TO: Mayor & City Council
Mark McNeill, City Administrator
FROM: Bruce Loney, Public Works Director
SUBJECT: Valley View Road, from the East Plat Line of
Greenfield Addition to C.R. 83, Project No. 2004-3
DATE: March 16, 2004
INTRODUCTION:
Attached is Resolution No. 6025, a resolution receiving a report and calling for a hearing
on Valley View Road, from the east plat line of Greenfield Addition to C.R. 83, Project
No. 2004-3.
BACKGROUND:
On December 16,2003, the City Council ordered the preparation ofa feasibility report to
analyze the construction of Valley View Road, from the east plat line of Greenfield
Addition to C.R. 83 and for Tahpah Park improvements. This report has been completed
and is attached for Council review.
The purpose of the feasibility report is to evaluate the existing infrastructure (streets,
utilities, drainage) and make recommendations for any improvements that are needed.
The feasibility report also addresses the estimated costs for the improvements and the
proposed assessments that result from the project being constructed.
The attached resolution sets a date for the public hearing for this project for April 20
2004. The approval of Resolution No. 6025 does not order the project nor does it commit
the Council to constructing any improvements. The intent of this resolution is to accept
the feasibility report and set the public hearing date. The public hearing will allow the
property owners adjacent to the project area and the general public the opportunity to
address the City Council on this project.
Staff will make a full presentation at the April 20, 2004 public hearing on the feasibility
report to the public and the City Council.
With the Valley View Road feasibility report, staff is proposing to continue to construct a
44-foot wide urban roadway similar to previous Valley View Road Projects. The local
street equivalent will be assessed to benefiting property owners and the City paying for
oversizing of Valley View Road, as this roadway is a City collector. Also included in the
project is to construct a right turn lane and bypass lane on C.R. 83 for safety and to meet
County requirements. Scott County may be able to participate in this cost as a safety
improvement project.
It is also being proposed to not construct the bituminous trail or concrete sidewalk where
there is insufficient right-of-way. The City has approved Park Meadows to the east of
Greenfield and a bituminous trail would be included as there is sufficient right-of-way
along Park Meadows. Other segments of the trail and concrete sidewalk would be
constructed upon development ofthese properties.
Staff believes this approach would be best to facilitate the construction of Valley View
Road this year and minimize the City's cost in right-of-way acquisition.
If the City Council desires to have the trail and sidewalk completed to C.R. 83, it is
unlikely that this project can be completed this year due to right-of-way acquisition. The
main purpose of this project is to complete a paved collector street route to c.R. 83 to
serve a large residential area with another route to T.H. 169.
Staff also has reviewed the improvements to Tahpah Park, which included the
reconstruction of existing parking lot, replacing existing play equipment and new parking
lot area. The Park and Recreation Department has concluded that an overall master plan
should be prepared before proceeding ahead with a construction project. Developing a
master plan could take over a year and staff has concluded that it is best to not include
Tahpah Park improvements with the Valley View Road improvement project. Future
Tahpah Park improvements can be included with another 429 assessment project for
funding using City bonding.
ALTERNATIVES:
1. Adopt Resolution No. 6025. This action will receive the feasibility report and set
the date for the public hearing for April 20, 2004.
2. Deny Resolution No. 6025. This action will halt the project until such time that
City Council reconsiders the resolution.
3. Move to receive the feasibility report but do not set a date for the public hearing at
this time. This action will place the project on hold until such time as the City
Council sets a date for the public hearing.
4. Table Resolution No. 6025 to allow time for staff to prepare additional
information andlor revise the feasibility report as directed by the City Council.
RECOMMENDATION:
1. Staffwould recommend Alternative No.1, to adopt Resolution No. 6025 in order
to possibly construct Valley View Road to c.R. 83 this year.
ACTION REQUESTED:
Offer Resolution No. 6025, A Resolution Receiving a Report and Calling a Hearing for
Valley View Road, from the East Plat Line of Greenfield Addition to County Road 83,
Project No. 2004-3, and move its adoption.
bfro
Public Works D ector
BU""",
ENGRflOO4PROJEC1'NALLEYVIEWRDIWORD/MEM6Q25
RESOLUTION NO. 6025
A Resolution Receiving A Report
And Calling A Hearing
For Improvements To Valley View Road,
From The East Plat Line Of Greenfield Addition
To County Road 83
Project No. 2004-3
WHEREAS, pursuant to Resolution No. 5994. of the City Council adopted December 16,
2003, a report has been prepared by the City Engineer, with reference to Valley View Road, from
the east plat line of Greenfield Addition to County Road 83, Project No. 2004-3 and this report was
received by the Council on March 16, 2004.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF SHAKOPEE, MINNESOTA:
1. The Council will consider the construction of Valley View Road, from the east plat line
of Greenfield Addition to County Road 83, and all appurtenant work in accordance with the report
and the assessment of abutting and benefited property for all or a portion of the cost of the
improvements pursuant to Minnesota Statutes Chapter 429 at an estimated total cost of the
improvement of $840,363.00.
