve future
development north of 17th Avenue, If 17th Avenue is built out sooner and development occurs in the area,
this park may need to be moved up,
Other Comments
Actual park amenities would be determined in planning process with residents,
ODeratina Costs
Unknown at this time - dependent on scope of development.
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
To Be Determined Land Acquisition and Development Prairie Village Neigborhood Park 357,500
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW 200,000
Construction 150,000
Improvements
Engineering/Admin. 7,500
Total - - - - - 357,500
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 357,500
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - - - - - 357,500
DescriDtion
Provides for acquisition of 2 acres of land adjacent to Prairie Village development.
Land and ROW: $200,000 (Park Reserve)
Construction: $150,000 (Park Reserve)
Play equipment, trail connections, picnic area
Engineering/admin: Design and construction of park, (5% of project cost)
Justification
In 2002, residents from Prairie Village development asked City Council if it could obtain land to locate a park
near their subdivision, Council directed staff to investigate potential sites, Staff approached Beta Seed in 20
for possible land sales, but Beta Seed declined,
Other Comments
The City received cash in lieu of land in this development, and there are no nearby recreational amenities, If
land is not available, another option that could be pursued is to work with St. Francis and include a
recreational amenity as part of their future expansion,
ODeratina Costs
Unknown at this time - dependent on scope of development.
Ci of Shakopee Capital Improvement Pro ram 2006 - 2010
Project Manager Project Type: Project Title: --- Total Project Cost:
To Be Determined Park Improvements O'Dowd Lake Community Park Improvements 485,100
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 462,000
Improvements
Engineering/Admin. 23,100
Total - - - - - 485,100
B. ,Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund - 485,100
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - - - - 485,100
Description
This project would develop O'Dowd Lake Park with larger picnic shelters and parking.
Construction: $462,000 (Park Reserve)
Two large picnic shelters 160,000, Site furniture $20,000, 50 car parking @ $3,000/space=$150,OOO,
total $330,000 + 40% inflation
Engineering/Admin: Design and construction of park improvements, (5% of project costs) (Park Reserve)
Justification
This community park is located on the shores of O'Dowd Lake, The city has made improvements at the site
over time including trails, canoe launch, retaining walls, fishing pier, and stairways.
The city built a temporary parking area and restricted vehicle traffic in 2003.
Other Comments
Operatina Costs
Estimated yearly operating costs: Labor $10,000 + Equip/Supplies $5,000 = $15,000
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
To Be Determined Trail Construction CR 79 Trail 257,500
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW 100,000
Construction 150,000
Improvements
Engineering/Admin, 7,500
Total - - - - - 257,500
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 257,500
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - - - - 257,500
DescriDtion
This project will design and construct a segment of the trail from CR 78 to O'Dowd Lake Park,
Land & ROW: Acquire needed easements, $100,000 (Park Reserve)
Construction: $150,000 (Park Reserve)
Engineering/Admin: Design and construction oHrail (5% oHotal project costs) (Park Reserve)
Justification
Segment is identified on the City's trail plan as a key connection to future O'Dowd Park improvements.
Other Comments
Scott County has assumed responsibility for the regional trail connection along CR 79 from 169 to CR 78,
Portions of this trail are being constructed in 2005, but the timeline for the remaining conneciton to CR 78 is
dependent on additional funding,
ODeratina Costs
Estimated yearly operating costs: $1,000
.
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Trail Project Title: Total Project Cost:
To Be Determined Greenway Development Prior Lake/Spring Lake Greenway 305,000
Year Added to CIP: Corridor
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW 100.000
Construction 50,000
Improvements
Engineering/Admin, 2.500
Total - - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 152,500 152,500
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - - - - 152,mo 152,500
DescriDtion
This project would provide for greenway acquisition and improvements along the Prior Lake/Spring Lake oU'
channel, most likely south of CR 16.
Construction: Greenway improvements, $50,000 (Park Reserve)
Land & ROW: Acquisition of greenway corridor, $100,000 (Park Reserve)
Engineering/Admin: Design and construction of improvements (5% of project costs) (Park Reserve)
Justification
This project would provide the greenway connection along the Prior Lake - Spring lake outlet channel and
connect with potential greenway, open space, and park development east of Dean Lakes,
Other Comments
Greenway grants may supplement funding.
ODeratina Costs
Unknown at this time - dependent on scope of development.
City of Shakopee Capital 1m rovement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
To Be Determined Park Development Shutrop Community Park Development 525,000
Year Added to CIP: 2006
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 500,000
Improvements
Engineering/Admin, 25,000
Total - - - - - 525,000
B. : Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 525,000
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - - - - 525,000
Descriotion
This project would provide funding for future development.
I Construction: Develop park area, $500,000 (Park Reserve)
Engineering/Admin: Design and construction of park development, (5% of project costs) (Park Reserve)
Justification
This will provide funding for development of Shutrop Park in the future,
Other Comments
This park would likely remain more passive uses, so would require less funding,
Ooeratina Costs
Unknown at this time - dependent on scope of development.
.
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
To Be Determined Improvement Riverview Park Parking Lot 78,750
Year Added to CIP: 2006
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 75,000
Improvements
Engineering/Admin, 3,750
Total - - - - - 78,750
B. : Fundin Source:
General Fund
Capita/Improvement Funds
Park Reserve Fund 78,750
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - - - - - 78,750
DescriDtion
This project would provide funding for a parking lot in Riverview Park and provide accessible trail connections..
