Loading...
HomeMy WebLinkAbout15.A.3. Greenfield West Playground Equipment CITY OF SHAKOPEE IS: IJ. 3:- MEMORANDUM To: Mayor and City Council CONSENT Mark McNeill, City Administrator From: Andrea Weber, Park and Landscape Designer Date: June 21, 2005 Subject: Greenfield West Playground Equipment INTRODUCTION The City Council is being asked to approve the purchase the playground Equipment for Greenfiield West Neighborhood Park. BACKGROUND There was $100,000.00 allocated in the Greenfiield West Neighborhood Park budget for playground equipment in three separate play areas. The play features were intended to serve all ages, but the largest area was planned for 5-12 year old children ($50,000.00). There is also a 2-5 year old area with a linked sand play area ($20,000.00), and a challenge play and fitness area (30,000.00). The play equipment quotes were chosen at the third neighborhood meeting held on January 20, 2005, and recommended by the Parks and Recreation Advisory Board in February. The quotes were selected from a total of six proposals for each area. Each play area will have equipment from a different vendor. I have contacted the representatives to confirm that they will still honor their original quotes, all of which have expired. I also informed them that my current estimate for installation, (which is not confirmed by the contractor), is in late August. All of the representatives have confirmed that they will still honor their quotes. I have requested two changes to the original quotes. One change is that the original shade structure that was proposed for the sand play area was changed to a different style of structure at the request of staff for maintenance and durability reasons. The replacement is included in the confirmed quote. A second change is that I have removed benches from within the play equipment quotes and added rubber wear mats under slide exits to reduce maintenance to the wood fiber surface. I chose to remove the benches so that I could have a single bench style throughout the entire park site. Benches are accounted for in the overall park construction bid which was approved by the City Council on June tho All of the play areas are within budget REQUESTED ACTION If City Council concurs, it should by motion authorize the purchase of the following playground equipment: 1. Play equipment from Midwest Recreation for the 2-5 age and Sand Play areas for a total of $18,231.78. . 2. Play Equipment from Webber Recreation for the 5-12 age play area for a total of $49,944,94. 3. Play equipment from Flanagan Sales for the fitness and challenge play area for a total of $30,000.00. Greenfield Park Design Playground 5-12: Webber (Preferred Design) Greenfield West Park Shokopee, MN