2. A public hearing shall be held on such proposed improvements on the 20th day of April,
2004, at 7:00 P.M. or thereafter, in the Council Chambers of City Hall, at 129 South Holmes Street,
Shakopee, Minnesota, and the Clerk shall give mailed and published notice of such hearing and
improvement as required by law.
3. The work of this project is hereby designated as part ofthe 2004-3 Public hnprovement
Project.
Adopted in session of the City Council of the City of Shako pee,
Minnesota, held this day of ,2004.
Mayor of the City of Shakopee
ATTEST:
City Clerk
ENGRl2004PROJECT/20040VERLA Y IHOLMESlRES6021
I~
. ~
l March 2004
[I
Feasibility Report
'I SHAKOPEE
I
II COMMUNITY PRIDE SINC"E 1857
I
I
II I
Valley View Road Improvements I
:.
Greenfield Addition - East Plat Line I
II East to I
County Road 83 I
I
II I
:. Street, Utilities and Appurtenant Work I
I
II I
I
I
II I
II I
I
\
II I
I
II
I
:.
I
I
'I
I
I I
I I
I
I
I
I
I FEASIBILITY REPORT
I
v ALLEY VIEW ROAD IMPROVEMENTS
I FROM
I GREENFIELD ADDITION - EAST PLAT LINE
I EAST TO
I COUNTY ROAD 83
I
I STREET, UTILITIES AND APPURTENANT WORK
I City Project Number 2004~3
I
I MARCH, 2004
I
I Prepared By:
I City of Shakopee / Engineering Department
129 Holmes Street South
I Shakopee, Minnesota 55379
(952) 233-3800
I (952) 233-3803 (Fax)
I Feasibility Report
Valley View Road Improl'eme/lts
I City of Shako pee, MN
I
I FEASIBILITY REPORT
I FOR
I V ALLEY VIEW ROAD IMPROVEMENTS
From
I GREENFIELD ADDITION - EAST PLAT LINE
East To
I COUNTY ROAD 83
I SHAKOPEE,MINNESOTA
I
I
I
I
I
I I hereby certify that this plan, specification, or report was prepared by
me or under my direct supervision and that I am a duly registered
I Professional Engineer under the laws of the State of Minnesota.
I ~..LJ~
I Date 3/}j loy Registration No. 41342.
, ./
I
I Feasibility Report
Valley View Road Improveme/lts
City ofS/rakopee, MN
I
I
I TABLE OF CONTENTS
I TITLE SHEET
CERTIFICATION SHEET
I TABLE OF CONTENTS
Descrivtion Page No.
I 1. Introduction ............... ............................................................................................................ 1
2. S cope .............................. ......................... ................................... ....................................................... ......... 1
3. B a ckgro un d ............................................ ......................... ............................................................... ....... 1
I 4. Existing conditions .......... ............................................................................ ................................. 1
. Ro a d way .................................................. ....................................................................................... 1
I . S ani tary Sewer .................................................................................................. ............ 2
. W a t er -main........................................... .................................... 2
. S to rmS ewer................. ......... ................ ..................... ............ ... 2
I . Right -0 f - Way........... .................. ....... ............... .......... ....... ........ 2
5. Pro posed Improvement .......................... .......... ... ................ ......... 3
I . Ro a d way .............. ...................................................................... 3
. S ani tary Sew er ~......... ................. ~.. ....................... ......... ........... 3
I . W ater- Main. ..'.......................... ................ ...~................~~............. 4
. Sto rro Sewer ............................... ....................... .... ......... .~. ......... 4
. Right -0 f- Way..... .... .................. ...... ................................ ........... 5
I 6. Special. Ass essm en ts .. .... ...................................... ... ... ................ .... 5
. Street Po rti 0 n............................................................................ 5
I . Sanitary Sewer ... ......... .... .................. ...... .... ............ ................. 5
. W a ter- Main .......... ..... ........ ........ .... ....... ... ........ ..... ..... ... ............ 5
I . Sto rro Sewer ....... ... ........ ..... ............ ............. ......... ... ... ... ............ 5
. S tr eetL i g h ts.............................................................................. 6
7. Estimated Costs ........ ...... ...... .......... ...... .... ...... ... ......................... ... 6
I 8. Funding So urc.e ......... ~.. ...... ..... ........ ............ it. ......... .......... .... .......... ... 6
9. Co Del usi 0 n. ... ..... ...... ........ ...... .....-............ ........ .... .................. .... .......... 7
I
I Appendix
Preliminary Cost Estimate
Preliminary Assessment Roll
I Project Maps
I Feasibility Report
Valley View Road Improveme/lts
lu City of S"akopee, MN
I
I 1. Introduction
I On December 16, 2003, the City of Shakopee ordered the preparation of a feasibility
report to analyze the construction of V alley View Road from the east plat line ofthe
Greenfield Addition to County Road 83 by Resolution No. 5994. This project is included
I in the City's2004 ClP. Originally, this report was also going to analyze the feasibility of
rehabilitating the parking lot at Tahpah Park. The parking lot is approximately 28 years
old. The current maintenance costs for the parking lot are low, therefore, the existing
I surface could be sufficient for up to 5 more years. There are a number of options
available for reconstructing the parking lot including adding curb, expanding the parking
lot, realigning the parking lot or just resurfacing the existing bituminous. After
I consulting with park staff, we recommend studying the parking lot as part of an overall
park plan. The reconstruction ofthe parking lot could be bonded with a future City
project.