Construction: $75,000 (Park Reserve)
Engineering/Admin: Design and construction of park development, (5% of project costs) (Park Reserve)
- Justification
On street parking is limited, and users currently park on the grass,
ODerating Costs
Ci of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
To Be Determined Park Development Community Sports Complex 1,050,000
Year Added to CIP: 2006
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 1,000,000
Improvements
Engineering/Admin, 50,000
Total - - - - - 1,050,000
B. : Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 1,050,000
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - - - - - 1,050,000
Descriotion
This project would provide funding for a future sports complex.
Construction: $1,000,000 (Park Reserve)
'"', (..... Engineering/Admin: Design and construction of park development, (5% of project costs) (Park Reserve)
,-.._ -I ........_-..... ,,1/
~, ..... -" Justification
This will provide funding for a future sports complex, potentially at a future school site,
Other Comments
,~' , ~ I Ooeratina Costs
~ Unknown at this time - dependent on scope of development.
",,-
;r!'
,
City, of Shakopee Capital Improvement Program 2005 - 2009
Project Manager Project Type: Project Title: Total Project Cost:
Improvements Small'lmprovement Projects 100,000
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction 20,000 20,000 20,000 20,000 20,000
Improvements
Engineering/Admin.
Total - 20,000 20,000 20,000 20,000 20,000
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 20,000 20,000 20,000 20,000 20,000
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - 20,000 20,000 20,000 20,000 20,000
Description
This project provides funding for non-designated projects requested by Council, residents, or staff, In genen
the project should 1)correct a problem or address an issue, 2) not exceed $20,000, and 3) be consistent with
the comprehensive park plan,
.... r.... Justification
I -,,-... - J ........ - - .... _ '"
Other Comments
Operatina Costs
" I Unknown at this time - dependent on scope of projects selected,
~
h.'.~~
U~
..F
City of Shakopee Capital Improvement Program 2006 - 2010
Project Manager Project Type: Project Title: Total Project Cost:
Travis Karlen/Mark Themig Facility Improvements Aquatic Park Improvements 1,180,000
Year Added to CIP:
A. Ex enditure Items: 2005 2006 2007 2008 2009 2010
Land & ROW
Construction
Improvements 1,000,000 100,000
Engineering/Admin. 80,000
Total - 1,080,000 - 100,000 - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Building Fund 1,080,000 100,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total - 1,080,000 - 100,000 - -
DescriDtion
This project would replace the existing service building, as well as add additional play features to enhance
attendance,
2006 - Improvements: Demolish and replace existing building, add play features, $1,000,000 (Building Fund)
2006 - Engineering/Admin: Design and engineering services for project (8% of total project costs) (Building
Fund)
2008 - Improvements: Waterslide has 3-year life expectancy remaining, Will need to be replaced,
Justification
The service building was constructed in 1968, and has reached its life expectancy, Due to the type of
construction (cinder block and concrete), little can be done to make improvements, The plumbing needs
significant upgrading to repair leaks,
Other Comments
Costs of comparable buildings constructed during the past few years were used to determine this estimate.
(3,000 sq ft @ $250/sq ft, =$750,000 + $250,000 for permits and additional site amenities like fencing, shade
structures, play equipment, etc,)
ODeratina Costs
Building Rental = $38,OOO/year, Operating costs currently in operating budget.
.
City of Shako pee Capital Improvement Program 2005.; 2009
Project Manager Project Type: Project Title: Total Project Cost:
10th and Main Vacant land 50,000
A. Ex enditure Items: 2005 2006 2007 2008 2009
Land & ROW
Construction
Improvements 50,000
Engineering/Admin,
Total - - - - 50,0Q() -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-
Sanitary Sewer Fund-
Sanitary Sewer Fund-T
Storm Drainage Fund-B
Storm Drainage Fund- Tr
Tax levy
Total - - 50,000 -
escriDtion:
] Would provide landscaping, walkways, and possibly seating areas. A passive park.
City of Shakopee Capital Improvement Program 2005 - 2009
Project Manager Project Type: Project Title: Total Project Cost:
Neighborhood Park Development Mound and CR 79 Park 50,000
A. Ex enditure Items: 2005 2006 2007 2008 2009
Land & ROW
Construction
Improvements 50,000
Engineering/Admin.
Total - - - - 50,000 -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Bas
Sanitary Sewer Fund-Flo
Sanitary Sewer Fund-Trun
Storm Drainage Fund-Base
Storm Drainage Fund- Trun
Tax Levy
Total - 50,000 -
e landscaping, play equipment, walkways, and possibly seating areas. A passive park.
Justification:
This property has been undeveloped for several years,
ODeratina Costs:
Estimated yearly operating costs: Labor $1,000 + Equip/Supplies $100 = $1,100
.
. .
City of Shakopee Capital Improvement Program 2005 - 2009
Project Manager Project Type: Project Title: Total Project Cost:
Trail Construction Short Trail Connections 100,000
A. Ex enditure Items: 2005 2006 2007 2008 2009
Land & ROW
Construction
Improvements 20,000 20,000 20,000 20,000 20,000
Engineering/Admin,
Total 20,000 20,000 20,000 20,000 20,000 -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 20,000 20,000 20,000
Grants (specify)
Donations (specify)
State Aid
Assessment
Sanitary Se
Sanitary Se
Sanitary Sew
Storm Draina
Storm Drainag
Tax Levy
Total 20,000 -
cri
his project provides funding for non-designated trail projects requested by Council, residents, or
staff. In general, the project should 1)correct a problem or address an issue, 2) not exceed
$20,000, and 3) be consistent with the comprehensive park and trail plan,
Justification:
I Other Comments:
' A~Lt' I
h' ..,
C". >f~
r'"
ODeratina Costs:
Unkown.
Ci of Shakopee Capital Improvement Program 2005 - 2009
Project Manager Project Type: Project Title: Total Project Cost:
Mark Themig Facility Improvement Community Center Expansion 11,000,000
A. Ex enditure Items: 2005 2006 2007 2008 2009
Land & ROW
Construction 10,000,000
Improvements
Engineering/Admin. 1,000,000
Total - 11,000,000 - - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessmen
Sanitary Se
Sanitary Se
Sanitary Se
Storm Draina
Storm Draina
Tax Levy
Total - - -
cri
his project involves expansion of the Community Center. Although potential amenities would not
be known until a decision is made to proceed with an attempt at funding, some general costs
based on construction of similar facilities include the following:
Indoor Leisure Pool: $5,000,000 (Shoreview, Maple Grove, Maplewood)
Fitness Facility (Strength training, aerobics, cardio area) : $2,500,000 (Shoreview)
Indoor Playground:?
Banquet and Meeting Rooms:?
Teen Center: ?
Senior Center: ?
Engineering/Admin: Architectural and design services: $1,000,000 (10% of project costs)
Justification:
The city conducted a needs analysis in 2003 that found strong support for an expanded facility to
serve the growing communities needs.
Other Comments:
A citizen task force is analyzing options for the future of the Community Center. A
recommendation is expected in late summer 2004.
ODeratina Costs:
Unable to determine until facilit amenities are identified.
. .
~ ~
City of Shako pee Capital Improvement Program 2005 - 2009
Project Manager Project Type: Project Title: Total Project Cost:
Mark Themig Facility Improvement Community Center Multi-Use Facility 2,750,000
A. Ex enditure Items: 2005 2006 2007 2008 2009
Land & ROW
Construction 2,500,000
Improvements
Engineering/Admin. 250,000
Total - 2,750,000 - - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Ba
Sanitary Sewer Fund-Flo
Sanitary Sewer Fund- Tru
Storm Drainage Fund-Bas
Storm Drainage Fund-Trun
Tax Levy
Total - -
olve ckey Association's efforts to create a multi-use facility that would serve
a heet of ice during the winter, and other uses during the spring, summer, and fall.
2005 - Construction: $2,500,000 ($2.25M tax levy; $50000 donations by Shakopee Hockey
Association)
2005 - Engineering/Admin: Architectural and design services: $250,000 (10% of project costs)
Justification:
The Shakopee Hockey Association has identified a significant need for additional ice in the near
future. They are working with other user groups on a multi-use facility concept that could serve a
number of different user groups, and enhance revenue for the existing rink,
Other Comments:
A citizen task force is analyzing options for the future of the Community Center. A
recommendation is expected in late summer 2004.
ODeratina Costs:
Unable to determine until facilit amenities are identified,
Proposed 2006-2010 CIP Summary (9/01/05)
Project Task Estimate Funding Source 2005 2006 2007 2008 2009 2010 Project Mgr Status
~,?nd A~gY,ISlti9.~"", ".. ,.. '"'''' .. ~!i.9.4'sltion ,."""""", , "''''' """" ,.. ,,,,,,,2,000,000 F:~,dsB,~s~rve" ",,"" ""'" .". . "" """".... ""'" ",'" .. ''''',,'''''' "",,,.., """",. "" Nark. ....""".."" p.omp'let~""" .. "".." ". .. , ,," ." '" ,.. ., """" "''' """ ..... '" .. """" '" '" ,,,.. .. , .._ _..
""''''' ,.. ",,""'''''''''' ... ""'" " .. Aq~!,t!?nal A9.9.ul~I!!~~.fundlng . "''' " .. '" ",,~!?4,250 P!':r!<.,~~~erve ."" """" '" .. """ ... """""," '" .. """",..'" '" "", ,_ ,,"'''''' . "" '"'' ""..... . ".."" ~.9.!)1p'lete. , """ . '''''''''' . """,.. . ",,'" " '''''''' " .... '"'' ... ""'"
,~~a!e Pa~,A,~9.'tl~n _ . "''' ,,'" "" '" 9.9.~StructIO!,,,,,,, """..", """""" .." "'" '" 25,q<l!?,,, ,~!'!l< R~serv!, "'",''' , ". '" ""',,,,,... ... " """"". .. "'" """" , , '" ""'''''' .... ""''''' Andr~!,:"""", """ C9.,!)p'I!'!e .. . .. '''''' '" " .. "''''' . """'" " , """""". "'''''''''' . "'"'''''' "".. '" """ " """
,y'yhlse~nnll9.a,~s Park '"''',,''''' , '" 9..9.!1Structl?.Q, ""'''''''' """"'" ''''' '''''' 1.00,9,QQ" ,E:lY. Dev~loe,~~"" "," "" '" ..." """,. ,. "'" ""'" '" "" """"'" . """" "" "" Andr~a,,,,,,,,,,,,,, CO,,!!p'!!,te ...."" """ "" " "'''' .", '" "'" .. '" """ ., """'" . "" """. ",," ",.. . "" '" " ,,,,,, '"