I 2. Scope
I This report addresses the anticipated project costs and feasibility of continuing the
construction of V alley View Road to the east as a paved roadway with curb and gutter,
I bituminous trail and storm sewer.
I 3. Background
The Valley View Road project is a City Council initiated project. As development occurs
I in the area, traffic volumes on Valley View Road have and will continue to increase. City
Council has directed staffto consider constructing improvements on Valley View Road,
from the east plat line of the Greenfield Addition to County Road 83.
I 4. Existing Conditions
I . Roadway
I Valley View Road is currently a 3D-foot wide gravel roadway with ditches and
culvert crossings providing storm water drainage. It is currently classified as local
I rural road, but has a proposed designation as an urban collector road. There is an
existing overhead electric power line that is located along Valley View Road
approximately 18 feet south of the north right-of-way line.
I
I
I ';~ .,-,..' .,
Feasibility Report Page 1
Valley View Road Improvements
I City of Shako pee, II1N
- .~"....-
I
I . Sanitary Sewer
I There is currently no sanitary sewer located within existing Valley View Road.
Service to the Greenfield Addition is provided internally from the north. It is
planned that development south of Valley View Road will be served with internal
I streets.and utilities; thereby eliminating the need to extend sanitary sewer service
along Valley View Road. As part ofthe Greenfield Addition, an 8-inch sanitary
I, sewer was installed to the intersection of Independence Drive and Valley View
Road for future extension to serve undeveloped property to the south. There is
sanitary sewer stubbed to the east boundary of the Greenfield Addition which can
I be extended south to Valley View Road through the adjoining property as well.
Watermain
.
I An existing 12-inch DIP watermain is located in Valley View Road from the west
to the intersection of Independence Drive. From this intersection, the watermain
I extends diagonally to the northeast between Lots 12 and 13, Block 8, ofthe
Greenfield Addition Plat to connect into a 12-inch main at Molina Street. An 8-
inch DIP watermain extends to the south between Lots 11 and 12, Block 3, ofthe
I Greenfield Addition Plat from Elsberry Curve to Valley View Road and between
Lots 20 and 21, Block 8, from Molina Street to Valley View Road.
I . Storm Sewer
I The existing drainage facilities consist of road ditches.
. Right-or-Way
I
The existing right-of-way for Valley View Road from the east plat line of the
I Greenfield Addition to Country Road 83 is 66-feet wide. A preliminary plat for
Park Meadows located east of the Greenfield Addition has been approved by the
City with conditions. The Park Meadows Plat extends approximately 1328-feet
I east of the Greenfield Addition and is shown in Drawin~ Number 2 in the
Appendix. The Park Meadows Plat would dedicate an additional 17-feet of right-
of-way along Valley View Road, giving the City a total right-of-way width of 83-
I feet adjacent to the Park Meadows Plat.
I
I
I Feasibility Report Page 2
Valley View Road Improvemellts
City ofSI/(/kopee, MN
I
I
I
5. Proposed Improvements
I
. Roadway
I
The proposed street improvements are identified in Drawing Number 3 in the
I Appendix. Valley View Road is proposed to be constructed to a 9-ton design, 44-
foot wide undivided urban roadway with parking allowed on both sides. The lane
widths are proposed to be two 12-foot wide drive lanes and two 10-foot wide
I parking lanes.
As part of this feasibility study, the oversizing cost of constructing a 44- foot wide
I street, 9-ton design, as compared to the residential required 36-foot wide street, 7-
ton design, was evaluated. The comparative increased cost to be borne by the City
of Shakopee is shown in the Appendix.
I Typically, the City would construct a trail on the north side of the road and a
I sidewalk on the south side of the road. However, only the trail on the north side
of the road adjacent to the Park Meadows Plat can be constructed at this time
without the City purchasing additional right-of-way. Therefore, the sidewalk and
I remaining trail section will be constructed by developers as property adjacent to
Valley View Road develops and additional right-of-way is dedicated to the City.
I Due to the upgrade of V alley View Road, the County will require construction of
a bypass lane and right turn lane on C.R. 83 as part ofthe street improvements.
City staffwill discuss possible cost sharing for the County road improvements
I with Scott County.
The alignment currently places the north curb line between 10 feet and 12~ feet
I from the existing overhead power lines (poles). The existing overhead power
lines adjacent to the Park Meadows Plat is assumed to be relocated underground,
pending Council approval similar to the previous Valley View Road project. The
I remaining power lines will remain overhead until future development occurs
along Valley View Road.
I An itemized cost estimate of the proposed street improvements is included in the
Appendix.
I . Sanitary Sewer
I The proposed sanitary sewer improvements are identified in Drawing Number 3 in
the Appendix.
I Feasibility Report Page 3
Valley View Road Improvemel/ts
City ofSlzakopee, lI'1N
I
I
I The proposed sanitary sewer improvements consist of extending sanitary sewer
south across Valley View Road at the future intersection identified in the Park
I Meadows Preliminary Plat.