,~reenfiel?"yy'~,~! Park D~y~I~p'!.!'e11t.. !?~~Ign and,,9'?~,~!,(UC!'on """ "'" .. " "" , ~~.6,Q,~9" ,p'!,rk Re~ery,~"" " " 346,q9q, , , " """"" ,. "''' """" " '" "" "'''''''''''' "''''''''''''' t\n~.re,!: '"'' Unq~Lgonst.(u9ti,'?~"""" "'''''' ".. ""'" , "'''' "" " ,,"'" """...... ,,""" "'''''' """ .. """ ",,"
,Co!T1mu~l!y' ,~4!!~'pla'y'grq~,~"L""" .... 9.,'?ns\ruc!!,?,~ """"" .... , "" '"'' ., '"'''' 3q.0,Q,QQ" ,l?,onatio.Q "" ""'," 300,,0!?9, , " .., "''''' "'''' ..,,'" '"'' , "" '"'',,''' """'" '" '''''''''''' "M~rk "'" " BUlI"LQ.g~ 4-9. ""'" ,"'"""... "" """" , "'",_ "',""" '''''''' """''','''' ""," """
Church Addition Neighborhood Park Construction 200,000 By Developer 200,000 Andrea Under Construction
Construction Administration 5,000 Park Reserve 5,000
'Quarry Lake"Reuse'ProJect ,,""" ..., i>:e<juls'iiion """'" ...., """"'" ". "'"'' '"'' "25'0,000" 'Park FieserVe ",,,,, 250,005" """" , ,"'.., , , ...." "" '" ." "" '" ",," ".. ,," """ ""Mark """, Land acqusltlon to"be'complete,i"by 12131/05 " ".. """"""" ""''''' "., ""'" """ '" ,,,, " '''' ... """
Design and Construction Administration 84,000 Park Reserve 14,000 14,000 14,000 14,000 28,000 Andrea Received grant for $92,000 to be used by end 012007
Construction 840,000 Grants 280,000 280,000 280,000 All work contingent on funding
Construction 840,000 Donations 280,000 280,000 280,000
'Llons P"ii{'Iniprovemeii'ts"'''''' """" FOllntaln' "" "'" '"'' ... ,""""""'" """''' , ,-- .. 3,0'00' Park Reserve ""." ...., "''''''3;'600 . .... , ," "''' '" . '"'''''''''' ....... """ """ , ""'''' . """'" ". Andrea'''''''' """""" .""" '"'' .. ""'" ,...." """ "" '" , "....."'"", "'''''''''' '"'''''' ,.... "" ""
Construction 42,000 Donations 2,000 10,000 30,000
Huber'Park Improveri1e'nts"'"'' ... ""'" Phase 1 Park bevelopmerii""""" """ " 1,455,0'00" Park ReserVe"""'" .. """" ,," {"455,ooo" '''' ... """ "'" ".. """ ". """"" ". """"'" Mark """ """,...." '"'' '"'''' "".. " '" "''''''' '" "" "'.. ,,""'" ,,,,,,,,,,,. "'" """... '"
Phase 1 Park Development 92,000 Grants 92,000
Phase 1 Park Development 608,450 Donations 608,450
Phase 1 Park Development 198,500 Assessments 198,500
. ,,"'" "" ,.. """ '" '"'' """.' """""''''' Pha~!,,,;?,,~!,:nk,~.tablhz,~!l9..Q, .." "","'" , l,,?,~,Q,q,Q9. Gran!s,,,,,,,,,,,, """'''''' .. "',,""""" ,""""'''' 1 ,?!?9,,9.Q9., ," """"'" """''''' '" ,Anqr~~ """.. ... E,~~,?'nll lU~~,\~ll " " ... "" '" " " '''''''''' , "'" , , , ... ""'''''','' ."" "''' "" "'" '" ". '"'' " , """
Levee Dnve Parking Lot Construction 70,000 Donations 70,000 Mark
.. ,"'''''''' "...... "" "'''''''' ,. """""" DesI911,~n,~"C~~,~tru'?tion,~9.!!."nls1!:~t!9~""" '::,:. "" ':]:,?50', Ea.rkR~~,~,,:,!,~,,,,, "''''''' "","'" ". V:!?,9." """""" _ _""", '" """" ..."'"",,'" "'''''''''''''''''' '"'''''''''' "'" "" "'""".. "."""" " ""'"'' """"'" '" ,,""" "",,,,,, ."""" """ "''''''
Minnesota River Boat Landing Relocation DeSign and Construction 125,000 Grants 125,000 Mark
Construction Administration 3,125 Park Reserve 3,125
'ArcherY Range'ReloCatlori" ".."" . ..,,'" DesignandConsii1j'ction '"'''''''''' ..""""""""", 20,000" Grants' .. ''''''''',,'' '" ..... """,.." """,,,,,. 20,000" ".." ". """"""" "'''''' """"""'" ""'''''' Mark ",,"'.. """""" '"'' """""",," '"'''' .... """",,,,,,,.. ...."'"" "'''''''' ... ,""" """,,"'" "" """," ....,,'"
20,000 Donalions 20,000
35,000 Park Reserve 35,000
'fiiFipah Park Improvements Field Improvements DeSign 'a'n,i'const "'" , """ ... 455,250" Park'Reserve """'" ....- "''' .. .... 455,250" "" .... "" '"'' "" . ""''' '" '" """.. "''''''''''' 'Andrea "''''' .. "'" ""." , """" .. ... '"'''''''''''' "'"""."".. '" "" , "" ""....... ",,"" " ..... ",,"" ""'''''',,'''' " """" "'"
, . '" """" '" ........ '''''''' ,... "'" E~rkln9 ~'?!:p'I!,:y'gr,ou~.d..De~!g!1 ~.Qd con~!, "'" '" 9~0,~5Q" .I?X Leyy .'" " """ ""'" ",,"" J18!?,?,5.9., """. ."'"", '"'' ""''''' ". ". . . ."'" ,,,,,,.. """ " "".. "'""",,,. ... '" """ ,,,....., '"'''' ". .. " "" "" '" "'"'''''' "'''''''' "'''''''' .."'""""" ""'''''''' "'''''' ," '" ...,,,,,
,).?th ~.v~~,4!',Sp'o!!S ~,?mp'!,~~" , "" Ell!,se 2 ~.4!!~!~,g"and..f.:!n.al ,~lt~"y'yOrk ."', "" "" , 535,009 "Pa,(k,R~sery~"""" ". .."""''''",, " ....?3!?,q99., """'" .... ."", " , '" """" .... ""'" """''' ,,1>lark "" """"". ... .." '"'' "" ..... , "'" "'",. .. '"'''''' .. ""'" "" .. """ ""'",,.. ,,"""''' ..",..""" '" ",..' '" , "".....