Currently the properties on the south side of Valley View Road are outside the
I MUSA boundary. .City staff recommends that this area be placed within the
MUSA when the Metropolitan Council approves the City's comprehensive plan.
If these properties are not placed into the MUS A, City staff recommends that
I those parcels still be assessed for sanitary sewer, with those sewer assessments
being deferred until such time that they are placed within the MUSA.
I The total estimated project cost for the sanitary sewer improvements is
$11,000.00. An itemized cost estimate is included in the Appendix.
I . Watermain
I The proposed watermain improvements are identified in Drawing Number 3 in the
Appendix.
I The proposed watermain improvements consist of extending a 12-inch water main
and a 8-inch water main from Park Meadows south to Valley View Road. Two
I additiona18-inch crossings will be made under Valley View Road between
between Park Meadows and C.R. 83. 'These crossings will be capped until
development adj acent to Valley View Road occurs and these crossings can be
I utilized to complete looping in the area.
The total estimated project cost for the watermain improvements is $24,475.00.
I An itemized cost estimate is included in the Appendix.
Storm Sewer
.
I Storm sewer will be required to provide storm water drainage for the area within
the Valley View Road right-of-way. Storm sewer stubs will be extended south
I from the Park Meadows Addition to collect a portion of the waterfrom Valley
View Road. The pond proposed to be constructed as part of the Park Meadows
I Addition has been sized to accommodate the runoff from Valley View Road. The
remaining section of Valley View Road will continue to drain to the ditch located
on the west side ofC.R. 83. All costs associated with the proposed drainage
I improvements will be assessed to the benefiting properties.
Thetotal estimated project cost for the stonn sewer improvements is $67,788.00.
I An itemized cost estimate is included in the Appendix.
I Feasibility Report Page 4
Valley View Road Improvemellts
I City of Shako pee, JlfN
I
I . Right-of-Way Acquisition
I The City is not anticipating the need for any permanent easement acquisition as
part of this project. The sidewalk and trail will not be constructed, at this time, in
I any area requiring additional right-of-way or construction easements. As the City
moves into the design phase, it may be necessary to secure some small
construction easements. The total estimated costs for potential construction
I easements is $10,000.00.
I 6. Special Assessments
A preliminary assessment roll is included in the Appendix.
I . Street Improvements
I The cost associated with the proposed street improvements for a local road
equivalent (36-foot F-F) will be assessed to the benefiting properties on a front
I footage basis. The proposed improvements to C.R. 83 and the increased cost to
expand to a 44-foot wide 9-ton design will be paid by the City. The bituminous
trail will be assessed to the Park Meadows Plat.
I . Sanitary Sewer
I The costs associated with the proposed sanitary sewer improvements will be
assessed to the benefiting properties on an area basis.
I . Watermain
I The costs associated with the proposed watermain improvements will be assessed
to the benefiting properties on an area basis with Shakopee Public Utilities paying
oversizing costs associated with the 12-inch watennain.
I .. Storm Sewer
I The costs associated with the proposed storm sewer improvements will be
assessed to the benefiting properties on a front footage basis.
I
I
I Feasibility Report Page 5
Valley View Road Improvemellts
City of Slrakopee, MN
I
I
1 . Street Lights
I The cost participation with the proposed street lights is 50% assessed to the
benefiting properties on a front footage basis and 50% to the City of Shakopee.
I 7. Estimated Cost
I An itemized cost estimate is included in the Appendix.
The following costs were prepared using 2003 construction costs and are subject to
I change, depending on the final design ofthe project, bids received, and actual work
performed. A summary of the estimated construction costs plus 10% contingency and
25% engineering and administration costs for the project are as follows:
I Street Improvements (Including Easements) $555,875.00
I County Road 83 Improvements $ 93,500.00
Trail Improvements $ 19,250.00
I Sanitary Sewer Improvements $ 11,000.00
I Watermain Improvements $ 24,475.00
I Storm Sewer Improvements $ 67,788.00
Street Light Improvements $68,475.00
I Estimated Project Cost $840,363.00
I 8. Funding Sources
I A summary oftheproposedcost apportionment is asfollows:
Assessments $634,960.50
I Shakopee Public Utilities Oversizing $ 2,590.00
I City Costs $202,812.50
I Total Funding $840,363.00
I Feasibility Report Page 6
Valley View Road Improvements
CityofSlllIkopee, MN
I
~;.;"",_._;.~.'_~_",--:.r'_'.,..._.,~,,",_",
I
I 9. Conclusion
I From an engineering stand point the proposed improvements are feasible, cost effective,
and necessary.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I Feasibility Report Page 7
Valley View Road Improvements
City of Sltakopee, M N
I
I
I
I
I
I APPENDIX
I
I
I
I Preliminary Cost Estimates
I Preliminary 'Assessment Roll
Project Maps
I
I
I
I
I
I
I
- Feasibility Report
Valley View Road Improvements
City of Shako pee, MN
E
I Preliminary Cost Estimate
I Valley View Road Improvements
City of Shakopee
I Street Improvements (44 Foot)
Item # Description Units Quantity Unit Price Total..
I 1 Mobilization LS 1 $ 18,770.DO -$ 18,77.D..DD
2 Remove Curb and Gutter LF 10 $ 6.50 $ 65.00
I 3 Remove Bituminous Pavement SY 28 $ 1.50 $ 42.00
4 Sawing Bituminous Pavement (Full-Depth) LF 42 $ 4.00 $ 168.00
I 5 Common Excavation CY 10400 $ 7.00 $ 72,800.00
6 Subgrade Excavation CY 2720 $ 6.00 $ 16,320.00
I 7 Select Granular Borrow (CV) CY 2720 $ 5.25 $ 14,280.00
8 Aggregate Base Class-5 (100% Crushed Limestone) SY 13500 $ 6.00 $ 81,000.00
I 9 Bituminous Wear Course 1.5" Thick SY 13000 $ 3.50 $ 45,500.00
10 Bituminous Non-Wear Course 3" Thick SY 13000 $ 5.00 $ 65,000.00
I 11 Bituminous Material for Tack Coat GAL 630 $ 3.50 $ 2,205.00
12 Concrete Curb & Gutter Design 8618 LF 5400 $ . 8.50 $ 45,900.00
,
I 13 Salvage and Reinstall Mailbox EA 2 $ 100;00 ,$ 2"DROO
,
14 Traffic Control LS 1 $ 1,500.00 $ 1,500.00
I 15 4" Solid Line White-Epoxy LF 5350 $ 0.40 $ 2,140.00
16 4" Double Solid Line Yellow-Epoxy LF 2675 $ 0.60 $ 1,605.00
I 17 Deciduous Tree 2" Cal. B & B EA 5 $ 250.00 $ 1,250.00
18 Deciduous Tree 2.5" Cal. B & B EA 13 $ 300.00 $ 3,900.00
19 Deciduous Tree 3" Cal. B & B EA 8 $ 350.00 $ 2,800.00
I 20 Silt-Fence, Type Machine Sliced LF 800 $ 2.80 $ 2,240.00
21 Seeding ACRE 2.2 $ 1,500.00 $ 3,300.00
I ,
, ,
22 Sodding Type Lawn , SY 3825 $ 3.00 $ 11,475.00
"
23 Barricades, Type III EA 9 $ 315.00 $ 2,835.00
I 24 F & I Sign Panel Type C EA 11 $ 155.00 $ 1,705.00
Subtotal $ 397 ;~OO.OO
I +10% Contingency $ 39,700.00
Subtotal $ 436,700.00
I +25% Indirect Costs $ 109,175.00
Temporary Construction Easements $ 10,000.00
I "",. (' "',," , Total $
, 555,875.00
I Feasibility Report
Valley View Road Improvements
, c City of Shakopee, MN
I Preliminary Cost Estimate
I Valley View Road Improvements
City of Shakopee
I Street Improvements (36 Foot)
Item # Description Units Quantity Unit Price Total
I 1 Mobilization LS 1 $ 16,265.130 $ 16,265:00
2 Remove Curb and Gutter LF 10 $ 6.50 $ 65.00
I 3 Remove Bituminous Pavement SY 28 $ 1.50 $ 42.00
4 Sawing Bituminous Pavement (Full-Depth) LF 42 $ 4.00 $ 168.00
I 5 Common Excavation CY 8700 $ 7.00 $ 60,900.00
6 Subgrade Excavation CY 2500 $ 6.00 $ 15,000.00
I 7 Select Granular Borrow (CV) CY 2500 $ 5.25 $ 13,125.00
8 Aggregate Base Class-5 (100% Crushed Limestone) SY 11200 $ 6.00 $ 67,200.00
I 9 Bituminous Wear Course 1.5" Thick SY 10680 $ 3.50 $ 37,380.00
10 Bituminous Non-Wear Course 3" Thick SY 10680 $ 5.00 $ 53,400.00
I 11 Bituminous Material for Tack Coat GAL 500 $ 3.50 $ 1,750.00
12 Concrete Curb & Gutter Design B618 " LF ' 5400 $ 8.50 $ 45,900.00
"
I , ,
13 Salvage and Reinstall Mailbox EA 2 $ 100.00 $ 200.00
14 Traffic Control LS 1 $ 1,500.00 $ 1,500.00
I 15 Deciduous Tree 2" Cal. B & B EA 5 $ 250.00 $ 1,250.00
16 Deciduous Tree 2.5" Cal. B & B EA 13 $ 300.00 $ 3,900.00
I 17 Deciduous Tree 3" Cal. B & B EA 8 $ 350.00 $ 2,800.00
18 Silt-Fence, Type Machine Sliced LF 800 $ 2.80 $ 2,240.00
I 19 Seeding ACRE 2.2 $ 1,500.00 $ 3,300.00
20 Sodding Type Lawn .. SY 3825 $ 3.00 $ 11,475.00
I " ..
21 Barricades, Type III EA 9 $ 315.00 $ 2,835.00
, ,
22 F & I Sign Panel Type C EA 11 $ 155.00 $ 1,705.00
I Subtotal $ 342,400.00
+10% Contingency $ 34,24D.DO
I Subtotal $ 376,640.00
+25% Indirect Costs $ 94,160.00
I Total $ 470,800.00
I
I Feasibility Report
Valley View Road Improvements
City of Shako pee. MN
I Preliminary Cost Estimate
I Valley View Road Improvements
City of Shakopee
I Street Improvements on County Road 83
.