Countryside Development Parks (3) DeSign and Construction 659,000 By Developer 659,000 Andrea
Construction Administration 16475 Park Reserve 16,475
'Southbridge'Area"Pa'ri{ Deveiopme'nt S'avanna 'oakS'park Developmeni-''''-' "''''''''' '147,000" Park ReserVe "''''' , , "'" "'" 147,600" '"'' .. '" "'" ..., '" '" ",,'" . ... "" """.... "''' 'Andrea' ""'" ,,,'" . ""'''''' ".... "m "" " """"" ... " " " ,. . """"""'" .......m"''''''. """"" .. '" " . ". ,,,,,,,,,,,,, """""".
Cambndge/Whltehall Trail Installation 84,920 Park Reserve 84,920
Southbndge Parkway Active Park Develop 289,800 Park Reserve 289,800 Future
FIshing Pier 20,000 Grants 20,000 Future
" .. ""m"m, '."""m..,,_ _..."m MND9T..?a~!..?~.!?,evelop.'!.!!'DL"", ,m '"'''' .?2.1.,~?g",E~(kRes.~fI!~"""", ""","" " " """"'" ."" , m "" ......'" '"'''' '''''''''' ". 52.!,,!!,!?!?, .. "" """ Futu.r~ """. '"'''' ..m"""""", """""",,,,,.. m"", "''''''' .... ..",,"', '"'' "'""".. mm",,""" " " ""
Dea.n L~~,~.:rf."'1 Sy'ste,rl)..m",,,,,,,,,, .. .... m "m D~sI9.11. ,!:~,d 9~~,~tf!Jgtlon """"""" , .m '"'''' .20.M,~~" ,E~,rk R.~s~'Y,~"""", .. , ''''','''' " "208,~~,!?,, . '" " '" "".. , '''''''''''' , ""'''''' """"""" A~drea, ""''' '"'' """ """"..., """'" " '"'''''''''' " "'''''''' """"'" .... .".. '" , ..m, " '" ... " , """ , , '"'' , "
Valley Creek Crossmg Park Development DeSign and Construction 120,000 By Developer 120,000 Andrea
'" m",,,,,,,, '" ." """," ...... . "'" 9?.Qstructlon b,~!:!]!.~!~tratlon""""""", ." """" ""'" ~,o~q "E~,ds.~.~s~.'Y~""""".." .. """,,"" '''''''' , 3,99,9." '" .... "" """". '" , " """"'" " """""" "," "'''' "".. ...""""',, ..... '"'''' '" .. m ""'" .""""" '" .."m"""... """" . ,,"'''''' _" _ ""," '" " """"".."
GlaCier Estates Neighborhood Park Dev DeSign and Construction 110,000 By Developer 110,000 Andrea Development recently approved
, '''''' . '" "''''''' " ... """",'" " ..... ." g~!}~tructlon bq!:!]!!}!~!,:a,!'On , " ""'''' . , """"""'" ~,750 P'~,ds,!3.~s~rv~"""""" """ ... . m ,,"" ",,,,,,,,,,,, 2,7?0" "" """" . "" """"" ""'''' "'" ""'" "'"'' , """ . """,," ..... .. '''''' '" .... . m """"" .. .. " '''' '"'' .. .. "" "" .. .""""""". ..... .. .... "" '" , ."',,'"
Of!-,L~~,~!:\.Dg~Area", """"",,,,,,,, """"" D,~~lgnan,~,,!?~ye!?p'!).~.Q! ""''' "" "'" '" ""...... 15,0,09" l?,'?~.atl,?ns"""""". ......m"""""""," ............1,~,!?9q" ..". """"'''' m",,,, .... """""" '''''''''''' .Andr~~""""",. ..""""""" m"", "" .., """ .... ""'''' ." """""".. ."""""" "''''''''''''' ..m",m' ",m""""",, "" "''''''
,Park,!?!g~,?~~ ". .. """""'''''''' "'''''''' l!1s~aIlPa~,,~!gn~ge ....... """" ."""", """... 7q,OQ9" E~.r!<.~e~~!.'!!,~ "".. ....."""""""" , ............. ,~~,999." .........35,9.0,9." '" m" .... '"'''''''' .. """'''''''''' .Andr~~"""", .. """"""'" "" '"'' ". """",.. ...'" ""'" .... """"" ",," '" . ... ""'""",,... '''''''''''''' """""".., """ """
,~rovld.~n~JY.Y.~~tch,~ster.E,~r!<,,!?!,veloprl),~!}t !?,~~Ign an.'!..g~~,~!fuc!'.on. "'''''''''' '" "''''''''''''' 938, 700, P'~,ds R~~efl!.e, '''''''' , ... . """ "" ",,, """"...... ,..", "" """" 938,7.9.,9." "'" """ """... ....." "''''' "., , " , "t\ndr~~ m"""" '" MqY~~,,!9 200?, """" "'''''' """" , '" "',,_..'" _m" , "" """" .", """"""" " """" ...... """," """ , "m , ""
,9.f.ee11~.eI~,!E~ds"Me~.dow~,~t,~~,ds,pev "" !?,~~lgnan~,9'?n,~!ructlon.. . ",,,,,,,,,,,,,..'" """"""'" 9~8,700" F:~,dsRe~fI!!',,,,,,,,, , '" ""'''' """'" ... .."""" """,..!l38,?.9.~"" . '" """".......".."'''' ......... "",,,Andr~~,,,,,,,,,,,, MOv~~,,!.9.,2007 '''''''' " """,,,.. ""","'".." '''''' ,,,,,,,,,..,,, .... '" """". .. """" .. "",,"""" "',,"'" '"