Item # Description Units Quantity Unit Price Total
I 1 Mobilization LS 1 $ 3,130.00 $ 3,1S{3:00
2 Sawing Bituminous Pavement (Full-Depth) LF 1450 $ 1.00 $ 1,450.00
I 3 Common Excavation CY 1000 $ 7.00 $ 7,000.00
4 Subgrade Excavation CY 400 $ 6.00 $ 2,400.00
I 5 Select Granular Borrow (CV) CY 400 $ 5.25 $ 2,100.00
6 Aggregate Base Class-5 (100% Crushed Limestone) SY 3000 $ 6.00 $ 18,000.00
I 7 Bituminous Wear Course 1.5" Thick SY 2990 $ 3.50 $ 10,465.00
8 Bituminous Non-Wear Course 3" Thick SY 2990 $ 5.00 $ 14,950.00
I 9 Bituminous Material for Tack Coat GAL 100 $ 3.50 $ 350.00
10 Traffic Control LS 1 $ 1,000.00 $ 1,000.00
I 11 4" Solid Line White-Epoxy LF 2000 $ 0.40 $ 800.00
.
12 4" Double Solid Line Yellow-Epoxy .. . LF 800 $ 0.60 $ 480.00
I , , ,
13 Silt-Fence, Type Machine Sliced LF 1500 $ 2.80 $ 4,200.00
14 Seeding ACRE 0.6 $ 1,500.00 $ 900.00
I 15 F & I Sign Panel Type C EA 5 $ 155.00 $ 775.00
Subtotal $ 68,000.00
I +10% Contingency $ 6,800.00
Subtotal $ 74,800.00
I +25% Indirect Costs $ 18,700.00
, Total $
93,500.00
I
I
I
I
I
I Feasibility Report
Valley View Road Improvements
City of Shakopee,MN
I
Preliminary Cost Estimate
I Valley View Road Improvements
City of Shakopee
I Trail Improvements
Item # Description Units Quantity Unit Price Total
, ,
I 1 Mobilization LS 1 $ 500.00 $ 500.00
2 8' Bituminous Bike Path 21/2" Thick LF 1350 $ 10.00 $ 13,500.00
I Subtotal $ 14,000.00
+10% Contingency $ 1,400.00
I Subtotal $ 15,400.00
+25% Indirect Costs $ 3,850.00
I Total $ 19,250.00
I
I
I
I
I
I
I
I
I
I
I
I Feasibility Report
Valley View Road Improvements
City of Shakopee, MN
I ,
Preliminary Cost Estimate
I Valley View Road Improvements
City of Shakopee
I Street Lighting Improvements
Item # Description Units Quantity Unit Price Total
I 1 1.25" Non-Metallic (PVC) Conduit-Lighting LF 2800 $ 6.00 $ 16,800.00
2 Street Lights EA 11 $ 3,000.00 $ 33,000.00
I Subtotal $ 49,800.00
+10% Contingency $ 4,980.00
I Subtotal $ 54,780.00
+25% Indirect Costs $ 13,695.00
,
I Total $ 68,475.00
I
I
I
I
I
I
I
I
I
I
I
I Feasibility Report
Valley View Road Improvements
City of Shakopee, MN
I Preliminary Cost Estimate
I Valley View Road Improvements
City of Shako pee
I Sanitary Sewer Improvements .
Item # Description Units Quantity Unit Price Total
I . .
1 Mobilization LS 1 $ 450.00 $ 450.00
1 Connect to Existing System EA 1 $ 1,000.00 $ 1,000.00
I 2 Sanitary Manhole LF 10 $ 250.00 $ 2,500.00
3 Casting Assembly (San-MH) EA 1 $ 450.00 $ 450.00
I 4 8" PVC, SDR 35 LF 80 $ 45.00 $ 3,600.00
Subtotal $ 8,000.00
I +10% Contingency $ 800.00
Subtotal $ 8,800.00
I +25% Indirect Costs $ 2,200.00
Total $ 11,000.00
I
I
I
I
I
I
I
I
I
I
I Feasibility Report
Valley View Road Improvements
City of Shakopee, MN .
E Preliminary Cost Estimate
E Valley View Road Improvements
City of Shakopee
I Watermain Improvements
Item # Description Units Quantity Unit Price Total
- 1 Mobilization LS 1 $ 920.00 $ 920.00
2 Hydrant EA 2 $ 2,150.00 $ 4,300.00
m 3 8" Gate Valve and Box EA 1 $ 650.00 $ 650.00
4 12" Gate Valve and Box EA 1 $ 1,000.00 $ 1,000.00
I 5 Connect to Existing Watermain EA 2 $ 1,300.00 $ 2,600.00
6 8" Watermain DIP CL-52 LF 200 $ 18.50 $ 3,700.00
- 7 12" Watermain DIP CL-53 LF 80 $ 46.50 $ 3,720.00
8 Ductile Iron Fittings LBS 700 $ 1.30 $ 910.00
I Subtotal $ 17,800.00
+10% Contingency $ 1,780.00
I Subtotal $ 19,580.00
+25% Indirect Costs $ 4,895.00
I . Total . .
$ 24,475.00
I
I
I
I
I
I
I
I
I Feasibility Report
Valley View Road Improvements
City of Shakopee, MN
I Preliminary Cost Estimate
I Valley View Road Improvements
City of Shakopee
I . Storm Sewer Improvements
Item # Description Units Quantity Unit Price Total
I 1 Mobilization LS 1 $ . 2,350:00 -$ 2,300.00
2 15" RCP Pipe Class-V LF 280 $ 32.00 $ 8,960.00
I 3 18" RCP Pipe Class-V LF 200 $ 34.00 $ 6,800.00
4 21" RCP Pipe C/ass-V LF 130 $ 36.00 $ 4,680.00
I 5 CB-2 X 3 Storm EA 5 $ 1,000.00 $ 5,000.00
.
6 Construct Structure Design 48-4020 LF 40 $ 200.00 $ 8,000.00
I 7 Casting Assembly EA 12 $ 475.00 $ 5,700.00
8 Connect to Existing Storm Sewer System EA 2 $ 1,000.00 $ 2,000.00
I 9 Articular Concrete (Armorflex) SF 240 $ 9.50 $ 2,280.00
10 Geotextile Filter Type-IV SY 30 $ 1.00 $ 30.00
I 11 Random Rip-Rap Class-IV TON 5 $ 38.00 $ 190.00
12 21" FES-RCP Class-Vw/Trash Guard EA 2 $ 1,650.00 $ 3,300.00
. .
I Subtotal $ 49,300.00
+10% Contingency $ 4,930.00
I Subtotal $ 54,230.00
. +25% Indirect Costs $ 13,558.00
I Total $ 67,788.00
I
I
I
I,
I
I
I Feasibility Report
Valley View Road Improvements
City of Shakopee, MN
- - - - - - - - - - - - - - - - - - -
COST APPORTIONMENT
V ALLEY VIEW ROAD IMPROVEMENTS
CITY OF SHAKOPEE
TOTAL CITY SPUC ASSESSABLE FRONT ASSESSABLE COST PER
COST COST COST COST FOOTAGE ACREAGE UNIT
STREET IMPROVEMENTS* $555,875.00 $75,075.00 $0.00 $480,800.00 5188 0 $92.68
CO. ROAD 83 IMPROVEMENTS $93,500.00 $93,500.00 $0.00 $0.00 0 0 $0.00
TRAIL IMPROVEMENTS $19,250.00 $0.00 $0.00 $19,250.00 1328 0 $14.50
STREET LIGHTING IMPROVEMENTS $68,475.00 $34,237.50 $0.00 $34,237.50 5188 0 $6.60
SANITARY SEWER IMPROVEMENTS $11,000.00 $0.00 $0.00 $11,000.00 0 80 $137.50
WATER MAIN IMPROVEMENTS $24,475.00 $0.00 $2,590.00 $21,885.00 0 100 $218.85
-,f STORM SEWER IMPROVEMENTS $67,788.00 $0.00 $0.00 $67,788.00 5188 0 $13.07
TOTAL $840,363.00 $202,812.50 $2,590.00 $634,960.50
* INCLUDING EASEMENTS
- - - - - - - - - - - - - - - - - - -
ASSESSABLE FRONT STREET TRAIL STREET LIGHTING SANITARY WATER MAIN STORM SEWER TOTAL
P.I.D. PROPERTY OWNER LEGAL DESCRIPTION ACRE ACRAGE FOOTAGE ASSESSMENT ASSESSMENT ASSESSMENT SEWER ASSESSMENT ASSESSMENT
ASSESSMENT ASSESSMENT
SCHNEIDER. HAROLD & SECT-21 TWP-115 RNG-022
+ ROBERTA SW 1/2 NW 1/4 & W 1/2 OF .. 60.00 20.00 654 $ 60,609.71 $ 0.00 $ 4,315.98 $ 2,750.00 $4,377.00 $ 8,545.36 $ 80,598.06
2.79E 08 3300 VALLEY VIEW ROAD NW 1/4 NW 1/4
SHAKOPEE. MN 55379
SCHNEIDER, HAROLD &
ROBERTA SECT-16 TWP-115 RNG-022 1.38 0.00 124 $ 11,491.75 $ 0.00 $ 818.32 $ 0.00 $0.00 $ 1,620.22 $ 13,930.29
2.79E+08 3300 VALLEY VIEW ROAD VACATED RR IN SE 1/4 SW 1/4
SHAKOPEE. MN 55379
WECKMAN, ROBERT W. & SECT-21 TWP-115 RNG-022 E
CATHY A. 1/2 NW 1/4 NW 1/4 E 1/2 NW 137.00 60.00 1940 $ 179,790:29 $ 0.00 $ 12,802.77 $ 8,250.00 $13,131.00 $ 25,348.64 $ 239,322.69
2.79E+08 2366 CANTERBURY ROAD
SHAKOPEE. MN 55379 1/4 NW 1/4 NE 1/4 EX 3A
DEUTSCH FAMILY LP. SECT-16 TWP-115 RNG-022 20.00 (Water
2.79E+08 P.O. BOX.189 SE 1/4 SW 1/4 EX RR & ROAD 38.50 main only) 1142 $ 105,835.31 $ 0.00 $ 7,536.47 $ 0.00 $4,377.00 $14,921.72 $ 132,670.51
NEWULM. MN 56073
BAJ-INVESTMENTS L.L.C.