,t!9flz,?,~ 1j~\g,\)~~,Ear\< De\(~\?p'!:!]~!1.! "" !?,~~Ign an.~"g'?~,~!fuction.. " ,m"",,, ."..... . " """"'"'''' 21 0,0.09, E~!l< Re~erv.~",,,,, " '" '''''''' '" '" ."..., "m " """'" ..m" '" 210,Q.9.9, """" ... "'" ..... '" ""'" "Andr.e~""""" ,Futu.r.~""", ""'''' "" "'''''''' .. """,,,.. '" "" " ""'" ... "m "''' ,,,,,. ,m""'" m '" '" "'" " """".. '"
,!3!ve(~!,d~,~!,~,E,a~(Ea~\,l?,,~,!:~,,~?ke) ,!?,~slg~an.~go~,~t"!ction. ..." "m"""""".... '" '"'' ,,67.5,675, ~~(kRe~efl!.~ "'" ,,"'''' """".. ..."m, ""'''' 'm" "'" ... """"",!l75,~.?~" ,,,.. . '" "A~dr.e~.. "''''''' Futur,~""""" '"'' '" ..."""""" "'''''''''' .. '''''''''''' '"'' ...".....' """" 'm"""'''''' ",,""'"'' m",,""'"
,!9larT!~y'I;!,!!!~,E,~,c!!.l?,.evelop..':!l~~,L"", , !?,~~Ig~ ~~.d..9q~,~l[Uqtlon ...... """""""""".. , '" "'" ?~7,500. P~~ '3e~~ry.~" "'''' " , ,,,,,,,,,... .." "" "'"'' . ..."" "''''' , ... ... m" """" ".'" " "'" ,,' ;l67,50(!., !E:l!? ..." "'" Fytur,~""""", "" "" .. "..m""", '"'' ""'" ." "" '" .. "" "...." "" , .. ., "'" "" ." "''' ''''''''' " ,,,,,, "..
,EralQe ~1!!!:9,~, e~,rk"". . ."" """"" , h?nq ~0.JUIS~19D!.g'?~,struct!q~""m""""'" ". ""'''' '" ,?~.!,~.09. ,P'~,ds '3.e~~rv~"""", , ," ""''' ,,,,,,,,, " ,.... , """" '" ....". "" "'" , ."""""""";l5?,50q,, .T.~D """" ~uture """""".........""""" m ",,,,,,,,, , "''''' "'" """'''''' ..., , '" ,,,,,m
O'~?wd,,~~~e Par!<. 1'!)p.r.9.y.~,':!lents ... "" "'''' Desl911 '!:~~ ,g~~,~!,(UctloD _""" ,m", """ .1~?,'!.o,g" ,E!!rJ!. Re~,~!:'{~""".., .." " """","" ,," """" ,,,,m,,,,,,.. . ""'''''''''''' , , """'" ... ,:48?,.!.9~ TE:lq '" "" ~~,t!!.r.e. ..... "" "",. ." """" """""" , .. """",,,,.. .., ,," "'" " ","""'" """" " .. .m" '"'' ,. """" """
CR.79 I@.!I t? O'I?o~~"~,!!~,~,,eark . ...."""""" Des!9n a,nd 9'?~,~!,"!',C!!O~ """""" ." """'" , .25?,,~,Qq, ,E~,~.R.~s~,ry~"""",,,.. .., """",""" ,m" ""'" . "" "" ""'" ., '" """ '" '"'' , . 25?&9.!? IBD "" """.. , F~.!y.r.~ .. .,,'" "'" .. ""'''''''' .. ,..m", "''' .. "'"'''''' '" "..., . "",,,,,,,,,...,,, '" " .., """,," "'" " """ ""
?U~L q,~,'!:~D.e1 G~~e~~a'y' ~9,'!.!dor ,... ""m !?~~!,gn,and q9~,~!f.~,gt!.'?!1. '"'''''''' ... "''''''''''' 1,5?.500 ,E~,ds,R.~serv~"""""" ".., ....... "''''',,''' ""'" '" '" '" '" ., "" """. , "'" " " """ ,,,.. 152,,?,,9.!? IBD.. """"""'" fY,!~.r.~"" .'" """ .., . '''' "" "" . , .. , """"... '''''''' " "" ..... """""""" ""''' , .. ""'",''''''' """"".
,~!:\4trop'"E~rK, pey'~loe'!!~!1,t"""", . ,m" R~~!,gn and ~~~,~!f.~'?!!?~" '''''''' """"""",,52~,000 E~,ds,R,~se!"e"""""" """" ...... """""" "",,,m '" " "",,,m '"'' """'" , "" ""'" ..", '" ,,525,Q,9.!?, IBD.. "''''''''''''' Fu.!y.r.~"", .. """ """ "'" '"'' " m "" "". "" "" , """""." , """""'" 'm"""" .. '"'''' ""'" ...._,,'" '"
,!3!yervle~p~,ds,parkmg~.9.t "''''',''' """ i;'~dsmgLot9?~,~!!}I9!!~n.. ,,,,,,,,.,, '''''''''''''' 78,750 P.!!ds,!3,~sefl!e""""" """.. ... .."""" """"'" """ """"".. ."""", "'''''' "'''' ,,_ _, m. ... 78,?~9"..:rBD.. """"""'" Fu!<!.r~""" ,,,,,,,. m",,,,,,,, """",,,.,, "''' . m""""... .".. "'''''''''' ,,""'''' .." ,,"" '" "",,,,
,g9mm~nJ!Y.E~!:!<SP2rtsCofl)P'!,~~"", m !?~~lgnan~..9?~.~!f.!!~t!9l)... """"""....... m """,!,qso,Ooq P!',ds,R~~efl!e "'" """ ..... """""'"'' .... ,,,,,,,,,,,.. .. ."" '"'' """""""...... '"'' ..1.,q~.O,qqo, ..J~I?" ......""", Futur~""""", """"" ,'.m"""" m""""",' """'" ...."m"'''', '" ... '" .." ""'"'' """""" "",,,...