279E 08 211 RIVER RIDGE CIR. SOUTH SECT-16 TWp.115 RNG-022 40.00 0.00 1328 $ 123,072.94 $ 19,250.00 $ 8,763.96 $ 0.00 $0.00 $ 17,352.06 $ 168,438.95
. + STE-106 SW 1/4 SW 1/4
BURNSVILLE. MN 55337
TOTALS 276.88 100.00 5188 $ 480,800.00 $ 19,250.00 $ 34,237.50 $ 11,000.00 $ 21,885.00 $ 67,788.00 $ 634,960.50
Feasibility Report
Valley View Road Improvements
City of S/lakopee. MN
1\...'"
>M~
1!. C',
Q '-
'Y \\
I.[:
--0>-
1':'%
~Q
.'t-
83
I;
II
Ii
'I
II
Ii
.1
RD.
PROJECT
LOCATION
I_"~'_"_.'_"_'._._"_'_"_"_"""~".'''.'''''''_''_'.A''~'~-".~'-'-"-"r"~"-"-"-"~'''-'-''-''-''''_.'-
. .
WOCO DUCK TR. ! )(
;
!
; ~
f <:
i
i
!
;
1 <:
i ro
:::li..
'V~ ..,-..-.."'''''''..----.., [" - J~
....---....--11 @
83
! d
FEASIBILITY REPORT SCALE ,. . 1500' DRAWING NO:
VALLEY VIEW ROAD IMPROVEMENTS 0 1500 1
---
PROJECT LOCATION MAP - - -
-
~13 O'VOl::l ^-LNnOO
_u_u__ PROPOSED ROW
EXISTING ROW I
I
+
~ )
~
8
~
66' EXISTING ROW
~
~o
~...
u.lii
~~
~C\J
0
c
~
~
~
":0
~~
USj
U...
iijN
;:
"
B
0
a:
0
~
a:
:!:
UJ
1 5
I ~
I
I
I ..J
, ..J
I
, ~
1
1
I
,
,
I
I
I
I
I
I
I
I
I
I
I
---: 83' PROPOSED ROW
,
I
I
I
I
I
I
I
(/) I
~ I
I
0 I
I
U :is ,
tU I
lii I
Q) I
1
:2 ~ I
I N I
.:L I
Co I
I
Cl.. I
,
,
1
I
I
,
I
I
I
I
I
I
I
I
I
,
17' ROW ACQUISITION ---'
83' EXISTING ROW
FEASIBILITY REPORT SCAlE 1" = 300' DRAWING NO:
VALLEY VIEW ROAD IMPROVEMENTS D 300 2
PROPOSED RIGHT-OF-WAY MAP ~--- ,
~-
l I
- ~_.-.. ,...------.---.,----_. --"---'~_.'-'._~
-~-,,-- -
-l
I 0
z
Cl cYJ
z
~
I <(
0::
a
I 0
Park-Meadows ~
-0
~
"
'-
I Deutsch-Family LP w
279160070 ~
<(
u
BAJ-Investments LLC V1
0
279160050
I n
OJ
I
COUNTY ROAD VJ
I IMPROVEMENTS h
<
~
I ----~ WATERIv1AIN ~ ~~
---, h~~
-------.~IT'ES BY ?THERS CROSSING ~
-- ~~~ C<alf.1
<9 X' WATERMAIN
I iJ% /CROSSINGS a~E--
8' BITUMINOUS If;~
~(() ~ z
L TRAIL ~~~
I -- -----....... - ..... .,.... -....----- -..,.-.,.--.. ---. . ---"""'--"'-,-- -...- .-- ~ __ _ .":-~::=,.,._....-. :~."'--,' .-:---= _ __..~.-::.:--"""::-._-.--~-...""-O:--:-...~-.......,,-.--:7--:-:::~,...:,....,..:. .. .::...~-,:-'~-:-----'"-.~..._ ~~~
..... --"."-- '-'_", .-. - .. ....-- ........,. ,,'-,-.' ..
----------.-----------------------.---------- - ---V-A-l:::t EY--VlEW -R8 AS------------------------------------ ---- >-
--- .-'-'-.-~-'~'---.-'-.-.-'-'-----'-'---'-.-.-'-'-'-'----. ~~O
I h~~
44' WIDE, 9-TON ROADWAY 44' WIDE, 9-TON ROADWAY ~ao...
~~23
cq
I ......,~~
CI) ~
~~~
I ~~3
~~
~o...
I ~
Robert W_ and Cathy A. Weckman ~
279210020 ~
I Harold Schneider
279210010
I ~
I -, ,- PROPOSED W A TERMAIN
< PROPOSED SANITARY SEWER ~~
" PROPOSED STORM SEWER ~I
-, ,- WATERMAIN BYOTHERS
I SANITARY SEWER BY OTHERS ~~
.( STORM SEWER BY OTHERS