,~l1)all !ml?r,?y,~,'!!.ent,f.'roleg!s ",,"""" ~,'?!1~\()Jct\2n "'" "" """. """"""""".... """" !qo,ooo Pa,~,Re~efl!.~ "" """ , , '" """""" ,?Q,q9q """"""20,0.00,, """ 20,0.0.0 """""" ,?O,qqq "'" ".. ,?O,O,oq ..JB,'?" .. '" '''''''' Add~.q,!.9!,~9.~ng p~~, r~~9m!:!]~D~~!'on . m,,, "'" " .. .. """""".... ... "'''' .. .., """''' .. '" "" .. '''''''' ",," "...
.!.9.th ,~Sp.e~,9.~.r, f.'a,~ De~.elop~,~!}~ , !?,~~,',g,~ ~!}~. CO~,~t"!'9~o~"" .... .." """""""," . """ ,," Pa~ ~e~.~'Y.e , ,,,,,, , "'" """" "" '"'''' ... D~I,~~~<! ,!3~co!!.'!fl,~,~d~tIO~..!9 ,~.elll?arceL."""", , "'" '"'' "... .. "''' "" ,,,""'" "''''' , .m" "",' ,.. '" '''' , , '" ,
Mou~d~,9.,!3,,?~Park.Dev~!gem!,~.!.. , .."" qeslg~a,~~,q~~,~t(Uctlon ,"""""""'" ." '''''''' ..... "."", p'!,(k,Re~.~rv,~"""", ""'," ." ,,"""''' ",. ""'" .."""""""" """".., ""'''''''''''' D,~I~~~<! ~~D2.!fl"),~,~d,ati,?~,!?,~elll?a.r.oe!.."""" .. """'" , "''''''' ,.._", .. """ ....m""""".. ''''''','' ""
Small Tra,!!.f.'f.91!'9ts .. ",,,,,,,,,,, .. . '" C011~!(!,lg!'on """""'"'' """''''' , , ." ""m "" "".. .... m .p'~~,Res~rv~""""" " "..."", _ _m"'" , '"'' , "",.. ." . ""'" "'"'' "".. ,.." "'" ,,," , "" '" "D,~)~\~!!., "" .... " '"'''' ,,,. ... , ""'" ""'" ... '" ""'" '" . , "" " " '" '"'''' ," """,,,,,,,,. .. "",,, .. ... '"'''' "" ""'"''''''''
Interfund Loan Pa back Fmancln 1 000,000 Park Reserve 500,000 500,000
20643930 1,106,000 5,960185 2,621 320 2303,800 1 769675 4403700
Revenue 7/31/2005 1..Jan 1-Jan 1..Jan 1..Jan 1-Jan
Balance 711,798 2,143,798 251,813 160,493 66,693 -202,982
'Parkqed!catloriFees ".., " """,," , "":'::". "m",= :"''' "" ,:"",:,:"':,:"::'::::::'::::,,:,:: ,:::"'::'"'''' "" : """'"'' """",:::,"'''''''' ,,::::"" '" '$'''':'::':,?,QQ,ii9Q'' :r:)09,:g:9:(j': "$' '~90"q90' ''$':jq"q:"QQP''$ ::}~9"OOO'" .",,::,..,:::::::':'" ~f.~ieCied:r~~~!,ue'~;'~!~:f.~ujre'parKq~~!:~iionll".9..m':)Q~lots~t,;?.9.0~.~e.dl9!~gf.i:~eer~!~:,,:,'" " .:.." :::::::: :::" ,:'::::::". ""
"''''''''''' '" "" ~!y.!'r.vall~y'.Esta,1~s ,,'" .m", ,,""" m""""""""" "", ""'" 4?6,qq9, "'" .'" "'''''' 4??,.9~0, '''' ",""" " """'"" . """""""'" "''''""",. """"""'''' ..".. "" F!!1!!,I,l?lat~p.I?r.o~ed..R~v~!1~.ef.e9U1re.dp.!1,9r,to,recordl~1l" """...... . ,,""'"'''' ",,'" '"'''''' ., """ ... '"
,," """""""".., ... """'''' ,C'?,4nt!Y.~!~~ ,," .... ...m"",,,""'" '" ,,"""""'" , " ...' """'" 3~0,9..9.9""" ...."""""", 39q"qqq " ,,"'''' " ,,'" '"'' ."""""",,,,, ,,,"',,,,,,,.. "'""""'",,. "" "'" .. ~!!}~,\p'!atap.p.r.9.~a!eJP.~c!~q,~?on ~~v~nY,~r~94!re.9p.!19rtorec,9.f.~!.~g ... """"""... ",,"" ."m",," ..."'" '" '"
", "''''' """".." ." """ Shutrqp'. N'?f.lt:1 , ..... "'''''''''''''''' """""" , """" ,,?OQ,.9Q9, """" ..., """"" , 20,0,.9.9,9" , ,,'"'''''' ". """ ... '.m"".." , ",,,m "'" ,,,.. "''''''' "" ... "'" ,,,.., , F!!}~,\ p'!at exp..~.o.te~ \>ef.9.re, e!:"!..~f y.~.e( Rev~D!!.!' regulr,~!!.l?nor t'?f.!',~.rdlng ." '" """"" . ",,'" .. ",,' '"'' """ ,
".. m.." ..,_ '" '" '" " "",~lscella~~'?,4~" ".", '" """""""" " """ .. "''''''''' ",SQ,Oq<l"",,, """ .. """"""" '" . 50,9.!?9"", " ""'" ".,,, """ ......". """ .m"",,,,,,,,,... "''''''''' "''''''''''''' .~!~,g~ll,aneous .r.e'!)~lnI~g f".!,rT'!)!~L",.. '"'''''''''' ." "'",,,.. .""", .... '''''''''' . ."", '" .'" '" ""'" "" "" ....
"""". "'''''' "'" "".., .. ..... ,,\!.!!,,~ln9 E~\a\~.~ '" '''''' , ,,""'''''''' "" ". "" " " , """""",220,000 """"""",'" . """"""" "".. .~.?,o,q.9.9", ""'" "" '" " ....' '" """'" m """ """ ., "'" "" ., "'''''' " """""".. N~~,9.,\dP Rey,~~Y,~ r~9.U1r!,~,p'Q9.r to first .!?,4!!~1~9 perf!1lt", "".... ".., "" ... .... ""''''' ... "," " .""", "", ,,,,,,,,,,,..'"
'" " "m,,, '" , "'prol?,?,~!"d,,~,!!!.e of Par~!,~ " """ ",,""""'''' "..".. """"'" , ..." """""'~OO,OOO """""""... """"" ...".. . """",," """ 1q9"9,9,o,, '"'' "" """ """... "" ".", "'"""",,m .. .." ""'"'' .. """"'" "'''''''''' '''''' . .. """"'" m" """ """""" """"... """''' ,.., ,,,... """"" """,,'"
,g,'3 21 '3!1l~!:,'?!.:w.~Y. ... ""''','''' ., """" , ." "'" " ""'"'' """"""""".. , ""''''' ?1?0,000 """"" "'" """ """" ?,5.o,099" '"'''''''''' , , ""'" '"'' ... '" '"'' "" , """'" ..." "'" "".. ""'''' ... """""" Awal,t!~,g,,?ffer for ~.9.I(I!, '" m"", '" '" "... , "'''' "" .. "" "" , ,...."",,, ......m"" "" '" ""'" ... ,,,,, "" ..
Grants 237,000 280,000 1 270,000 280,000 280,000
Tax !~Y.i.:::,", :": ,:,,:':::::,"" "":..., :,,:::..::' ,::'" '" "':::::::':::,.. ':::::::,:::",:,...:...:: ',,:::::: ',:::: ":" : ::,::::: '" :::,::'::::::: .., ,:::':":..' '-:--:::::?~q:?~o" :.:..,:::' ::::':::::::: ",,: :':'::,:, "::'",:',::::,:... ":"',::::" '" ...".::::'::::::'::" ,',::: "".. .... ...:,:,:': "..: ..'::::: ':' .::,,:::::,:: ,: . ,:'" ,:::'"'' :,::,:::,,:..... '.. ':,,:::::::::::::::,.. ::,:::::: ..::::::: :: " ... , ,,::,:: ..:::,:::
Assessments 198,500
Xcel ~~i.~~rri~~!, ::: ,:":::::::,,' ," :'. ".m:,::::',:: ::..:::"::'::: ::':::::,,""" "..::::::::::::, " :::': ,:::::::" ... :..:,::::::: ::::,:, ':'::':"::::::,,'" : "" ':':, "" 44~:9Q:Q:: 44Q:iiQ'( ~~Q:g:QQ:, 4~Q,:Q06"" 440;:9,0( ..:'::':":::,,:,:, "..: ,L~ill~lature '~p.p.i.oy'ed '.: ",::::, ::, ,:" .:. :: ",:':'::::::":" '" ::::... ,::.. .:.::':':::::::::" ',::::::::::,:,::'::::' ::.:::::::, ":::':,:, '::: " "::::::::::. ':::::
Donations 302,000 723,450 310,000 280,000 280,000
'p'a.iL<:s'biiy'~[!?p'~~:,b'y'~~y'~'1~p'~.r~ ...."::':::::: "'"""...... '::::,::::::::':::"..... :::,::::,: '::: ":::::= ':':::"'''::::::::,::,::,:. ':"::':::::::::::::,,'" ?:Q:9,9.9,g:::::"" 88~ii.Q'ii::" ""::::",,:':: ,:::"....:"::':::"::::::, ,,,. ":::::::,," ..::':':::::::::: " ...:::::',::::: :.. :"':::::::::,,:, "::' :::, ,::'::::-- '":,:::::::':".. :':::":::::',,, ': ,:':::'", : :"::,::::::::,: .:: "::::,::....' :::',:':', . ::'::::,:":, ':,
Interfund Loan 1 000,000
Total Revenue 3249798 6211,998 2781 813 2370493 1,566,693 1297018
Park Reserve Fund Expenditures 604,000 2,933,360 2,031,320 1,033,800 1,209,675 3,843,700
Total Ex endltures 1 106000 5960185 2621 320 2,303,800 1 769675 4403,700
12/31 Ending Balance 2,143,798 251,813 160,493 66,693 .202,982 -3,1a6,682